Laserfiche WebLink
Final Structural Report <br />PROJECT NUMBER: AE230325 | PROJECT NAME: CPT HARBOR ANA <br />ACROS ENERGY | acrosenergy.com | 512.663.9058 | info@acrosenergy.com 11 / 23 <br />Joist Girder with Additional Electrical Equipment Loads <br />Additional Electrical Equipment (specs provided by the client): <br />Inverter (3 Synergy units + 1 Synergy manager) <br /> <br />(4) [inverters + racking] = 4 x (250+37) = 1148 lbs <br />Panel board (Per information below from the Client) = 450 lbs <br /> <br />Panel board racking = 150 lbs estimate ( should be conservative) <br />Total Load = 1748 lbs > Conservatively, used 2100 lbs in analysis split into 7 loads of 300 lbs at 7 <br />midspan joints spaced at 4 ft <br /> <br />Utilization = 1.04 < 1.05, Therefore > Acceptable