Laserfiche WebLink
Response Letter <br />ACROS ENERGY | acrosenergy.com | 512.663.9058 | info@acrosenergy.com <br /> Via email: loic.ipoua@powerflex.com <br />July 30, 2024 <br /> <br /> <br />Client: <br />Loic Ipoua <br />Project Engineer II <br />Powerflex – EDF Renewables <br />805 Third Avenue <br />New York, NY 10022 <br />Tel: (346) 526-3380 <br /> <br />Project: <br /> CPT Harbor Ana, <br /> <br />Project Address: <br /> 2721 S Harbor Blvd, Santa Ana, CA 92704 <br /> <br /> <br />Dear Loic, <br />We have reviewed the comments dated 07/10/25 regarding our report and have updated the final <br />version accordingly. <br />The revised report demonstrates that the subject building has adequate vertical load capacity to support <br />the additional load from the proposed PV system. As explained in Section 5, the existing lateral load- <br />resisting system is permitted to remain unaltered, since the added PV system weight does not exceed 10 <br />percent of the roof-level dead load. <br />Deflection and ponding calculations are provided in Appendix A, and the roof framing plan is included in <br />Appendix B. <br />Please let us know if you have any further questions.