Laserfiche WebLink
Aerial View Vicinity Map <br />Project Data <br />A <br />A/C Air Conditioning <br />ADU Accessory Dwelling Unit <br />A.F.F.Aboce Floor Finish <br />ALT.Albernate <br />AMT.Amount <br />APPROX.Approximate <br />AVG.Average <br />B <br />BD.Board <br />BTWN.Between <br />BLDG. Building <br />BLW/BLKGBlock/Blocking <br />C <br />C.F.M.Cubic Feet Per Minute <br />CHG.Change <br />C.I.Cast Iron <br />CLR.Clear/Clearance <br />CLG.Ceiling <br />Centerline <br />C.M.U.Concrete Masonry Unit <br />COL.Column <br />CONC.Concrete <br />CONSTR Construction <br />C.O.T.G.Clean Out to Grade <br />CTR.Center <br />CU. FT.Cubic Foot <br />CU. IN.Cubit Inch <br />CU. YD Cubic Yard <br />D <br />DBL Double <br />DEG.Degree <br />DEPT.Department <br />DIAG.Diagonal <br />DIA Diameter <br />DIM.Dimension <br />DIV.Division <br />D.S.Downspout <br />D.W.Dumbwaiter/Downspout <br />E <br />(E)Existing <br />EA.Each <br />ELEC.Electric <br />ELEV.Elevation/Elevator <br />ENCL. Enclouse <br />EQ.Equial <br />EQUIP.Equipment <br />EXIST.Existing <br />EXT.Exterior <br />F <br />F.D. Floor Drain <br />F.G.Finish Grade <br />F.H.Fire Hydrant <br />FIN. Finish <br />FLR.Floor <br />FLUOR.Fluorescence <br />F.O.C.Face of Concrete <br />F.O.F.Face of Finish <br />F.O.M.Face of Masonry <br />F.O.S.Face of Stud <br />F.O.S. Finish Surface <br />FS Finish Surface <br />FT.Foot <br />FTG.Footing <br />F.F.L.Finish Floor Level <br />G <br />GA.Gauge <br />GAL.Gallon <br />GALV.Galvanized <br />GYP.Gypsum <br />H <br />H.B.Hose Bibb <br />HDR.Header <br />HDRW.Hardware <br />HORIZ.Horizontal <br />HP.Horsepower <br />HT.Height <br />I <br />I.D.Inside Diameter <br />IN.Inch <br />INFO.Information <br />INSUL.Insulation <br />INT.Interior <br />J <br />JAN.Janitor <br />JCT.Junction <br />JT.Joint <br />K <br />KIT.Kitchen <br />L <br />LAV.Lavatory <br />LB.Pound <br />LF.Lineal Foot <br />LIN.Linear <br />LT.Light <br />LT.WT.Light Weight <br />M <br />MAX.Maximun <br />M.B.Machine Bolt <br />M.C.Medicine Cabinet <br />MECH.Mechanical <br />MED.Medium <br />MEZZ.Mezzanine <br />MFR./MFGR.Manufacturer <br />MIN.Minimum <br />MISC.Miscellaneous <br />MTL Metal <br />N <br />(N)New <br />N.G.Natural Grade <br />N.I.C.Not In Contact <br />NTS Not to Scale <br />O <br />O/Board <br />O.C.On Center <br />O.D.Outside Diameter <br />OPNG.Opening <br />ORIG.Original <br />OZ Ounce <br />P <br />PERP.Perpendicular <br />PL.PLate <br />P.LAM.Plastic Laminata <br />PLY.WD.Plywood <br />PR.Pair <br />PROJ.Project <br />P.S.F.Pounds Per Square Foot <br />P.S.I.Pounds Per Square Inch <br />PVMT.Pavement <br />P.T.D.F.Pressure Treated Dog Flr <br />Q <br />QT.Quart <br />QTY.Quantity <br />R <br />R.Riser <br />RAD.Radius <br />RD.Road <br />REF.Refrigerator <br />REINF.Reinforcement <br />REQ.Required <br />RM.Room <br />R.O.Rough Opening <br />R.T.S.Refer to Structural <br />S <br />RCHED.Schedule <br />S.C.Solid Core <br />SECT.Section <br />SHWR.Shower <br />SHT.Sheet <br />SIM.Similar <br />SPEC(S)Specification(s) <br />SQ.FT.Square Feet <br />SQ.Square <br />S.S.Stainless Steel <br />ST.Street <br />STD.Standard <br />STL.Steel <br />STOR.Storage <br />STRUCT.Structure <br />SYM.Symbol <br />T <br />T.Tread <br />T.O.C.Top of Concrete/Curb <br />TO.C.B.Top of Catch Basin <br />TEL.Telephone <br />TEMO.Temperature <br />T&G Tongue and Groove <br />THK.Thick <br />TOIL.Toilet <br />T.O.P.Top of Pavement <br />T.O.S.Top of Slab <br />T.O.W.Top of Wall <br />TV Television <br />TYP.Typical <br />U <br />UNFIN.Unfinished <br />U.N.O.Unless Noted Otherwise <br />UR.Urinal <br />V <br />V.Vent <br />V.C.T.Vinyl Composition Tile <br />VENT.Ventilate, Ventilating <br />VERT.Vertical <br />V.T.R.Vent Thru Roof <br />W <br />W.C.Water Closet <br />WD Wood <br />W.H.Water Heater <br />W.I.Wrought Iron <br />W.R.B.Weather Resistant Barrier <br />WOM.Women <br />W.P.Waterproofing <br />WSCT.Wainscot <br />W/With <br />W/O Without <br />ACRONYMS <br />A.N.S.I.American National Standars <br />Institute <br />A.S.T.M.American Society for Testing <br />And Materials <br />C.B.U.California Building Code <br />I.C.B.O.International Conference of <br />Building Officials <br />N.F.P.A.National Fire Protection <br />Association <br />O.S.H.P.D.Occupational Safety and <br />Health Act <br />U.F.C.Uniform Fire Code <br />W.I.C.Woodwork Institute Of <br />California <br />ABBREVIATIONS GENERAL NOTES <br />Regulating Codes <br />2022 California Building Code Volumes 1 & 2 <br />2022 California Mechanical Code <br />2022 California Plumbing Code <br />2022 California Electrical Code <br />2022 California Existing Buildings Code <br />2022 California Fire Code <br />2022 California Energy Code <br />2022 International Property Management Code <br />2022 California Green Building Standards Code <br />Project Description: <br />Project Address: <br />Project Type:VB <br />Natural Gas: Yes <br />Appliances gas o electric: Gas <br />Exterior Wall Framing Type: 2X4 <br />Floor Type: <br />Roof Type: Attic <br />Roof Slope: 4:12 <br />Exterior Wall Siding Material: Stucco <br />Roofing Material:Asphalt Shingle <br />Ceiling Height:8' <br />Status HVAC System:New <br />HVAC Cooling and Heating: Yes <br />HVAC Ducted or Ductless: Ductless-Mini Split - ADU <br />Water Heater Status:New <br />Type of the Water Heater: Gas Tankless <br />Assessor's Parcel Number:40809434 <br />Tract:4022 <br />Lot: <br />Zone <br />Lot Size, Gross:6,072.00 SQFT <br />Occupancy Group:R-3 <br />Year Built:1962 <br />Construction Type:VB <br />Project Building Height:12'-11" <br />Deferred Submittals: <br />Existing Garage converted to ADU 443.88 SQ.FT & <br />Garage converted to LAUNDRY 66.65 SQ. FT. Patio <br />Demolition, A/C legalization. <br />2522 West Camden Place, Unit #2 Santa Ana CA 92704 <br /> Slab on grade - ADU <br />34 <br />2522 WEST CAMDEN PLACE, UNIT # 2 <br />SANTA ANA CA. 92704 <br />1.EXAMINATION OF SITE: The contractor shall thoroughly <br />examine the site and satisfy him/herself as to the conditions <br />under which the work is to be performed. The contractor <br />shall verify at the site all the measurements affecting the <br />work and shall be responsible for the correctness of the <br />same. No extra expense shall be allowed to the Contractor <br />for expenses due to his neglect to examine, or failure to <br />discover, conditions which affect the work. <br />2.GENERAL OPERATION: the Contractor shall, after <br />consulting with the Owner, Schedule the work so as not to <br />interfere unduly with the neighbors, etc. Contractor shall <br />allay dust by approved means and minimize noise as much <br />as practical. In no case shall the work interfere with existing <br />streets, drives, walks, passageways, neighbors's property, <br />improvements and the like. Protect all in-place construction <br />in connection with the work. Particular attention is directed <br />to but not limited to, such items as street improvements, <br />curbs and gutters, rough grading lines, etc. <br />3.CONTRACTOR USE OF THE PREMISES: <br />· Confine operations at the site to areas permitted by law, <br />ordinances, permits, and these Contract Documents. Do <br />not unreasonably encumber premises with materials or <br />equipment. <br />· Assume all responsibility for protection and safekeeping <br />of all products stored on the premises. Move any stored <br />products which interfere with the operations of the City or <br />other contractor. Obtain and pay for use of additional <br />storage or work area required for operations. <br />4.LIMITS OF WORK: Work zone limits are established on the <br />drawings. All Contractors, Subcontractors, and Tradesman <br />shall coordinate their work with one another within the <br />established limits. <br />5.SEQUENCE OF WORK: in the event any special <br />sequencing of the work is required by the Owner, the <br />Contractor shall arrange a conference before any such work <br />is begun. Contractor shall be responsible and liable for <br />deviations from schedule unless delays are the result of <br />failure of the Owner to abide by the Contractor by acts of <br />nature or God. <br />6.ORDERS: Place orders for material and equipment <br />immediately on receipt of contract and follow up vigorously <br />to insure adequate and timely supply of work. Perform all <br />tracing and expediting actions and arrange to get workers <br />and subcontractors on job at proper time and avoid delays. <br />7.MEASUREMENTS: Contractor shall verify all dimensions <br />shown on drawings by taking field measurements; proper fit, <br />and attachment of all parts is required. Before commencing <br />work, check all lines and levels indicated and such other <br />work as has been properly completed. Should there be any <br />discrepancies, immediately report in writing to the Architect <br />for correction or adjustment prior to the commencement of <br />any related work. In the event of the Contractor's failure to <br />do so, the Contractor should be fully and solely responsible <br />for the correction or adjustment of any such related work or <br />errors.All dimensions take precedence over scale All <br />dimensions are to face of step, unless otherwise noted, THE <br />CONTRACTOR SHALL NOT SCALE DRAWINGS. <br />8.RULES AND REGULATIONS: All work and materials shall <br />be in accordance with the latest rules and regulations of the <br />National Board of Underwriters, the latest editions of the <br />National Electrical Code, the National Plumbing Code, latest <br />adopted edition of the California Building Code, all State <br />Title 24 AB. 163 energy Regulations, and all applicable Local <br />and State Laws and Ordinances. Nothing on the drawings <br />shall be constructed to permit work not conforming to these <br />codes. <br />9.The Contractor shall coordinate with the Building <br />Department for all Building department required inspections. <br />10.The Contractor shall give all notices and/or comply with all <br />codes, laws, ordinances, rules regulations, and orders of <br />any pertinent public authority bearing on the performance of <br />work and shall notify the Architect if the drawings and <br />specifications are at variance therewith. <br />11.Solely as a convenience to the Owner and Contractor, the <br />Architect may include documents prepared by certain <br />consultants and/or vendors (or incorporate the <br />recommendations of said consultants and/or vendors into <br />documents prepared by the Architect) within the set <br />documents issued by the architect. It is expressly <br />understood that by such issuance, the Architect assumes no <br />liability for the services of said consultants and/or vendors. <br />12.CONSTRUCTION QUALITY: the Contractor shall complete <br />all work to a degree of skill, efficiency and knowledge which <br />is possessed by those of ordinary skill, competency and <br />standing in the particular trade or business for which the <br />Contractor employed in the community. The Construction <br />documents are provided to illustrate the design and general <br />type of construction, material and work commensurate with <br />this type of project throughout. <br />13.COMPLETE PROJECT: The Contract Documents, <br />including working drawings, specifications and schedules, <br />represent the finished structure. Unless otherwise noted, they <br />do not indicate method of construction. Contractor shall <br />supervise and direct work and shall be solely responsible for <br />all construction means, methods, techniques, sequences, and <br />procedures. Observation visits by the Architect shall not <br />include inspections of protective measure or the construction <br />procedures required for same, which are not specifically <br />detailed on drawings shall be similar to those shown, or <br />those detail existing in the field as they occur. WORK <br />WHICH IS OBVIOUSLY REQUIRED TO BE PERFORMED <br />TO PROVIDE A COMPLETE OPERABLE INSTALLATION <br />WITHIN THE SCOPE OF WORK, BUT IS NOT <br />SPECIFICALLY INCLUDED ON THE PLANS, SHALL BE <br />PERFORMED BY THE CONTRACTOR AT NO EXTRA <br />CHARGE. <br />14.COORDINATION: The General Contractor and each <br />Subcontractor shall be responsible for verification of all field <br />conditions and dimensions PRIOR to commencement of any <br />work. Contractor shall bring any discrepancies to the <br />Architect's and Owner's attention PRIOR to commencing <br />any work. In the event that work commenced with a failure <br />to notify both the Architect and Owner, the Subcontractor is <br />solely responsible for any and all corrective measures or <br />errors. <br />15.NOTES: All plans imply the words " the Contractor shall" or <br />"the Contractor shall install". <br />16.COOPERATION: <br />·Contractor and Subcontractors shall coordinate their <br />work with adjacent work and cooperate with other trades <br />so as to facilitate general progress of the work. Each trade <br />shall afford the other trades every reasonable opportunity <br />for installation of their work and storage of their materials. <br />· In as much as building completion within the time limit is <br />dependent upon cooperation of those engaged there in. It <br />is required that each contractor lay out / install his work in <br />a time and manner not to delay or interfere with carrying <br />forward other contractor's work. <br />17.CHANGES: Any proposed changes in the construction <br />should be made to the Architect IN WRITING OR IN <br />DRAWINGS. All changes should be reviewed by the <br />Architect, approved by the Owner, Contractor, Architect and <br />by the Building Official as required. <br />18.Any revision or additional work required by field conditions <br />or local governing authorities shall be brought to the <br />attention of the Architect before proceeding. <br />19.This set of Plans is to be on the Job Site at all times during <br />construction. All work shall be in accordance with the <br />approved plans. NO changes or revisions to the approved <br />plans or specifications shall be permitted unless submitted <br />to and approved by the Building Department. The issuance <br />of a permit shall nor prevent the Building Department from <br />requiring the correction of Errors or Omissions from the <br />approved plans and specifications. <br />20.the issuance or granting of a permit or approval of plans, <br />specifications and computations shall not be construed to be <br />a permit for or an approval of, any violations of any of the <br />codes or of any other ordinance of this jurisdiction. Permits <br />presuming to give permission to violate or cancel the <br />provisions of this code, or other ordinances of the <br />jurisdiction, shall nor be valid. <br />21.These notes apply to all drawings unless otherwise noted or <br />shown. Features of construction shown are typical and <br />shall <br />apply generally throughout similar conditions. Unless <br />otherwise noted, all closets, recesses, columns, projections <br />or other adjacent areas or work within the scheduled areas <br />shall have finishes as scheduled for the respective spaces in <br />which they occur. All omissions or conflicts between the <br />various elements of the working drawings and/or notes shall <br />be brought to the attention of the Architect prior to <br />proceeding with the work involved. <br />22.OWNERSHIP AND USE OF DOCUMENTS: All drawings, <br />specifications, and their content, and copies, there of <br />furnished by Karen Wilkins and shall remain the property of <br />Karen Wilkins. <br />23.Anyone supplying labor and/or materials to the project <br />shall carefully examine all subsurfaces to receive work. Any <br />conditions detrimental to the work shall be reported in writing <br />to the Contractor prior to beginning work. Commencement <br />of work should imply acceptance of all sub-surfaces. <br />24.The contractor shall be responsible for obtaining and <br />paying for all special permits and licenses indicated on the <br />plans and/or by specifications or required by the soils report <br />and/or required by any government agency. The Contractor <br />may need to obtain permits that may include but are not <br />limited to, penetration fire stop systems, fire-resistant joint <br />systems, automatic sprinkler systems, standpipe systems, <br />manual fire alarm systems, emergency and stand by power <br />systems,and door hardware schedules. <br />25.Site address is to be clearly marked in field in such a <br />position as to b plainly visible and legible from the street or <br />road fronting the property. <br />26.Work in public right-of-way requires an "Encroachment <br />Permit" from the Public Works Department. <br />27.All Contractors and Subcontractors must have on file with <br />the Building Department, a list of all such Contractors and <br />Subcontractors with the appropriate current City Business <br />License Numbers. <br />28.The permits shall expire by limitation if work authorized <br />under permit is not commenced within 180 days of the <br />issuance or if the work is suspended for a period exceeding <br />180 days after the work has commenced. <br />29.Upon completion of the project, new spaces shall be <br />cleaned and put in working order prior to occupancy. <br />**PV solar required under separate submittal, installation shall <br />be completed and approved prior CofO issuance. <br />**Fire suppression required under separate permit. <br />INDEX <br />G1.0 COVER SHEET <br />G2.0 GENERAL NOTES PART 1 <br />G2.1 GENERAL NOTES PART 2 <br />G3.0 MANDATORY MEASURES PART 1 <br />G3.1 MANDATORY MEASURES PART 2 <br />T24-1 TITLE -24 PART 1 GARAGE TO ADU <br />T24-2 TITLE -24 PART 2 GARAGE TO ADU <br />T24-3 TITLE -24 PART 1 MAIN HOUSE <br />T24-4 TITLE -24 PART 2 MAIN HOUSE <br />A1.0 EXISTING & PROPOSED SITE PLAN <br />A2.0 EXISTING & DEMOLITION FLOOR PLAN <br />A2.1 PROPOSED FLOOR PLAN <br />A3.0 PROPOSED EXTERIOR ELEVATIONS <br />A3.1 PROPOSED EXTERIOR ELEVATIONS <br />A4.0 EXISTING ROOF PLAN & SECTION <br />F1-0 FLASHING DETAILS <br />E1.0 SCHEMATIC ELECTRICAL PLAN <br />P1.0 PLUMBING & GAS PLAN <br />W1.0 WASTE PLAN <br />U1.0 UTILITIES PLAN <br />S1.1 FOUNDATION PLAN <br />S2.1 FRAMING PLAN <br />D-1 DETAILS <br />D-2 DETAILS <br />N1.0 STRUCTURAL NOTES <br />R-1 <br />2022 City of Santa Ana Municipal Code <br />NTS <br />DE <br />S <br />I <br />G <br />N <br />E <br />R <br />: <br />TH <br />E <br />S <br />E <br /> <br />D <br />R <br />A <br />W <br />I <br />N <br />G <br />S <br />, <br /> <br />D <br />E <br />S <br />I <br />G <br />N <br /> <br />A <br />N <br />D <br /> <br />S <br />P <br />E <br />C <br />I <br />F <br />I <br />C <br />A <br />T <br />I <br />O <br />N <br />S <br /> <br />A <br />R <br />E <br /> <br />T <br />H <br />E <br /> <br />P <br />R <br />O <br />P <br />E <br />R <br />T <br />Y <br /> <br />A <br />N <br />D <br /> <br />C <br />O <br />P <br />Y <br /> <br />R <br />I <br />G <br />H <br />T <br /> <br />O <br />F <br /> <br />Z <br />A <br />H <br />A <br /> <br />A <br />R <br />C <br />H <br /> <br />D <br />E <br />S <br />I <br />G <br />N <br /> <br />A <br />N <br />D <br /> <br />S <br />H <br />A <br />L <br />L <br /> <br />N <br />O <br />T <br /> <br />B <br />E <br /> <br />U <br />S <br />E <br />D <br /> <br />O <br />N <br /> <br />A <br />N <br />Y <br /> <br />O <br />T <br />H <br />E <br />R <br /> <br />W <br />O <br />R <br />K <br /> <br />E <br />X <br />C <br />E <br />P <br />T <br /> <br />B <br />Y <br /> <br />A <br />G <br />R <br />E <br />E <br />M <br />E <br />N <br />T <br /> <br />W <br />I <br />T <br />H <br /> <br /> <br />Z <br />A <br />H <br />A <br /> <br />A <br />R <br />C <br />H <br /> <br />D <br />E <br />S <br />I <br />G <br />N <br />. <br /> <br />W <br />R <br />I <br />T <br />T <br />E <br />N <br /> <br /> <br /> <br /> <br />D <br />I <br />M <br />E <br />N <br />S <br />I <br />O <br />N <br />S <br /> <br />S <br />H <br />A <br />L <br />L <br />TA <br />K <br />E <br /> <br />R <br />E <br />F <br />E <br />R <br />E <br />N <br />C <br />E <br /> <br />O <br />V <br />E <br />R <br /> <br />S <br />C <br />A <br />L <br />E <br />D <br /> <br />D <br />I <br />M <br />E <br />N <br />S <br />I <br />O <br />N <br />S <br /> <br />A <br />N <br />D <br /> <br />S <br />H <br />A <br />L <br />L <br /> <br />B <br />E <br /> <br />V <br />E <br />R <br />I <br />F <br />I <br />E <br />D <br /> <br />O <br />N <br /> <br />T <br />H <br />E <br /> <br />J <br />O <br />B <br /> <br />S <br />I <br />T <br />E <br />, <br /> <br />A <br />N <br />Y <br /> <br />D <br />I <br />S <br />C <br />R <br />E <br />P <br />A <br />N <br />C <br />Y <br /> <br />S <br />H <br />A <br />L <br />L <br /> <br />B <br />E <br /> <br />B <br />R <br />O <br />U <br />G <br />H <br />T <br /> <br />T <br />O <br /> <br />T <br />H <br />E <br /> <br />N <br />O <br />T <br />I <br />C <br />E <br /> <br />O <br />F <br /> <br />Z <br />A <br />H <br />A <br /> <br />A <br />R <br />C <br />H <br /> <br />D <br />E <br />S <br />I <br />G <br />N <br /> <br />P <br />R <br />I <br />O <br />R <br /> <br />T <br />O <br /> <br />T <br />H <br />E <br /> <br />C <br />O <br />M <br />M <br />E <br />N <br />C <br />E <br />M <br />E <br />N <br />T <br /> <br />O <br />F <br /> <br />A <br />N <br />Y <br /> <br />W <br />O <br />R <br />K <br />DRAWN <br />CHECKED <br />R.H <br />DATE <br />06-07-2024 <br />SCALE <br />JOB NO. <br />24-031 <br />SHEET <br />OF SHEETS <br />90 <br />9 <br />- <br />2 <br />4 <br />6 <br />- <br />1 <br />2 <br />0 <br />4 <br />25 <br />5 <br /> <br />N <br /> <br />D <br /> <br />S <br />T <br />. <br /> <br />S <br />U <br />I <br />T <br />E <br /> <br />4 <br />0 <br />1 <br /> <br />L <br />, <br />SA <br />N <br /> <br />B <br />E <br />R <br />N <br />A <br />R <br />D <br />I <br />N <br />O <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />4 <br />0 <br />1 <br />AR <br />C <br />H <br /> <br />D <br />E <br />S <br />I <br />G <br />N <br />ZA <br />H <br />A <br />A <br />R <br />C <br />H <br />D <br />E <br />S <br />I <br />G <br />N <br />1 <br />@ <br />G <br />M <br />A <br />I <br />L <br />. <br />C <br />O <br />M <br />25 <br />2 <br />2 <br /> <br />W <br />e <br />s <br />t <br /> <br />C <br />a <br />m <br />d <br />e <br />n <br /> <br />P <br />l <br />a <br />c <br />e <br />, <br /> <br />U <br />n <br />i <br />t <br /> <br /># <br /> <br />2 <br />Sa <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />GA <br />R <br />A <br />G <br />E <br /> <br />C <br />O <br />N <br />V <br />E <br />R <br />S <br />I <br />O <br />N <br /> <br />T <br />O <br /> <br />A <br />D <br />U <br />AD <br />D <br />R <br />E <br />S <br />S <br />OW <br />N <br />E <br />R <br />PR <br />O <br />J <br />E <br />C <br />T <br />MA <br />R <br />C <br />O <br /> <br />G <br />U <br />T <br />I <br />E <br />R <br />R <br />E <br />Z <br />C.M <br />ROOMS TOTAL PLAN AREA TOTAL LIVING AREA <br />LOT AREA = <br />LOT COVERAGE = <br />EXISTING HOUSE (1084)1,084.00 SQ.FT <br />510.53 SQ.FT <br />6,072.00 SQ.FT <br />(1,631.09 *100 / 6,072.00) = 26.86 % <br />SUBTOTAL EXISTING <br />FIRE SUPPRESSION REQUIRED UNDER <br />SEPARATE PERMIT <br />SPRINKLERS YES OR NO G1.0 <br />CO <br />V <br />E <br />R <br /> <br />S <br />H <br />E <br />E <br />T <br />1,084.00 SQ.FT <br />1,621.76 SQ.FT <br />519.86 SQ.FT <br />443.88 SQ.FT <br />EXISTING PORCH 27.89 SQ.FT <br />EXISTING GARAGE TO CONVERT TO ADU (443.88)443.88 SQ.FT <br />SITE INFORMATION <br />VALLEY <br />YES <br />REGION MONTAIN DESERT <br />NO <br />GEOLOGIC HAZARDOUS AREA <br />LIQUEFACTION <br />LANDSLIDING <br />AP ZONE <br />SNOW LOAD <br />PSF <br />FIRE SAFETY OVERLAY <br />BUILT PRIOR TO JULY 1ST, 2008. <br />FLOOD AREA <br />PSFFP <br />AR (AIRPORT AREA) <br />AR <br />PROJECT ADDRESS 2522 WEST CAMDEN PLACE <br />UNIT # 2 <br />PLAN CHECK NUMBER <br />101122324/101122325 <br />ADDRESS <br />OWNER <br />APPLICANT <br />ARCHITECT <br />ENGINEER <br />NAME <br />ZAHA ARCH DESIGN <br />- <br />255 N D ST. SUITE 401-L SAN BERNARDINO, CA 92401 <br />- <br />2522 W. CAMDEN PL SANTA ANA CA 92704 <br />PHONE NO. <br />909-246-1204 <br />- <br />- <br />WORK DESCRIPTION (E) Garage converted to ADU, and Laundry, Patio Demolition, and legalized existing A/C. <br />BLDG USE TYPE OF <br />CONSTRUCTION <br />OCCUPANCY FIRE <br />SPRINKLER <br />FIRE ZONE PROJECT <br />VALUATION <br />NUMBER OF <br />STORY <br />FLOOR <br />AREA <br />(SQ FT)N <br />SFD V-B R-3/U 1 ---- <br />PLAN CHECKER <br />- <br />PHONE NO. <br />- <br />FAX NO. <br />- <br />EMAIL <br />- <br />1ST CHECK DATE <br />- <br />2ND CHECK DATE <br />- <br />3RD CHECK DATE <br />- <br />Approval Date <br />- <br />EXISTING GARAGE TO CONVERT TO NEW LAUNDRY 66.65 SQ.FT 66.65 SQ.FT <br />MARCO GUTIERREZ <br />NEW PORCH 9.33 SQ.FT <br />EXISTING GARAGE TO CONVERT TO ADU (509.87)509.87 SQ.FT <br />1,084.00 SQ.FT <br />TOTAL AREA 1,594.53 SQ.FT1,631.09 SQ.FT <br />SUBTOTAL PROPOSED <br />NOTE: THE EXISTING HOUSE IS NOT EQUIPPED <br />WITH FIRE SPRINKLERS. <br />NOTE: THE PROYECT ADDRESS IS NOT LOCATED IN THE FEMA <br />DESIGNATED FLOOD ZONE (ZONE A OR E) <br />ZAHA ARCH DESIGN 255 N D ST. SUITE 401-L SAN BERNARDINO, CA 92401 909-246-1204 <br />2 <br />NOTE: The ADU sf/SFD sf ratio is for Park & Rec fee <br />purpose only. The applicant is responsible for the given <br />“SFR sf” of the existing primary residence; Building Safety <br />staff are not responsible for the accuracy of the given “SFR <br />sf” of the existing residence. <br />SQUARE FOOTAGE RATIO: <br />(ADU sf/ SFD sf) <br />(443.88/1084.00) = 0.41 SF <br />RATIO=0.41 SF <br />2 <br />Bldg #'s 101122324-25 <br />APPROVALS: <br />PLNG - C. Santana <br />BLDG - CSG <br />POLICE - B. Martin <br />PUBLIC WORKS - Y. Soto