Laserfiche WebLink
GBNEB41 GB4DCNG NOTBS· <br />I. ALL GRADING SHALL COMPLY WITH 2010 CBC CHAPTERS 18 AND 33, AND <br />APPENDIX J AND THE SANTA ANA MUNICIPAL CODE. A CITY GRADING <br />PERMIT IS REQUIRED FOR GRADING. <br />2. GRADING SHALL NOT BE STARTED WITHOUT FIRST NOTIFYING THE CITY <br />GRADING INSPECTOR. A PRE-GRADING MEETING ON THE SITE IS REQUIRED <br />BEFORE STARTING OF GRADING WITH THE FOUOWING PEOPLE PRESENT: <br />GRADING CONTRACTOR, DESIGN CIVIL ENGINEER, GEOTECHNICAL <br />ENGINEER, GRADING INSPECTOR AND WHEN REQUIRED, THE <br />ARCHAEOLOGIST AND PALEONTOLOGIST. THE REQUIRED INSPECTIONS <br />FOR GRADING WILL BE EXPLAINED AT THIS MEETING. <br />3. AN APPROVED COPY OF THE GRADING PLANS SHALL BE ON THE PERMIITED <br />SITE WHILE WORK IS IN PROGRESS. <br />4. THE DESIGN CIVIL ENGINEER SHALL BE AVAILABLE DURING THE GRADING TO <br />VERIFY COMPLIANCE WITH THE PLANS, SPECIFICATIONS, CODE AND ANY <br />SPECIAL CONDITIONS OF THE PERMIT WITHIN HIS PURVIEW. <br />5. THE GEOTECHNICAL ENGINEER SHALL PERFORM PERIODIC INSPECTIONS <br />AND SUBMIT A COMPLETE REPORT AND MAP UPON COMPLETION OF THE <br />ROUGH GRADING. THE COMPACTION REPORT AND APPROVAL FROM THE <br />GEOTECHNICAL ENGINEER SHALL INDICATE THE TYPE OF FIELD TESTING <br />PERFORMED. EACH TEST SHALL BE IDENTIFIED WITH THE METHOD OF <br />OBTAINING THE IN-PLACE DENSITY, WHETHER SAND CONE OR DRIVE RING <br />AND SHALL BE SO NOTED FOR EACH TEST. SUFFICIENT MAXIMUM DENSITY <br />DETERMINATIONS SHALL BE PERFORMED TO VERIFY THE ACCURACY OF <br />THE MAXIMUM DENSITY CURVES BY THE FIELD TECHNICIAN <br />6. CUT AND FIU SLOPES SHALL BE NO STEEPER THAN 2 FOOT HORIZONTAL TO I <br />FOOT VERTICAL (2:1) EXCEPT WHERE SPECIFICALLY APPROVED <br />OTHERWISE. <br />7. FILLS SHALL BE COMPACTED THROUGHOUT TO A MINIMUM OF 90% <br />RELATIVE DENSITY AGGREGATE BASE FOR ASPHALTIC AREAS SHALL BE <br />COMPACTED TO MINIMUM OF 95% RELATIVE DENSITY MAXIMUM DENSITY <br />SHALL BE DETERMINED BY UNIFORM BUILDING CODE STANDARD NO. 70-1 <br />OR APPROVED EQUIVALENT. AND FIELD DENSITY BY UNIFORM CODE <br />STANDARD NO. 70-2 ORAPPROVEDEQUIVALENT. <br />8. THE CONTRACTOR SHALL NOT CREATE ANY TRENCH OR EXCAVATION 5-FEET <br />OR MORE WITHOUT THE NECESSARY PERMIT FROM THE STATE OF <br />CALIFORNIA DIVISION OF INDUSTRIAL SAFETY. <br />9. ALL CUT SLOPED SHALL BE INVESTIGATED BOTH DURING AND AFTER <br />GRADING BY THE GEOTECHNICAL ENGINEER TO DETERMINE IF ANY SLOPE <br />STABILITY PROBLEM EXISTS. SHOULD EXCAVATION DISCLOSE ANY <br />GEOLOGICAL HAZARDS OR POTENTIAL GEOLOGICAL HAZARDS, THE <br />GEOTECHNICAL ENGINEER SHALL SUBMIT RECOMMENDED TREATMENT TO <br />THE CITY ENGINEER FOR APPROVAL. <br />JO. THE PERMITEE IS RESPONSIBLE FOR DUST CONTROL MEASURES. WATER <br />ACTIVE SITES AT LEAST TWICE DAILY. <br />II. THE LOCATING AND PROTECTION OF ALL EXISTING UTILITIES IS THE <br />RESPONSIBILITY OF THE PERMITTEE. <br />12. GRADING OPERATIONS INCLUDING MAINTENANCE OF EQUIPMENT WITmN <br />ONE-HALF MILE OF HUMAN OCCUPANCY SHALL NOT BE CONDUCTED <br />BETWEEN THE HOURS OF 5:00P.M AND 7:00A.M <br />13. THE PERMITTEE SHAU GIVE REASONABLE NOTICE TO THE OWNER OF <br />ADJOINING LANDS AND BUILDINGS PRIOR TO BEGINNING EXCAVATIONS <br />WHICH MAY AFFECT THE LATERAL AND SUBJACENT SUPPORT OF THE <br />ADJOINING PROPERTY. THE NOTICE SHALL STATE THE INTENDED DEPTH <br />OF EXCAVATION AND WHEN EXCAVATION COMMENCES. THE ADJOINING <br />OWNER SHALL BE ALLOWED AT LEAST 30 DAYS AND REASONABLE ACCESS <br />ON THE PERMIITED PROPERTY TO PROTECT HIS STRUCTURE, IF HE SO <br />DESIRES, UNLESS OTHERWISE PROTECTED BY LAW. <br />14. AU EXISTING DRAINAGE COURSES THROUGH THE SITE SHALL REMAIN <br />OPEN TO HANDLE THE STORM WATER; HOWEVER, IN ANY CASE, THE <br />PERMIITEE SHALL BE HELD LIABLE FOR ANY DAMAGE DUE TO <br />OBSTRUCTING NATURAL DRAINAGE PAITERNS. <br />15. APPROVED EROSION PROTECTION DEVICES SHALL BE PROVIDED AND <br />MAIN'I'AINED DURING THE RAINY SEASON AND SHALL BE IN PLACE AT THE <br />END OF EACH DAY'S WORK. PROPER EROSION CONTROL MEASURES MUST <br />BE SHOWN ON THE PLANS. <br />16. CONSTRUCTION SITES SHAU BE MAINTAINED IN SUCH A CONDITION THAT <br />AN ANTICIPATED STORM DOES NOT CARRY WASTES OR POLLUTANTS OFF <br />THE SITES. <br />DISCHARGES OF MATERIAL OTHER THAN STORM WATER ARE ALLOWED ONLY <br />WHEN NECESSARY FOR PERFORMANCE AND COMPLETION OF <br />CONSTRUCTION PRACTICES AND WHERE THEY DO NOT: CAUSE OR <br />CONTRIBUTE TO A VIOLATION OF ANY WATER QUALITY STANDARD; CAUSE <br />OR THREATEN TO CAUSE POLLUTION, CONTAMINATION, OR NUISANCE; OR <br />CONTAIN A HAZARDOUS SUBSTANCE IN A QUANTITY REPORTABLE UNDER <br />FEDERAL REGULATIONS 40 CFR Ill AND 302. <br />POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT LIMITED TO: SOLID OR <br />LIQUID CHEMICAL SPILLS; WASTES FROM PAINTS, STAINS, SEALANTS, GLUES, <br />LIMES, PESTICIDES, HERBICIDES, WOOD PRESERVATIVES AND SOLVENTS; <br />ASBESTOS FIBERS, PAINT FLAKES OR STUCCO FRAGMENTS; FUELS, OILS, <br />LUBRICANTS, AND HYDRAULIC RADIATOR OR BAITERY FLUIDS; <br />FERTILIZERS, VEfilCLES/EQUIPMENT WASH WATER AND CONCRETE WASH <br />WATER; CONCRETE, DETERGENT OR FLOATABLE WASTES; WASTES FROM <br />ANY ENGINE/EQUIPMENT STEAM CLEANING OR CHEMICAL DEGREASING; <br />AND SUPERCHLORINATED POTABLE WATER LINE FLUSHJNGS. <br />DURING CONSTRUCTION, DISPOSAL OF SUCH MATERIALS SHOULD OCCUR IN A <br />SPECIFIED AND CONTROUED TEMPORARY AREA ON-SITE, PHYSICALLY <br />SEPARATED FROM POTENTIAL STORM WATER RUN-OFF, WITH ULTIMATE <br />DISPOSAL IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL <br />REQUIREMENTS. <br />17. DEWATERING OF CONTAMINATED GROUNDWATER, OR DISCHARGING <br />CONTAMINATED SOILS VIA SURFACE EROSION IS PROHIBITED. DEWATERING <br />OF NON-CONTAMINATED GROUNDWATER REQUIRES A NATIONAL <br />POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMIT FROM THE <br />RESPECTIVE STATE REGIONAL WATER QUALITY CONTROL BOARD. <br />18. AU DIRT. SAND, MUD, OR DEBRIS DEPOSITED OR SPILLED UPON PUBLIC <br />STREETS DURING ANY GRADING, HAULING, OR EXPORT OPERATIONS SHALL <br />BE IMMEDIATELY CLEANED UP BY THE DEVELOPER, HIS CONTRACTOR, <br />SUBCONTRACTORS, OR AGENTS TO THE SATISFACTION OF THE CITY <br />ENGINEER. FAILURE TO DO SO WIU BE CAUSE FOR STOPPING ALL SUCH <br />GRADING, HAULING, OR EXPORT WORK BY THE CITY UNTIL SUCH TIME AS <br />THE STREETS ARE CLEANED. <br />19. AU TRUCKS HAULING DIRT. SAND, OIL, OR OTHER LOOSE MATERIALS ARE <br />TO BE COVERED OR SHOULD MAJN'I'AJN A LEAST TWO FEET OF FREEBOARD <br />IN ACCORDANCE WITH THE REQUIREMENTS OF eve SECTION 23ll4. <br />20. CONTRACTOR IS RESPONSIBLE FOR THE REPAIR OF AU DAMAGES TO <br />PUBLIC PROPERTIES THAT ARE CAUSED BY THE WORK ON-SITE. REPAIR <br />MUST BE COMPLETED TO THE SATISFACTION OF THE CITY ENGINEER. <br />21. MINIMUM ASPHALT PAVEMENT SECTION SHAU BE: <br />COMMERCIAL AND INDUSTRIAL: <br />PARKING STALLS -3" A.C. OVER 6" A.B <br />DRIVE AISLES-3" A.C. OVER 10" A.B. <br />MULTI-FAMILY.· <br />PARKING STALLS-3" A.C. OVER 4" A.B. <br />DRIVE AISLES-3" A.C. OVER 8" A.B. <br />OR PER THE GEOTECHNICAL REPORT WHEN THICKER SECTION IS REQUIRED. <br />22. EARTHWORK VOLUMES: <br />CUT.·5CUBIC YARDS <br />FILL: 35CUBIC YARDS <br />NET.· 30CUBIC YARDS <br />SUBMIT HAUL ROUTES FOR APPROVAL IF NET VOLUMES EXCEED 500 CUBIC <br />YARDS. <br />23. SEPARATE PERMITS MUST BE OBTAINED FROM THE CITY BUILDING AND <br />SAFETY DIVISION FOR THE CONSTRUCTION OF RETAINING WALLS, LIGHT <br />POLES, TRASH ENCLOSURES, ON-SITE PLUMBING AND ALL BUILDING <br />STRUCTURES. <br />ESTIMATE OF EARTHWORK QUANTITIES: <br />CUT-5 C.Y. FILL -35 C.Y. <br />OVEREXCAVATION-30 C.Y. <br />ACREAGE -0.27 ACRE <br />PRIVATE ENGINEER'S. NOTICE TO CONTRACTORS <br />THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN ON THIS PLAN ARE OBTAINED BY A SEARCH <br />OR AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS. THE <br />CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN AND ANY OTHER LINES OR <br />STRUCTURES NOT SHOWN ON THESE PLANS. <br />ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING WORK SHOWN ON OR RELATED TO THESE PLANS SHALL CONDUCT THEIR <br />OPERATIONS SO THAT ALL EMPLOYEES ARE PROVIDED A SAFE PLACE TO WORK AND THE PUBLIC JS PROTECTED. ALL CONTRACTORS AND <br />SUBCONTRACTORS SHALL COMPLY WITH THE "OCCUPATIONAL SAFETY AND HEALTH REGULATION" OF THE U.S. DEPARTMENT OF LABOR, <br />AND WITH THE STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS' "CONSTRUCTION SAFETY ORDERS." <br />I <br />.I , I r / <br />'' ' I i / I <br />II :/! I <br />I J I I • /1r---_.,__J <br />I <br />@~&000&@~ ~[s&OO <br />PROPOSED NEW DETACHED ADU <br />DUNG PHAM <br />2726 STRAWBERY LN, UNIT 2, SANTAANA, CA 92706 <br />CONTRACTOR FURTHER AGREES THAT HE SHAU ASSUME SOLE AND COMPLETE RE-SPONSIBILITY FOR JOB SITE CONDITIONS DURING THE <br />COURSE OF CONSTRUCTION OF Tms PROJECT. INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIRE-MENT SHALL <br />APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WOR.KJNG HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND <br />HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNEC-TJON WITH THE <br />PERFORMANCE OF WORK ON THIS PROJECT. EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE <br />ENGINEER. <br />I ,:,~,-- <br />en...__ i~' l,,I ,,flJJ ! ~ ~ N0°17'05"W 137.75' <br />IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO EXAMINE THE STAKES BEFORE COMMENCING THE OPERATIONS. SHOULD OCCASION <br />ARISE WHERE THE VALIDITY OF A STAKE JS QUESTIONABLE, EITHER AS TO ITS LOCATION OR THE OFFSET MARKED THEREON, OR AS TO THE <br />ELEVATION OF CUT OR FILL MARKED THEREON. CONTRACTOR SHALL NOTIFY THE ENGINEER WHO WILL CHECK THE STAKE OR STAKES IN <br />QUESTION. ANY STAKES FOUND TO BE IN ERROR WJLLBE RESET WITHOUT CHARGE. IT JS UNDERSTOOD THAT THE ENGINEER WILL NOT BE <br />CHARGED FOR ANY STANDBY OR "DOWN" TIME AS A RESULT OF SUCH CHECKING AND/OR RESEITING PROCEDURE. THE ENGINEER IS NOT <br />LIABLE FOR AUEGED ERRORS WHEN STAKES HAVE BEEN DESTROYED AND FIELD NOTES AND RECORDS INDICATE STAKES WERE SET <br />CORRECTLY. <br />EXACT LAYOUTS OF ALL HARDSCAPE ELEMENTS MAY NEED TO BE MODIFIED AND SOME FIEWADJUSTMENTS MAY BE NECESSARY. THE <br />CONTRACTOR SHALL INCLUDE AS PART OF THE BID, TIME AND LABOR FOR ANY MODIFICATIONS NECESSARY TO IMPLEMENT THE INTENT OF <br />THE DRAWINGS. <br />THE CONTRACTOR IS RESPONIBLE FOR DETERMINING QUANTITIES. THE IMPROVEMENTS AND EARTHWORK QUANTITIES SHOWN HEREON <br />ARE NOT TO BE USED FOR BIDDING OR ESTIMATING. <br />CALIFORNIA COUNCIL OF CIVIL ENGINEER & LAND SURVEYOR <br />CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUCTION <br />CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF <br />CONSTRUCTION OF THE PROJECT. INCLUDING SAFETY OF ALL PERSONS AND PROPERTY.· THAT Tms REQUIREMENT SHAU BE MADE TO <br />APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WOR.KJNG HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO <br />DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FORM ANY AND ALL LIABILITY. REAL OR AUE GED, IN CONNECTION <br />WITH THE PERFORMANCE OF WORK ON THIS PROJECT. EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF DESIGN <br />PROFESSIONAL. <br />I <br />I <br />_J-, <br />~ <br />UNAUTHORIZED CHANGES & USES <br />CAUTION: THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO OR <br />USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS. <br />NOTES: <br />I-ALL CONSTRUCTION WORK WITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE UNDER SEPERATE PERMIT. <br />2-THE CONTRACTOR SHALL BE FAMILIAR WITH THE PROJECT SOIL REPORT AND ANY SUPPLEMENTS. <br />3-THE CONTRACTOR JS RESPONSIBLE FOR DETERMINING IMPROVEMENT AND EARTHWORK QUANTITIES. THE <br />IMPROVEMENTS AND EARTHWORK QUANTITIES SHOWN HEREON ARE NOT TO BE USED FOR BIDDING OR <br />ESTIMATING. <br />4-FOR INFORMATION ONLY. BLOCK WALLS TO BE INSPECTED BY OTHERS UNDER A SEPARATE PERMIT. APPROVAL OF <br />Tms PLAN DOES NOT CONSTITUTE APPROVAL OF THE STRUCTURAL INTEGRITY OF BLOCK WALLS. <br />GENERAL NOTES FOR PUBLIC WORKS PERMITTED WORK ON WAT.ER DISTRIBUTION SYSTEM <br />I. CONSTRUCTION AND INSTALLATION OF ALL WATER MAINS AND APPURTENANCES SHALL BE IN ACCORDANCE WITH THE CITY <br />OF SANTA ANA STANDARD PLANS AND SPECIFICATIONS. WHERE THE STANDARD PLANS ARE SILENT. CONSTRUCTION AND <br />INSTALLATION OF WATER MAINS AND APPURTENANCES SHALL CONFORM TO THE AMERICAN WATER WORKS ASSOCIATION <br />(AWWA) SPECIFICATIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, 2012 EDITION. <br />2. CONSTRUCTION OF WATER MAINS AND APPURTENANCES SHALL ONLY BE PERFORMED BY QUALIFIED CONTRACTORS WITH A <br />VALID CALIFORNIA CONTRACTOR A OR C34 LICENSE. <br />3. NO PERSON, OTHER THAN CITY OF SANTAANA WATER RESOURCES DIVISION STAFF CERTIFIED BY THE STATE OF CALIFORNIA <br />AS A WATER DISTRIBUTION OPERATOR, SHALL BE ALLOWED TO OPERATE THE CITY'S WATER SYSTEM VALVES. <br />4. NO PERSON, OTHER THAN CITY OF SANTAANA WATER RESOURCES DIVISION STAFF CERTIFIED BY THE STATE OF CALIFORNIA <br />AS A WATER DISTRIBUTION OPERATOR, SHALL SHUT WATER SERVICE OFF TO ANY CUSTOMER. <br />5. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT TO THE CITY FOR REVIEW AND APPROVAL <br />"DISINFECTION AND FLUSHING PLAN" PER THE CITY OF SANTA ANA DESIGN GUIDELINES AND STANDARD DRAWINGS. <br />6. ALL NEWLY CONSTRUCTED WATER MAINS AND APPURTENANCES SHALL BE DISINFECTED AND TESTED IN ACCORDANCE WITH <br />AMERICAN WATER WORKS ASSOCIATION STANDARD C600'S, PRIOR TO CONNECTING TO THE CITY'S WATER DISTRIBUTION <br />SYSTEM DISINFECTION TESTING RESULTS SHALL BE SUBMIITED TO THE WATER RESOURCES DIVISION FOR REVIEW AND <br />APPROVAL PRIOR TO CONNECTING TO THE CITY'S WATER DISTRIBUTION SYSTEM <br />7. WATER MAINS WILL BE HYDROSTATIC TESTED AT 200 PSI FOR 2 HOURS. NEW WATER MAINS CANNOT BE TESTED AGAINST AN <br />EXISTING VALVE BUT CAN BE TESTED USING A TEST PLATE. <br />8. REQUESTS TO SHUT-DOWN THE WATER DISTRIBUTION SYSTEM FOR TIE-INS OR OTHER PURPOSES SHALL BE COORDINATED <br />WITH THE WATER RESOURCES DIVISION STAFF AT LEAST 2 WEEKS IN ADVANCE THROUGH THE CITY INSPECTOR. ALL <br />CUSTOMERS AFFECTED BY THE PROPOSED SHUT DOWN SHALL BE NOTIFIED IN WRITING 48 HOURS IN ADVANCE BY THE <br />CONTRACTOR. <br />9. THE CITY OF SANTAANA WATER RESOURCES DIVISION CANNOT GUARANTEE A COMPLETE SHUTDOWN OF EXISTING MAINS. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING AND ISOLATION OF CONSTRUCTION FOR TESTING OR ANY <br />OTHER PURPOSES. <br />10. ALL FIRE HYDRANTS wmcH ARE OUT OF SERVICE OR NEW FIRE HYDRANTS WHICH HAVE NOT BEEN ACCEPTED FOR SERVICE <br />SHALL BE COVERED WITH A SACK INDICATING THAT THE HYDRANTS ARE NOT IN SERVICE. <br />II. MAINTAINING WATER SERVICE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR ANY SHUTDOWN LASTING LONGER <br />THAN FOUR (4) HOURS. METHOD OF PROVIDING TEMPORARY SERVICE MUST BE APPROVED BY THE WATER RESOURCES <br />DIVISION. THE WATER SHALL BE SAFE FOR DRINKING IN ACCORDANCE WITH STATE OF CALIFORNIA WATER RESOURCES <br />CONTROL BOARD (SWRCB} DRINKING WATER PROGRAM (DWP). <br />12. WATER METER WIU NOT BE INSTALLED NOR WATER TURNED ON UNTIL THE BACKFLOW DEVICES REQUIRED FOR THE <br />BUILDING AND IRRIGATION SYSTEMS HAVE BEEN INSTALLED, TESTED, APPROVED, AND SIGNED OFF BY THE CITY CONTACT <br />WATER RESOURCES DIVISION AT 714 647 3320. <br />13. ALL WATER MAINS SHALLBEAWWA C-900 PVC, DR14 PIPE ORAWWA C-151 DUCTILE IRON PIPE. ALL OTHER PIPE MATERIALS <br />REQUIRE SPECIAL REVIEW AND APPROVAL FROM WATER RESOURCES DIVISION. <br />14. WATER MAINS SHALL HAVE 36" MINIMUM COVER TO FINISHED GRADE. ANY DEVIATION FROM TmS REQUIREMENT REQUIRES <br />APPROVAL FROM THE WATER RESOURCES DIVISION. <br />15. CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL UTILITIES AND POINTS OF CONNECTION PRIOR TO TRENCHING. <br />16. PRIVATE WATER APPURTENANCES SUCH AS BACKFLOW PREVENTERS, FIRE HYDRANTS AND STANDPIPES, AND VALVES SHALL BE <br />PAINTED AS FOUOWS. <br />a. DOMESTIC WATER: BLUE <br />b. POTABLE JRRJGATION: GREEN <br />c. RECYCLED IRRIGATION.· PURPLE <br />d. FIRE PROTECTION: OSHA SAFETY RED <br />17. DO NOT CUT OR SNAP CUT OR MILL ASBESTOS CEMENT PIPE. WHERE JOINING EXISTING ASBESTOS CEMENT PIPE, EXPOSE SIX <br />FEET IN EACH DIRECTION, LOOKING FOR THE NEAREST JOINT AND JOIN TO NEW PIPE WITH A PROPERLY DIMENSIONED <br />ADAPTER PER STANDARD PLAN NUMBER 1443. <br />INDEX TO PROJECT DRAWINGS <br />SHEETNO. DESCRIPTION <br />I TITLE SHEET. EROSION & HORIZONTAL CONTROL PLAN <br />2 DRALNAGE PLAN, DETAILS AND SECTIONS <br />EROSION CONTROL NOTES <br />ITEM DESCRIPTION <br />(SE-6) INST.AU TYPICAL GRAVEL BAG PER DETAIL HEREON <br />(WM-8) CONCRETE WASTE MANAGEMENT PER DETAIL HEREON <br />(WM-1) MATERIAL DELIVERY AND STORAGE <br />(WM-) SANITARY WASTE MANAGEMENT (PORTABLE TOILET) <br />INLET PROTECTION PER DETAIL HEREON <br />GENERAL NOTES FOR PUBLIC WORKS PERMITTED WORK ON SEWER COLLECTION SYSTEM <br />I. CONSTRUCTION AND INSTALLATION OF ALL SEWER MAINS AND APPURTENANCES SHALL BE IN ACCORDANCE WITH THE CITY <br />OF SANTA ANA STANDARD PLANS AND SPECIFICATIONS. WHERE THE STANDARD PLANS ARE SILENT. CONSTRUCTION AND <br />INSTALLATION OF SEWER MAINS AND APPURTENANCES SHALL CONFORM TO THE AMERICAN PUBLIC WORKS ASSOCIATION <br />(APWA} SPECIFICATIONS. <br />2. CONSTRUCTION OF SEWER MAINS AND APPURTENANCES SHALL ONLY BE PERFORMED BY QUALIFIED CONTRACTORS WITH A <br />VALID CALIFORNIA CONTRACTOR A OR C34 LICENSE. <br />3. ALL NEWLY CONSTRUCTED SEWER MAINS AND APPURTENANCES SHALL BE TESTED IN ACCORDANCE WITH APWA <br />SPECIFICATIONS. ALL NEWLY CONSTRUCTED SEWER MAINS, LATERALS AND MANHOLES MUST BE INSPECTED VIA CLOSED <br />CIRCUIT TELEVISION CAMERA BY A NATIONAL ASSOCIATION OF SEWER SERVICE COMPANIES (NASSCO) CERTIFIED <br />TECHNICIAN AND VIDEO SUBMIITED IN A DIGITAL FORMAT TO THE WATER RESOURCES DIVISION FOR REVIEW AND FINAL <br />ACCEPTANCE OF WORK. <br />4. ALL SEWER MAINS SHALL BE VITRIFIED CLAY PIPE (VCP) PIPE OR PVC SDR-26 PIPE. ALL OTHER PIPE MATERIALS REQUIRE <br />SPECIAL REVIEW AND APPROVAL FROM THE WATER RESOURCES DIVISION. <br />5. TRENCH PLATES SHALL BE FLUSH WITH PAVEMENT. <br />6. CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL UTILITIES PRIOR TO TRENCmNG. <br />7. WHEN PUBLIC SEWER FACJLIDES ARE LOCATED ON PRIVATE PROPERTY. EASEMENT DOCUMENTS ARE TO BE SUBMIITED TO <br />CITY FOR APPROVAL PRIOR TO A PERMIT BEING ISSUED. <br />8. FINAL ACCEPTANCE WIU NOT OCCUR UNTIL ORIGINAL RECORD DRAWINGS ON MY.UR AND DIGITAL FORMAT ARE <br />DELIVERED TO AND ACCEPTED BY THE CITY'S INSPECTOR. SHOW ALL FIELD CHANGES ON RECORD DRAWINGS. <br />9. SEWER SYSTEM MANHOLE COVERS AND RINGS REMOVED FROM THE FIELD SHALL BE RETURNED AND DELIVERED TO THE <br />CITY WATER RESOURCES DIVISION YARD LOCATED AT 215 S. CENTER STREET. PRIOR NOTIFICATION OF THE DELIVERY IS <br />REQUIRED AT 714-647-3320. <br />Stockpiled Material <br />2 GRAVELBAG HIGH <br />MIN. FOR ALL STORM <br />DRAIN INLETS <br />18. DO NOT TAP EXISTING MAINS WITHOUT THE PRESENCE OF A CERTIFIED PUBLIC WORKS INSPECTOR. PRESSURE TEST TAPPING <br />SLEEVE IN THE PRESENCE OF A CERTIFIED PUBLIC WORKS INSPECTOR BEFORE TAPPING EXISTING MAIN <br />19. FINAL ACCEPTANCE WILL NOT OCCUR UNTIL ORIGINAL RECORD DRAWINGS ON MYLAR AND DIGITAL FILE ARE DE.LIVERED TO <br />AND ACCEPTED BY THE CITY'S INSPECTOR. SHOW ALL FIELD CHANGES ON RECORD DRAWINGS. <br />20. TRENCH PLATES SHALL BE FLUSH WITH PAVEMENT AND SHAU BE NON-SKID. <br />GRAVELBAG AT STORM DRAIN INLET 0 <br />N.T.S. <br />21. WHEN PUBLIC WATER FACILIDES ARE LOCATED ON PRIVATE PROPERTY EASEMENT DOCUMENTS ARE TO BE SUBMIITED TO <br />CITY FOR APPROVAL PRIOR TO A PERMIT BEING ISSUED. <br />22. ALL RECYCLED WATER PROJECTS REQUIRE REVIEW AND APPROVAL BY THE WATER RESOURCES DIVISION. <br />23. REMOVE FROM THE FIELD UPPER AND LOWER FIRE HYDRANT DRY BARREL AND 24" X 36" IRON VAULT LID COVERS AND <br />DELIVER UNDAMAGED TO THE CITY WATER RESOURCES DIVISION YARD LOCATED AT 215 S. CENTER STREET. PRIOR <br />NOTIFICATION OF THE DE.LIVERY IS REQUIRED AT 714-647-3320. <br />24. WATER MAIN FITTINGS SHALL BE FLANGE OR MECHANICAL JOINTS ONLY, NO PUSH-ON JOINT FITTINGS ALLOWED. <br />25. CONTRACTOR SHALL NOT REMOVE OR DISPOSE EXISTING WATER METERS. CONTRACTOR SHALL APPLY FORAN ABANDON <br />WATER METER APPLICATION. CONTRACTOR SHALL CONTACT WATER RESOURCES DmSION AT 714-647-3320 FOR EXISTING <br />METER REMOVALS. <br />26. INSTALLATION OF NEW WATER METER SERVICE CURB STOP SHALL BE DONE AFTER INSTALLATION OF NEW CURB AND GUITER <br />OR AFTER CONTRACTOR HAS ESTABLISHED THE PROPOSED CURB GRADE BY STAKING OF THE PROPOSED CURB. <br />~~;.]_ \~ .--'-.c"-c :-"--·__,, ':.--' <br /><-::/ <br />,'-;7>,_Y,,, /, <br />Notes: <br />SANDBAGS/GRAVEL BAGS <br />PLACED TJGHI'LY TOGETHER <br />ALL AROUND MATERIAL <br />1. Dirt and other construction related materials placed in the street or on other impervious <br />surfaces must be contained with sandbags or other measures to prevent transport to the <br />stormdrain system. <br />2. Any constrnction material stored or stockpiled on-site shall be protected from being <br />transported by the force of wind or water. <br />MATERIAL STORAGE(}) <br />N.T.S. <br />3" MIN OPENING BETWEEN <br />BAGS TOP ROW <br />E~92~T, <br />SECTION 1-1 <br />R <br />TYPICAL GRAVELBAG DETAIL0 <br />N.T.S. <br />LEGAL DESCRIPTION: <br />TRACT 1351, LOT 32, BOOK 41, PAGE 27 <br />APN: 101-1£-28 <br />Notes: <br />CONCRETE <br />WASHOUT <br />AREA <br />1. Excess and wmte concrete shall not be washed into the street or into a drainage system. <br />2. For washout of concrete and mortar products, a desig1Jated containment facility of <br />sufficient capacity to retain liquid mid solid waste shall be provided on site. <br />3. Slurry from concrete and asphalt saw cutting shall be vacuumed or contained, dried, <br />picked up and disposed of properly. <br />CONCRETE WASTE MANAGEMENT (}) <br />N.T.S. <br />FOR PUBLIC SEWER AND WATER FACILITIES ONLY <br />APPROVED BY.· <br />CESARE. BARERRA P.E. <br />DEPUTY PUBLIC WORKS DIRECTOR/ <br />WATER RESOURCES MANAGER <br />DATE <br />24.5' <br />!;; ~ is >,; ~ ~ "' <br />~ <br />VICINITY MAP <br />NTS <br />2 .8' 15.5' <br />•.•. t •.•. I <br />. •.• I <br />-: -: t • .•. I <br />.•.• I <br />. •.• I <br />,~rn-• -I <br />TRADKAVE <br />;;i HUCKLEBERRY RD >,; <br />~ <br />::i ~ ~ STRAWBERY LN • .... "' PROJECT "- <br />SITE ! "' <br />WESTMINSTER ST <br />Underground Service Alert BENCH MARK REVISIONS DEVELOPER/OWNER SOILS ENGINEER APPROVED BY, DRAWN BY, KN 08/2024 TITLE SHEET, EROSION & nss, DESIGNED BY, LP 08/2024 <br />JC-ll6-69: 95.809 (NAVD88 2005) <br />LY PHAN --\ p 1-f <br />REV. DATE BY DESCRIPTION APP'V'D BUILDING DEPT. CHECKED BY, BT 08/2024 HORIZONTAL CONTROL PLAN APPROVED BY: P.E. PREPARED UNDER THE SUPERV1SION OF: <br />~ <br />",oRc reu <br />sc~" <br />1 w Call: TOLL FREE i u (~ "' 1-800-422-4133 -MONUMENT IS LOCATED IN THE NORTHWESTER.LY CORNER OF <br />THE INTERSECTION OF WESTMINSTER BOULEVARD AND <br />FAIRVIEW ROAD, 112 FT. NORTHERLY OF THE CENT.ERLINE OF <br />WESTMINSTER BOULEVARD AND 45 FT. WESTER.LY OF THE <br />CENT.ERLINE OF FAIRVIEW ROAD. MONUMENT JS SET LEVEL <br />WITH THE SIDEWALK <br />DUNGPHAM TMC ENGINEERS INC. <br />2726 STRAWBERY LN TIENCHU,PE <br />SANTA ANA, CA 92706 RCA 72324, EXP. 6-30-2026 <br />7/4-856-212/ 9542 PACIFIC AVE, ANAHEIM, CA 92804 <br />RCE63381 No. C63381 <br />EXP. 9-30-2026 DUNG PHAM PLANNING DEPT. <br />10082 EMERSON AVE ~ APPROVED BY, IV\\. GARDEN GROVE, CA 928 2726 STRAWBERY LN, UNIT 2 -TEL. (714) 829-5053 <br />TWO WORKtNG DAYS BEFORE YOU DIG <br />PUBLIC WORKS DIRECTOR TEL. (714) 548-1233 SANTA ANA, CA 92706 R.C.E. NO., EXP. DATE, EMAILLYJ0@GMAIL.COM R.C.E. NO., 633B1 EXP. DATE, 9/30/2026 <br />.... "' I,:, <br />!:::1 "' ~ :a,; <br />SHEET <br />1 <br />OF <br />2 <br />for 12/12/24 <br />Behrooz Sarlak 3/7/2025