Laserfiche WebLink
Final Structural Report <br />PROJECT NUMBER: AE230325 | PROJECT NAME: CPT HARBOR ANA <br />ACROS ENERGY | acrosenergy.com | 512.663.9058 | info@acrosenergy.com 9 / 23 <br /> <br />Ty_max = 1.94 in < L/240 = 58 / 240 x 12 in/ft = 2.9 in Therefore > OK <br /> <br /> <br />• Check Girders: <br />Joist Girder (Depth = 56”) <br />Span = 52 ft Spacing = 58 ft <br />DL = 12 psf x 58 ft x 8 ft = 5.57 kip <br />LL = 12 psf x 8 ft x 58 ft = 5.57 kip (Reduced) <br /> <br /> <br />Utilization = 1 , Therefore > OK <br /> <br />Ty_max = 1.22 in < L/240 = 52 / 240 x 12 in/ft = 2.6 in Therefore > OK <br />