Laserfiche WebLink
4 <br />710 DOOR FLASHING PAN INSTALLATION <br />GSM HEAD FLASHING CAP - INSTALL FLASHING SCREED AS REQUIRED BY DETAIL. EXTEND THE <br />SCREED 2" PAST THE ROUGH OPENING AT BOTH ENDS. SET SCREED ONTO HEAD PLASTER MOULD <br />WITH SEALANT. NOT REQUIRED IF THE DOOR IS PROTECTED BY A MINIMUM 30" DEEP EAVE OR <br />SOFFIT THAT IS WITHIN 24" OF THE DOOR HEAD, THE EAVE OR SOFFIT SHALL EXTEND 30" EACH <br />SIDE OF DOOR. <br />STEP <br />W.R.B. - APPLY W.R.B. IN WEATHERBOARD FASHION AROUND THE INSTALLED DOOR. <br />2 <br />STEP 6A <br />FLASHING CORROSION RESISTANT PAN - INSTALL ALONG BOTTOM OF OPENING, SET IN SEALANT <br />AND FASTEN THROUGH THE VERTICAL LEGS ONLY TO THE ROUGH FRAMING JAMBS. <br />WEEP S.A.F. - ADHERE 9" WIDE S.A.F. OVER CEMCO #3 FLASHING SCREED. EXTEND THE S.A.F. 2" <br />PAST THE CEMCO #3 FLASHING SCREED AT BOTH ENDS; S.A.F. REQUIRED WITH CEMCO #3. <br />1STEP <br />6B <br />STEP <br />STEP 7 <br />"L" METAL - INSTALL AT DECK TO WALL TRANSITION, PROVIDE SOLID BACKING AT VERTICAL LEGS <br />AND INSTALL WITH A MINIMUM 4" LAP BETWEEN PIECES. ALL JOINTS SOLDERED. <br />3STEP PLACE DOOR FRAME - PLACE THE DOOR FRAME IN THE ROUGH OPENING. PLUMB, SQUARE, AND <br />SHIM THE DOOR, THEN FASTEN THE DOOR FRAME TO THE JAMB STUDS. <br />STEP 4 JAMB S.A.F. - ATTACH A STRIP OF S.A.F. ALONG EACH SIDE OF JAMB, ADHERING TO THE ROUGH <br />FRAMING AND DOOR FRAME JAMB. ALIGN EDGE OF S.A.F. TO INSIDE OF DOOR FRAME JAMB . THE <br />S.A.F. SHALL OVERLAP THE "L" METAL AND PAN FLASHING AND EXTEND 12" ABOVE THE HEAD <br />ROUGH OPENING. PRIME SUBSTRATE AS REQUIRED BY S.A.F. MANUF. <br />STEP 5 HEAD S.A.F. - ADHERE S.A.F. ABOVE THE ROUGH OPENING. EXTEND THE S.A.F. 13" PAST THE ROUGH <br />OPENING AT EACH END. ALIGN THE BOTTOM EDGE OF THE S.A.F. WITH THE BOTTOM OF THE DOOR <br />FRAME HEAD. <br />STEP 5A PLASTER MOULD. - APPLY PLASTER MOULD TO DOOR FRAME ON CONTINUOUS SEALANT. PLASTER <br />MOULD SHALL ALIGN WITH INSIDE EDGE OF DOOR FRAME. PLASTER MOULD SHALL BE BACK PRIMED. <br />ROU <br />G <br />H <br /> <br />O <br />P <br />E <br />N <br />I <br />N <br />G <br /> <br />W <br />I <br />D <br />T <br />H <br />GSM HEAD FLASHING CAP - SET <br />FLASHING SCREED IN SEALANT TO <br />PLASTER MOULD HEAD. <br />STEP JAMB S.A.F <br />STEP <br />4 <br />2" <br />6A <br />6BSTEP WEEP S.A.F. - ADHERE O/ CEMCO #3 <br />FLASHING SCREED. <br />2" <br />ROUG <br />H <br /> <br />O <br />P <br />E <br />N <br />I <br />N <br />G <br /> <br />W <br />I <br />D <br />T <br />H <br /> <br />P <br />L <br />U <br />S <br /> <br />2 <br />6 <br />" <br />2" <br />STEP PLASTER MOULD - APPLY PLASTER <br />MOULD TO DOOR FRAME ON <br />CONTINUOUS SEALANT. <br />5A <br />SECTION AA <br />ROUG <br />H <br /> <br />O <br />P <br />E <br />N <br />I <br />N <br />G <br /> <br />W <br />I <br />D <br />T <br />H <br /> <br />P <br />L <br />U <br />S <br /> <br /> <br /> <br /> <br /> <br /> <br />8 <br />" <br />STEP PLACE DOOR FRAME3 <br />STEP HEAD S.A.F.5 <br />4" <br />4 <br />2 <br />- <br />- <br />A <br />B <br />- <br />11 <br />- <br />7" <br />2" <br />4" <br />LAP <br />TYP <br />4" <br />4" <br />LAP <br />TYP <br />VE <br />R <br />I <br />F <br />Y <br />STEP <br />STEP <br />STEP 5 <br />- <br />B <br />A <br />12 <br />" <br />ROUGH OPENING WIDTH PLUS 26" <br />HEAD S.A.F. <br />ADHERED <br />JAMB S.A.F. <br />FLASHING PAN <br />ATTACH FLASHING PAN <br />AT VERTICAL SIDES ONLY <br />ROUGH OPENING WIDTH <br />F.F. <br />11 <br />- <br />13" <br />STEP 3 <br />PLACE DOOR <br />FRANE <br />COOR <br />D <br />I <br />N <br />A <br />T <br />E <br />WITH <br />T <br />H <br />R <br />E <br />S <br />H <br />O <br />L <br />D <br />4" LA <br />P <br />4" <br />PAN FLASHING* - SOLDER ALL JOINTS. <br />WHEN "L" FLASHING HAS LESS THAN A 2" <br />VERTICAL RISE BETWEEN THE DECK AND <br />PAN, CONSTRUCT PAN AND "L" FLASHING <br />AS INTEGRAL ONE PIECE. COORDINATE <br />PAN DEPTH AND LIP HEIGHT WITH EACH <br />SPECIFIC THRESHOLD, FABRICATE PAN <br />TO MAXIMIZE DEPTH YET ELIMINATE <br />THRESHOLD ANCHOR PENETRATIONS <br />THROUGH THE PAN. <br />4" <br />4" <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br />/ <br />8 <br />" <br /> <br /> <br />M <br />I <br />N <br />LIP <br />4"ROU <br />G <br />H <br /> <br />O <br />P <br />E <br />N <br />I <br />N <br />G <br />2" <br />SECTION BB <br />VE <br />R <br />I <br />F <br />Y <br />1 <br />STEP <br />"L" FLASHING* <br />2 <br />STEP <br />* USE STAINLESS STEEL "L" AND PAN FLASHING AT CONCRETE SLAB OR DECK. COAT <br /> GSM "L" AND PAN FLASHING WITH PROTECTIVE MEMBRANE AT WOOD DECKS PER DETAIL <br />1DOOR AT STUCCO <br />SHEATHING MAY OCCUR <br />2x SOLID BACKING REQUIRED AT S.A.F. <br />WHEN SHEATHING NOT PROVIDED <br />DOOR AND FRAME <br />HEAD <br />JAMB <br />FOR ADDITIONAL INFORMATION SEE DETAILS <br />3-COAT STUCCO SYSTEM <br />O/ METAL LATH O/ W.R.B. <br />PERIMETER GASKET <br />JAMB S.A.F. EXTEND DOWN <br />O/ PAN FLASHING & L FLASHING <br />1 <br />- <br />PLASTER MOULD O/ SEALANT <br />O/ S.A.F. O/ DOOR FRAME JAMB <br />VERIFY FRAME <br />WIDTH WITH <br />WALL REQ'MT. <br />FRAMING PER STRUCTURAL <br />DOOR SHIM <br />LOW EXPANSION FOAM <br />APPLY WITHIN SHIM CAVITY <br />INTERIOR FINISH <br />SHEATHING MAY OCCUR <br />HEADER PER STRUCTURAL <br />3-COAT STUCCO SYSTEM <br />O/ METAL LATH O/ W.R.B. <br />W.R.B. O/ 9" WIDE WEEP S.A.F. <br />O/ HEAD FLASHING CAP <br />O/ DOOR HEAD S.A.F. <br />2x SOLID BACKING REQUIRED <br />AT S.A.F. WHEN SHEATHING <br />NOT PROVIDED <br />DOOR AND FRAME <br />GSM HEAD FLASHING CAP, WHEN <br />REQUIRED BY DETAIL 3 THIS SHEET <br />SET IN SEALANT OVER PLASTER <br />MOULD <br />PERIMETER GASKET <br />INTERIOR FINISH <br />FRAMING PER STRUCTURAL <br />BOND BREAKER <br />PLASTER MOULD O/ SEALANT <br />O/ S.A.F. O/ DOOR HEAD W/ BEAD OF <br />SEALANT AT HEAD AND MOULD <br />4 <br />WATERPROOF MEMBRANE OVER <br />AND UNDER THRESHOLD PAN <br />FLASHING <br />HARDSCAPE BELOW SCREED <br />CORROSION RESISTANT THRESHOLD <br />FLASHING PAN <br />ISOLATE DISSIMILAR METALS & <br />METAL TO CONCRETE. <br />LANDING SLOPE <br />1/4" = 1'-0" MAX <br />10 <br />- <br />7 <br />3 4" <br />MA <br />X <br />THRESHOLD INSTALL PER MANUF. <br />DOOR BOTTOM <br />"PEMKO" 34SD OR EQ. <br />DOOR THRESHOLD 6 <br />DOOR AT SIDING <br />SHEATHING MAY OCCUR <br />2x SOLID BACKING REQUIRED AT S.A.F. <br />WHEN SHEATHING NOT PROVIDED <br />DOOR AND FRAME <br />HEAD <br />JAMB <br />FOR ADDITIONAL INFORMATION SEE DETAILS <br />PERIMETER GASKET <br />JAMB S.A.F. EXTEND DOWN <br />O/ PAN FLASHING & L FLASHING <br />1 <br />- <br />VERIFY FRAME <br />WIDTH WITH <br />WALL REQ'MT. <br />FRAMING PER STRUCTURAL <br />DOOR SHIM <br />LOW EXPANSION FOAM <br />APPLY WITHIN SHIM CAVITY <br />INTERIOR FINISH <br />SHEATHING MAY OCCUR <br />HEADER PER STRUCTURAL <br />W.R.B. O/ 9" WIDE WEEP S.A.F. <br />O/ HEAD FLASHING CAP <br />O/ DOOR HEAD S.A.F. <br />2x SOLID BACKING REQUIRED <br />AT S.A.F. WHEN SHEATHING <br />NOT PROVIDED <br />DOOR AND FRAME <br />GSM HEAD FLASHING CAP, WHEN <br />REQUIRED BY DETAIL 3 THIS SHEET <br />SET IN SEALANT OVER PLASTER <br />MOULD <br />PERIMETER GASKET <br />INTERIOR FINISH <br />FRAMING PER STRUCTURAL <br />BOND BREAKER <br />PLASTER MOULD O/ SEALANT <br />O/ S.A.F. O/ DOOR HEAD W/ BEAD OF <br />SEALANT AT HEAD AND MOULD <br />LAP SIDING O/ W.R.B. O/ S.A.F. <br />INSTALL PER MFR. <br />LAP SIDING O/ W.R.B. O/ S.A.F. <br />INSTALL PER MFR. <br />SL. GL. DR. <br />HEAD <br />JAMB <br />FOR ADDITIONAL INFORMATION SEE DETAILS 1 <br />- <br />S.A.F. O/ WINDOW FLANGE SEE <br />S.A.F. O/ HEAD FLASHING CAP <br />W.R.B. <br />GALVANIZED SHEET METAL <br />FLASHING CAP W/ SOLDERED <br />CLOSED ENDS W/ BOND BREAKER. <br />FACTORY FINISHED SLIDING GLASS <br />DOOR <br />SHEATHING MAY OCCUR <br />SOLID BACKING REQUIRED WHEN <br />SHEATHING NOT PROVIDED <br />4 <br />A-D3.0 <br />HEADER PER STRUCTURAL <br />INTERIOR FINISH <br />FRAMING PER STRUCTURAL <br />LAP SIDING O/ W.R.B. O/ S.A.F. <br />INSTALL PER MFR. <br />JAMB S.A.F. <br />INTERIOR FINISH <br />FRAMING PER STRUCTURAL <br />SLIDING GLASS DOOR <br />JAMB S.A.F. EXTEND DOWN <br />O/ PAN FLASHING & L FLASHING <br />LAP SIDING O/ W.R.B. O/ S.A.F. <br />INSTALL PER MFR. <br />7 <br />3 <br />/ <br />4 <br />" <br /> <br />M <br />A <br />X <br />SL. GL. DR. THRESHOLD <br />SLIDING GLASS DOOR THRESHOLD <br />WATERPROOF MEMBRANE OVER AND <br />UNDER THRESHOLD PAN FLASHING <br />HARDSCAPE BELOW <br />SCREED LANDING SLOPE <br />THRESHOLD PAN FLASHING <br />SEE STEP 2 DETAIL 2 <br />FACTORY FINISHED SLIDING GLASS <br />DOOR <br />CORROSION RESISTANT THRESHOLD <br />FLASHING PAN <br />ISOLATE DISSIMILAR METALS & <br />METAL TO CONCRETE. <br />2 <br />- <br />9SL. GL. DR. THRESHOLD AT DECK <br />4" <br />WATERPROOF DECK COATING W/ <br />ELASTOMERIC BASE, INSTALL PER <br />MFGR. INSTRUCTIONS <br />LANDING SLOPE <br />1/4" = 1'-0" MAX <br />S.A.F EXTEND <br />O/ W.R.B. BELOW <br />PLYWOOD SHEATHING SEE <br />STRUCTURAL DRAWINGS <br />PRE-TREAMENT O/BASE COAT <br />O/ 'L' FLASHING <br />CORROSION <br />RESISTANT 'L' <br />FLASHING <br />4" <br />APPLY JOINT SEALANT <br />SLIDING GLASS DOOR THRESHOLD <br />WATERPROOF MEMBRANE OVER AND <br />UNDER THRESHOLD PAN FLASHING <br />THRESHOLD PAN FLASHING <br />SEE STEP 2 <br />FACTORY FINISHED SLIDING GLASS <br />DOOR <br />CORROSION RESISTANT THRESHOLD <br />FLASHING PAN <br />2 <br />- <br />12 <br />DETAILS <br />No.Date Description <br />AD-03 <br />Client <br />Project No:24-0501 <br />PHONE NO. <br />NAOMI GRANGE <br />2411 POINSETTIA ST. <br />SANTA ANA, CA 92706 <br />714-931-6089 <br />JWAIM DESIGN <br />714-494-6810 <br />jwaimdesign@gmail.com <br />CCOPYRIGHT <br />It is the clients responsibility prior to or during construction to notify the architect in writing <br />of any perceived errors or omissions in the plans and specifications of which a contractor <br />thoroughly knowledgeable with the building codes and methods of construction should <br />reasonably be aware. Written instructions addressing such perceived errors or omissions <br />shall be received from the architect prior to the client or clients subcontractors proceeding <br />with the work. The client will be responsible for any defects in construction if these <br />procedures are not followed. <br />DE <br />T <br />A <br />C <br />H <br />E <br />D <br /> <br />A <br />D <br />U <br />24 <br />1 <br />3 <br /> <br />N <br />. <br /> <br />P <br />O <br />I <br />N <br />S <br />E <br />T <br />T <br />I <br />A <br /> <br />S <br />T <br />. <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />6 <br />No.Date Description