Laserfiche WebLink
Geotechnical Investigation Report 03/11/2025 <br />2234 S Lowell St., Santa Ana, CA 92707 Page | 12 <br /> <br />LIMITATIONS <br /> <br />This report presents recommendations pertaining to the subject site based on the assumption <br />that the subsurface conditions do not deviate appreciably from those disclosed by our <br />exploratory excavations. Our recommendations are based on the technical information gathered, <br />our understanding of the proposed construction, and our experience in the geotechnical field. <br />We do not provide a guarantee or warranty (either expressed or implied) of the performance of <br />the project, only that our engineering work and judgments meet the standard of care of our <br />profession at this time. <br /> <br />In view of the general conditions in the area, the possibility of different local soil conditions cannot <br />be discounted. Any deviations or unexpected conditions observed during construction should be <br />brought to the attention of the Geotechnical Engineer. In this way, any required supplemental <br />recommendations can be made with a minimum of delay to the project. <br /> <br />If the proposed construction will differ from our present understanding of the project, the existing <br />information and possibly new factors may have to be evaluated. Any design changes and the <br />final grading and foundation plans should be reviewed by the Geotechnical Consultant. Of <br />particular importance would be extending development to new areas, changes in structural <br />loading conditions, postponed development for more than one year, or changes in ownership. <br /> <br />This report is issued with the understanding that it is the responsibility of the owner or owner’s <br />representative to ensure that the information and recommendations contained herein are called <br />to the attention of the Architects and Engineers for the project and incorporated into the plans <br />and that the necessary steps are taken to ensure that the Contractors and Subcontractors carry <br />out such recommendations in the field. This report is also subject to review by the controlling <br />authorities for this project. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />