Laserfiche WebLink
P7 <br />structural <br />ENGINEERS <br />July 29, 2024 <br />Sollega, Inc <br />128 De Montfort Avenue <br />San Francisco, CA, 94112 <br />TEL: (415) 648-1299 <br />FAX: <br />Attn.: Lee Rothschild <br />Re: Job # 2024-03783: Muir Chase Plumbing Santa Ana <br />CITY OF SANTA ANA <br />Planning and Building Agency <br />may, lS. <br />Approved <br />FOR PERMIT ISSUANCE <br />Master ID: <br />Date: <br />The following calculations are for the Structural Engineering Design of the Photovoltaic Panels located at 2129 <br />South Wright Street, Santa Ana, CA 92705. <br />If you have any questions on the above, please feel free to call. <br />Prepared By: <br />PZSE, Inc. - Structural Engineers <br />Roseville, CA <br />/QR /A�ENNETI{ Iq`� <br />m <br />w m <br />No.S3878 <br />\ * \ / V EXP.3-31-25 <br />T �OF CAO <br />1478 Stone Point Drive, Suite 190, Roseville, CA 95661 <br />916.961.3960 916.961.3965 W www.pzse.com Page 1 of 20 <br />Experience I Integrity I Empowerment <br />