My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2218 & 2220 N Richmond St - Plan
PBA
>
Building
>
ProjectDox
>
R
>
Richmond St
>
2218 N Richmond St
>
2218 & 2220 N Richmond St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:13 AM
Creation date
2/13/2026 5:00:58 AM
Metadata
Fields
Template:
Plan
Permit Number
101123779
101123780
Full Address
2218 N Richmond St
2220 N Richmond St
Street Number
2220
Street Direction
N
Street Name
Richmond
Street Suffix
St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />Planning and Building Agency <br />construction phase of the project. This is to verify the compliance w <br />specifications and/or recommendations, and to allow design changes in <br />subsurface conditions differ from those anticipated. <br />Geotechnical observation/testing can be performed at the following stages: <br />Approved <br />W%V4g,MIT ISSUANCE <br />event that <br />Master ID: <br />Date: <br />■ During ANY grading operations, including excavation, removal, filling and <br />backfilling, etc. <br />■ During and after excavation for footings to verify the adequacy of underlying <br />materials. <br />■ After pre -saturation of slab subgrade earth materials, if any, prior to pouring <br />concrete. <br />■ After compaction of subgrade soils and/or aggregate base for exterior slabs and or <br />driveway, if any. <br />■ During backfill of drainage and utility line trenches, if any, to verify proper <br />compaction. <br />■ When/If any unusual geotechnical conditions are encountered. <br />Note: If Geotechnical International is not provided the opportunity to perform the <br />geotechnical observation/testing during the construction phase, Geotechnical <br />International will take no responsibility for the conclusions and recommendations <br />contained in our report in the event that subsurface conditions differ from those <br />interpreted and anticipated during our preliminary investigation phase prior to the start of <br />construction. <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.