Laserfiche WebLink
TELECOMMUNICATIONS PROJECT MANAGEMENT <br />16776 BERNARDO CENTER DRIVE, UNIT 203 <br />SAN DIEGO, CA 92128 <br />15 <br />5 <br />0 <br />5 <br /> <br />S <br />A <br />N <br />D <br /> <br />C <br />A <br />N <br />Y <br />O <br />N <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />, <br /> <br />B <br />L <br />D <br />G <br /> <br />C <br />. <br />IR <br />V <br />I <br />N <br />E <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />6 <br />1 <br />8 <br />SHEET TITLE: <br />ISSUE STATUS <br />DATEREV.DESCRIPTION BY <br />FI <br />S <br />H <br />E <br />R <br /> <br />F <br />L <br />O <br />R <br />A <br />L <br />26 <br />7 <br />7 <br /> <br />3 <br />/ <br />4 <br /> <br />N <br />. <br /> <br />M <br />A <br />I <br />N <br />, <br /> <br />U <br />N <br />I <br />T <br /> <br />W <br />C <br />C <br />0 <br />1 <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />0 02/28/2024 90% CD REVIEW jd <br />1 03/15/2024 90% CD DRM COMMENTS jd <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />03/29/2024 <br />05/17/2024 <br />06/21/2024 <br />08/01/2024 <br />09/25/2024 <br />05/07/2025 <br />06/04/2025 <br />90% CD DRM COMNTS #2 <br />100% FINAL CD <br />REVISED DIESEL TANK <br />REGULATORY HEIGHT <br />BP SUBMITTAL <br />100% CD BP PLANCHECK <br />STRUCT PLANCHECK <br />jd <br />jd <br />rl <br />jd <br />jd <br />jd <br />JD <br />A-0.5 <br />PROPRIETARY INFORMATION <br />THE INFORMATION CONTAINED IN THIS SET OF DRAWINGS <br />IS PROPRIETARY TO VERIZON WIRELESS <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />I <br />. <br />D <br />. <br /> <br />1 <br />5 <br />8 <br />6 <br />1 <br />0 <br />6 <br />7 <br />Ren. 4-30-27 <br />No. C 11978 <br />LICENSED A RCHITECT <br />STATE OF CALIFORNIA <br />WILLIAM M. BOOTH <br />GENERAL <br />SPECIFICATIONS <br />1.WORK INCLUDED: <br />THIS SPECIFICATION IS INTENDED TO BE GENERAL IN ITS SCOPE AS TO WHERE SEALANT IS TO BE <br />INSTALLED. THE CONTRACTOR SHALL CHECK ALL DRAWINGS AND DETAILS AND THOROUGHLY <br />FAMILIARIZE HIMSELF WITH THE EXTENT OF THE SEALANT INVOLVED. ONLY A COMPLETE AND <br />ABSOLUTELY WATERTIGHT JOB WILL BE ACCEPTED. <br />2.GUARANTEE: <br />A.PROVIDE GUARANTEE, IN FORM REQUIRED BY VERIZON WIRELESS, FOR PERIOD OF TWO (2) <br />YEARS. <br />B.DEFECTIVE WORK WILL BE JUDGED A FAILURE DUE TO LEAKAGE, HARDENING, CRACKING, <br />CRUMBLING, MELTING, SHRINKAGE OR RUNNING OF CAULKING COMPOUND OR SEALANT OR <br />STAINING OF ANY ADJACENT WORK. <br />3.SEALANT: <br />A.ONE PART, ELASTOMERIC-TYPE COMPOUND CONFORMING TO ESTI-S-00230C, TYPE II CLASS A. THE <br />COMPOUND SHALL BE SUPPLIED IN A READY TO USE FORM WHICH REQUIRES NO ON THE JOB <br />MIXING. USE FOR ALL EXTERIOR WORK EXCEPT AREAS SUBJECT TO FOOT TRAFFIC. <br />B.NON-TRACKING SEALANT FOR AREAS SUBJECT TO FOOT TRAFFIC (INTERIOR OR EXTERIOR): TWO <br />COMPONENT POLYURETHANE SEALANT, AS MANUFACTURED BY NAMECO INTERNATIONAL <br />(VULKEM 245); SONNEBORN AND SONS (SONOCLASTIC, PAVING JOINT SEALANT); W.R. GRACE CO. <br />(DARASEAL - U TRAFFIC GRADE); OR EQUAL. <br />SEALANT SPECIFICATIONSBATTERY SPECIFICATIONS <br />1.ALL BATTERIES SHALL BE PROVIDED WITH LOW POSITIVE PRESSURE SELF-SEALING, <br />FLAME ARRESTING SAFETY VENTS. <br />2.BATTERY SYSTEM SHALL BE PROVIDED WITH A LISTED DEVICE OR OTHER APPROVED <br />METHOD TO PRECLUDE, DETECT AND CONTROL THERMAL RUNAWAY. <br />3.THE BATTERY CABINET SHALL BE EQUIPPED WITH A BATTERY ELECTROLYTE <br />NEUTRALIZATION KIT CAPABLE OF NEUTRALIZING A SPILL FROM THE LARGEST BATTERY <br />(1.78 GALLONS). <br />4.A "CAUTION" SIGN SHALL BE ATTACHED TO THE DOOR OF THE BATTERY CABINET. <br />SEE NOTE 3 ON SHEET A-1 & DETAIL "22/D-2". <br />5.BATTERY RACK ANCHORS ARE DESIGNED TO RESIST SEISMIC LOADS IN ACCORDANCE <br />WITH THE CALIFORNIA BUILDING CODE. SEE DETAIL "35/D-3" <br />BATTERY SUMMARY: CALIFORNIA FIRE CODE BATTERY SPECIFICATION: <br />SAFT TELX-180 NICKEL CADMIUM BATTERIES <br />POST-INSTALLED CONCRETE AND MASONRY ANCHORS <br />APPROVED ANCHORS <br />CONCRETE EXPANSION ANCHORS: "HILTI" KWIK BOLT TZ2 (ICC ELC-4266) EXPIRES 12/2023. <br />MASONRY EXPANSION ANCHORS: "HILTI" KWIK BOLT TZ2 (ICC ESR-4561) EXPIRES 12/2023. <br />ADHESIVE ANCHORS IN CONCRETE: "HILTI" HIT-HY 200 V3 (ICC ELC-4868) EXPIRES 03/2024. <br />ADHESIVE ANCHORS & RODS IN CONCRETE: "SIMPSON" STRONG-TIE SET 3-G EPOXY THREADED ROD & REBAR ANCHORS (ICC ESR-4057) EXPIRES 04/2024. <br />ADHESIVE ANCHORS & RODS IN MASONRY: "HILTI" HIT-HY 270 (ICC ESR-4143) EXPIRES 01/2025. <br />POWDER DRIVEN ANCHORS FOR SHEET METAL: "HILTI" X-U 15 (ICC ESR-2269) EXPIRES 02/2025. <br />SCREW ANCHORS FOR MASONRY AND CONCRETE: "TAPCON" ANCHORS WITH ADVANCED THREADFORM TECHNOLOGY (ICC ESR 1671) EXPIRES 09/2024. <br />INSTALLATION NOTES <br />1.ALL CONCRETE ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH THE <br />APPROPRIATE ICC REPORT IN NORMAL WEIGHT OR LIGHTWEIGHT CONCRETE HAVING A <br />SPECIFIED STRENGTH OF 2500 PSI TO 8500 PSI. <br />2.ALL MASONRY ANCHORS SHALL BE INSTALLED IN SOLID GROUTED MASONRY UNITS <br />CONFORMING WITH ASTM C90 GRADE N, TYPE 1. <br />3.GROUT SHALL HAVE MINIMUM A TESTED STRENGTH OF 2,000 PSI IN ACCORDANCE WITH <br />ASTM C476 AND C1019. <br />4.MORTAR SHALL BE TYPE S, GRADE N, TYPE 1 WITH A MINIMUM TESTED STRENGTH OF <br />1,900 PSI IN ACCORDANCE WITH ASTM C270. <br />5.WHEN INSTALLING ANCHORS IN (E) NON-PRESTRESSED REINFORCED CONCRETE, USE <br />CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE (E) REINFORCING BARS. <br />MAINTAIN A MINIMUM CLEARANCE OF ONE-INCH BETWEEN THE REINFORCEMENT AND <br />THE DRILLED-IN ANCHOR AND/OR PIN. <br />6.WHEN INSTALLING ANCHORS IN PRE-STRESSED OR POST-TENSIONED CONCRETE, THE <br />CONTRACTOR SHALL X-RAY THE SURROUNDING AREA TO LOCATE AND MARK ALL <br />ADJACENT REINFORCING WITHIN 12" OF PROPOSED ANCHOR LOCATION. CONTRACTOR <br />SHALL USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE (E) REINFORCING <br />BARS. MAINTAIN A MINIMUM CLEARANCE OF THREE INCHES BETWEEN THE <br />REINFORCEMENT AND THE DRILLED-IN ANCHOR AND/OR PIN. <br />7.ANCHOR DIAMETER REFERS TO THE OUTSIDE DIAMETER OF THE ANCHOR. <br />8.ALL TESTS SHALL BE PERFORMED IN THE PRESENCE OF THE SPECIAL INSPECTOR. <br />9.FOR VERIFYING SATISFACTORY INSTALLATION WORKMANSHIP, PERFORM PROOF LOAD <br />TESTS FOR EXPANSION ANCHORS ACTING IN SHEAR AND/OR TENSION IN THE <br />PRESENCE OF THE SPECIAL INSPECTOR. SUBMIT REPORT OF TEST RESULTS TO <br />ENFORCEMENT AGENCY. IF ANY ANCHORS FAIL THE TENSION-TESTING REQUIREMENTS, <br />ADDITIONAL TESTING SHALL BE CONDUCTED UNTIL ACCEPTABLE TO THE ENFORCEMENT <br />AGENCY. <br />A. WHEN EXPANSION TYPE ANCHORS ARE USED FOR SILL PLATE BOLTING <br />APPLICATIONS, 10% OF THE ANCHORS SHALL BE TENSION TESTED. <br />B. WHEN EXPANSION TYPE ANCHORS ARE USED FOR OTHER STRUCTURAL <br />APPLICATIONS, ALL SUCH EXPANSION ANCHORS SHALL BE TENSION TESTED. <br />EXPANSION-TYPE ANCHORS SHALL NOT BE USED AS HOLD-DOWN BOLTS. <br />C. WHEN EXPANSION TYPE ANCHORS ARE USED FOR NON-STRUCTURAL APPLICATIONS, <br />SUCH AS EQUIPMENT ANCHORAGE, 50% OR ALTERNATE BOLTS IN A GROUP SHALL BE <br />TENSION TESTED. <br />D. PROOF LOAD TEST THE EXPANSION ANCHORS TO THE TORQUE PROOF LOAD <br />INDICATED BY THE MANUFACTURER FOR THAT PARTICULAR ANCHOR. IF ANY ANCHOR <br />FAILS, THEN TEST ALL ANCHORS NOT PREVIOUSLY TESTED UNTIL (20) CONSECUTIVE <br />PASS, THEN RESUME INITIAL TESTING FREQUENCY. <br />E. THE PROOF LOAD MAY BE APPLIED BY ANY METHOD THAT WILL EFFECTIVELY <br />MEASURE THE TENSION IN THE ANCHOR, SUCH AS DIRECT PULL WITH A HYDRAULIC <br />JACK, A TORQUE WRENCH CALIBRATED FOR USE WITH A SPECIFIC ANCHOR, <br />CALIBRATED SPRING-LOADED DEVICES, ETC. ANCHORS IN WHICH TORQUE IS USED <br />TO EXPAND THE ANCHOR WITHOUT APPLYING TENSION TO THE BOLT MAY NOT BE <br />VERIFIED WITH A TORQUE WRENCH. <br />10.APPLY PROOF TEST LOADS TO WEDGE ANCHORS WITHOUT REMOVING THE NUT IF <br />POSSIBLE. IF NOT, REMOVE NUT AND INSTALL A THREADED COUPLER TO THE SAME <br />TIGHTNESS AS THE ORIGINAL NUT USING A TORQUE WRENCH AND APPLY LOAD. <br />11.REACTION LOADS FROM TEST FIXTURES MAY BE APPLIED CLOSE TO THE ANCHOR BEING <br />TESTED, PROVIDED THE ANCHOR IS NOT RESTRAINED FROM WITHDRAWING BY THE <br />FIXTURE(S). <br />12.TEST EQUIPMENT (INCLUDING TORQUE WRENCHES) IS TO BE CALIBRATED BY AN <br />APPROVED TESTING LABORATORY IN ACCORDANCE WITH STANDARD RECOGNIZED <br />PROCEDURES. <br />13.THE FOLLOWING CRITERIA APPLY FOR THE ACCEPTANCE OF INSTALLED ANCHORS: <br />HYDRAULIC RAM METHOD: <br />THE ANCHOR SHOULD HAVE NO OBSERVABLE MOVEMENT AT THE APPLICABLE TEST <br />LOAD. FOR WEDGE AND SLEEVE TYPE ANCHORS, A PRACTICAL WAY TO DETERMINE <br />OBSERVABLE MOVEMENT IS THAT THE WASHER UNDER THE NUT BECOMES LOOSE. <br />TORQUE WRENCH METHOD: <br />THE APPLICABLE TEST TORQUE MUST BE REACHED WITHIN THE FOLLOWING LIMITS; <br />WEDGE OR SLEEVE TYPE: <br />ONE-HALF (1/2) TURN OF THE UNIT <br />ONE-QUARTER (1/4) TURN OF THE NUT FOR THE 3/8" SLEEVE ANCHOR ONLY <br />14.TESTING SHOULD OCCUR A MINIMUM OF 24 HOURS AFTER INSTALLATION OF THE <br />SUBJECT ANCHOR. <br />CALIFORNIA FIRE CODE - 2022 CFC CHAPTER 12, SECTION 1207 <br />ELECTRICAL ENERGY STORAGE SYSTEMS (ESS): <br />·NICKEL CADMIUM <br />·CONTAINERS ARE HEAT SEALED <br />·INDIVIDUAL BATTERY TOTAL: (30) MAXIMUM <br />·(1) BATTERY STRING = (5) INDIVIDUAL BATTERY CELLS <br />·TOTAL BATTERY STRINGS: (6) MAXIMUM (30) BATTERIES <br />·ONE STRING: 25.9" LONG X 20.7" WIDE X 10.0" HIGH <br />·48 VOLTS PER STRING <br />·172 AMP HOURS PER STRING <br />·365.0 LBS. PER STRING <br />·BATTERY RATING (EACH STRING): (48V x 172Ah) / 1000 - 8.26 KWH <br />·BATTERY RATING (TOTAL) 8.26 KWH x 6 BATTERY STRINGS = 49.54 KWH (TOTAL) <br />·BATTERY SYSTEM THRESHOLD: 49.54 KWH< 70 KWH PER CBC TABLE 1207.1.1 <br />·LOW POSITIVE PRESSURE SELF-SEALING SAFETY VENTS WITH FLAME ARRESTOR <br />·BATTERIES MEET OR EXCEED IEEE RECOMMENDED PRACTICES AND UL RECOGNITION <br />REQUIREMENTS <br />·THIS BATTERY INSTALLATION IS NOT SUBJECT TO THE REQUIREMENTS OF THE <br />CALIFORNIA FIRE CODE SECTION 1207 FOR ELECTRICAL ENERGY STORAGE SYSTEMS <br />BATTERY SUMMARY: <br />ORANGE COUNTY ENVIRONMENTAL HEALTH <br />·1.78 GALLONS OF ELECTROLYTE PER BATTERY CELL / 8.90 GALLONS PER STRING <br />·(6) STRINGS, (30) BATTERIES (MAXIMUM TOTAL) <br />·ELECTROLYTE VOLUME: (6) BATTERY STRINGS x 8.90 GALLONS = 53.4 GALLONS <br />·COUNTY HAZMAT THRESHOLD: 53.4 GALLONS < 55.00 GALLONS <br />·THIS BATTERY INSTALLATION DOES NOT REQUIRE A COUNTY OF ORANGE HAZARDOUS <br />MATERIALS BUSINESS PLAN <br />CHAINLINK LID SPECIFICATIONS <br />INSTALL FENCING PER ASTM F-567, SWING GATES PER ASTM F- 900 <br />1.ALL MATERIALS SHALL BE GALVANIZED <br />2.GATE POST, TERMINAL OR PULL POST: 4"Ø NOMINAL SCHEDULE 40 PIPE FOR GATE WIDTHS UP <br />THROUGH 6 FEET FOR SINGLE SWING GATE OR 12 FEET FOR DOUBLE SWING GATE PER ASTM-F1083 <br />3.LINE POST: 2"Ø NOMINAL SCHEDULE 40 PIPE PER ASTM-F1083 <br />4.CORNER POST: 3"Ø NOMINAL SCHEDULE 40 PIPE PER ASTM-F1083 <br />5.GATE FRAME: 1 1/2"Ø NOMINAL SCHEDULE 40 PIPE PER ASTM-F1083 <br />6.TOP RAIL & BRACE RAIL: 1 1/4"Ø NOMINAL SCHEDULE 40 PIPE PER ASTM-F1083 <br />7.FABRIC: 9 GA. CORE WIRE SIZE 2" MESH, CONFORMING TO ASTM-A392 CLASS 1 <br />8.TIE WIRE: MINIMUM 11 GA GALVANIZED STEEL INSTALL A SINGLE WRAP TIE WIRE AT POSTS AND <br />RAILS AT MAX. 24" INTERVALS. INSTALL HOG RINGS ON TENSION WIRE AT 24" INTERVALS <br />9.TENSION WIRE: 7 GA. GALVANIZED STEEL <br />10.BARBED WIRE (OPTIONAL): DOUBLE STRAND 12-1/2 GAUGE TWISTED WIRE, 4 PT. BARBS SPACED ON <br />APPROXIMATELY 5" CENTERS <br />11.GATE LATCH: 1-3/8" O.D. PLUNGER ROD W/ MUSHROOM TYPE CATCH AND LOCK (KEYED ALIKE FOR <br />ALL SITES OR COMBINATION AS SPECIFIED BY VERIZON WIRELESS) <br />12.LOCAL ORDINANCE FOR BARBED WIRE PERMIT SHALL GOVERN INSTALLATION <br />13.HEIGHT = 8' VERTICAL + 1' BARBED WIRE (OPTIONAL) VERTICAL DIMENSION <br />14.ALL WORK SHALL CONFORM WITH THE DESIGN AND CONSTRUCTION SPECIFICATIONS FOR FENCES <br />15.GATE HINGES SHALL BE MERCHANTS METAL MODEL 64386 HINGE ADAPTER WITH MODEL 6409, 180° <br />ATTACHMENT OR APPROVED EQUAL <br />16.THE GUIDE (LATCH ASSEMBLY) SHALL BE HEAVY INDUSTRIAL DOUBLE-GATE LATCH <br />17.LATCHES AND STOPS SHALL BE PROVIDED FOR ALL GATES <br />18.PLUNGER ROD COMPLETE WITH RECEPTOR TO BE PROVIDED AT THE INACTIVE LEAF OF ALL DOUBLE <br />GATE INSTALLATIONS <br />19.ALL STOPS SHALL HAVE KEEPERS CAPABLE OF HOLDING THE GATE LEAF IN THE OPEN POSITION <br />SCOPE OF WORK FOR BATTERY INSTALLATION: <br />1.THIS IS A NEW FACILITY. <br />2.THERE ARE NO EXISTING BATTERIES TO BE REMOVED OR RELOCATED. <br />3.MAXIMUM (30) NEW BATTERIES WILL BE INSTALLED. <br />4.SEE BATTERY SPECIFICATIONS SHEET D-10. <br />SAFT TELX-180 NICKEL CADMIUM BATTERIES