Docusign Envelope ID: 244D77F2-FOA2-4894-B44B-1CO03F256B68 <br />GENERAL REQUIREMENTS <br />SITE CLEARING/EROSION CONTROL <br />AND STATE REQUIREMENTS. <br />PART 1: GENERAL <br />PART 1: GENERAL <br />1.1 SUMMARY: <br />END OF SECTION <br />1.1 INTENT: <br />A. PROVIDE SITE —CLEARING AS REQUIRED TO COMPLETE WORK AS SHOWN ON <br />A. THESE SPECIFICATIONS AND CONSTRUCTION DRAWINGS DESCRIBE THE WORK TO BE <br />CONTRACT DOCUMENTS INCLUDING CLEARING, GRUBBING, STRIPPING, EROSION AND <br />DONE AND THE MATERIALS TO BE FURNISHED FOR CONSTRUCTION. PLANS ARE <br />SILTATION CONTROL, AND PROTECTION OF LANDSCAPE MATERIALS DESIGNATED TO <br />NOT TO BE SCALED. <br />BE PROTECTED DURING CONSTRUCTION. <br />B. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE FULLY EXPLANATORY <br />AND SUPPLEMENTARY, HOWEVER, SHOULD ANYTHING BE SHOWN, INDICATED OR <br />1 2 QUALITY ASSURANCE: <br />SPECIFIED ON ONE AND NOT THE OTHER, IT SHALL BE DONE THE SAME AS IF <br />A. COMPLY WITH GOVERNING CODES AND REGULATIONS. <br />SHOWN, INDICATED OR SPECIFIED IN BOTH. <br />C. THE INTENTION OF DOCUMENTS IS TO INCLUDE ALL LABOR AND MATERIALS <br />B. SITE PROTECTION: PROVIDE ALL NECESSARY JOB SITE MAINTENANCE FROM <br />REASONABLY NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF THE <br />COMMENCEMENT OF WORK UNTIL COMPLETION OF THE SUBCONTRACT <br />WORK AS STIPULATED IN THE CONTRACT. <br />D. CONFLICTS: THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL <br />C. AVOID DAMAGE TO THE SITE AND TO EXISTING FACILITIES, STRUCTURES, TREES, <br />MEASUREMENTS AT THE SITE BEFORE ORDERING MATERIALS OR DOING ANY WORK. <br />AND SHRUBS DESIGNATED TO REMAIN. TAKE PROTECTIVE MEASURES TO PREVENT <br />NO COMPENSATION SHALL BE ALLOWED DUE TO DIFFERENCES BETWEEN ACTUAL <br />EXISTING FACILITIES THAT ARE NOT DESIGNATED FOR REMOVAL FROM BEING <br />DIMENSIONS AND THOSE ON THE DOCUMENTS. ANY DISCREPANCY SHALL BE <br />DAMAGED BY THE WORK. <br />REPORTED TO THE OWNER OR THEIR AGENT FOR CONSIDERATION. <br />D. ANY AND ALL WASTE MATERIALS (E.G., CONCRETE WASTE) AND SOIL ARE <br />1.2 LICENSING REQUIREMENTS: <br />PROHIBITED FROM BEING DISCHARGED OFF OF THE WORK SITE AND/OR ENTERING <br />A. THE CONTRACTOR IS RESPONSIBLE FOR PROCUREMENT AND MAINTAINING ALL <br />STORM DRAINS. <br />APPLICABLE LICENSES AND BONDS. <br />PART 2: PRODUCTS <br />1.3 STORAGE: <br />A. ALL MATERIALS MUST BE STORED IN A LEVEL AND DRY FASHION THAT DOES NOT <br />2.1 MATERIALS: <br />A. TREE PROTECTION, EROSION CONTROL, SILTATION CONTROL, AND DUST CONTROL <br />MATERIALS SUITABLE FOR SITE CONDITIONS. <br />OBSTRUCT THE FLOW OF OTHER WORK. ANY STORAGE METHOD MUST MEET ALL <br />RECOMMENDATIONS OF THE ASSOCIATED MANUFACTURER. <br />1.4 CLEAN UP: <br />PART 3: EXECUTION <br />A. THE CONTRACTOR SHALL KEEP THE SITE FREE FROM ACCUMULATION OF WASTE <br />3.1 SITE CLEARING OPERATIONS: <br />A. PROTECTION OF EXISTING TREES, VEGETATION, LANDSCAPING, AND SITE <br />MATERIALS OR RUBBISH AT ALL TIMES. <br />IMPROVEMENTS NOT SCHEDULED FOR CLEARING WHICH MIGHT BE DAMAGED BY <br />1.5 QUALITY ASSURANCE: <br />CONSTRUCTION ACTIVITIES. <br />B. TRIMMING OF EXISTING TREES AND VEGETATION AS RECOMMENDED BY ARBORIST <br />A. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND <br />FOR PROTECTION DURING CONSTRUCTION ACTIVITIES. <br />FEDERAL REGULATIONS. <br />C. CLEARING AND GRUBBING OF STUMPS AND VEGETATION, AND REMOVAL AND <br />PART 2: PRODUCTS — NOT APPLICABLE TO THIS SECTION <br />DISPOSAL OF DEBRIS, RUBBISH, DESIGNATED TREES, AND SITE IMPROVEMENTS. <br />PART 3: EXECUTION — NOT APPLICABLE TO THIS SECTION <br />D. TOPSOIL STRIPPING AND STOCKPILING. <br />END OF SECTION <br />E. TEMPORARY EROSION CONTROL, SILTATION CONTROL, AND DUST CONTROL. <br />F. TEMPORARY PROTECTION OF ADJACENT PROPERTY, STRUCTURES, BENCHMARKS, <br />AND MONUMENTS. <br />G. WATERING OF TREES AND VEGETATION DURING CONSTRUCTION ACTIVITIES. <br />H. REMOVAL AND LEGAL DISPOSAL OF CLEARED MATERIALS. <br />I. MAINTAIN ALL EXISTING FENCING AND GATES TO MAINTAIN A SECURE SITE AT ALL <br />TIMES. <br />J. PROVIDE AND MAINTAIN ALL TEMPORARY FENCING, BARRICADES, WARNING SIGNALS <br />AND SIMILAR DEVICES NECESSARY TO PROTECT LIFE AND PROPERTY DURING THE <br />ENTIRE PERIOD OF CONSTRUCTION. REMOVE ALL SUCH DEVICES UPON COMPLETION <br />OF THE WORK. <br />3.2 CLEARING: <br />A. PREVENT DAMAGE TO EXISTING IMPROVEMENTS INDICATED TO REMAIN, INCLUDING <br />ON AND OFF SITE. PROTECT EXISTING TREES AND VEGETATION INDICATED TO <br />REMAIN. DO NOT STOCKPILE MATERIALS AND RESTRICT TRAFFIC WITHIN DRIP LINE <br />OF EXISTING TREES TO REMAIN OR THAT INTERFERE WITH ACCESS TO SITE. <br />PROVIDE AND MAINTAIN TEMPORARY GUARDS TO ENCIRCLE TREES OR GROUPS OF <br />TREES TO REMAIN; OBTAIN APPROVAL BEFORE BEGINNING WORK. <br />B. WATER VEGETATION AS REQUIRED TO MAINTAIN HEALTH. COVER TEMPORARILY <br />EXPOSED ROOTS WITH WET BURLAP AND BACKFILL AS SOON AS POSSIBLE. COAT <br />CUT PLANT SURFACES WITH APPROVED EMULSIFIED ASPHALT PLANT COATING. <br />C. REPAIR OR REPLACE VEGETATION DESIGNATED FOR REUSE, WHICH HAS BEEN <br />DAMAGED. REMOVE HEAVY GROWTHS OF GRASS BEFORE STRIPPING. STOCKPILE <br />SATISFACTORY TOPSOIL CONTAINING NO LARGE STONES, FOREIGN MATTER AND <br />WEEDS ON SITE FOR REUSE. <br />D. COMPLETELY REMOVE ALL IMPROVEMENTS, STUMPS AND DEBRIS EXCEPT FOR <br />THOSE INDICATED TO REMAIN. REMOVE BELOW GRADE IMPROVEMENTS AT LEAST 12" <br />BELOW FINISH GRADE SO AS NOT TO INTERFERE WITH NEW CONSTRUCTION. <br />REMOVE ABANDONED MECHANICAL AND ELECTRICAL WORK AS REQUIRED. <br />E. PREVENT EROSION AND SILTATION OF STREETS, CATCH BASINS AND PIPING. <br />CONTROL WINDBLOWN DUST. REMOVE WASTE MATERIALS AND UNSUITABLE SOIL <br />FROM SITE AND DISPOSE OF IN A LEGAL MANNER. ALL MATERIAL SHALL BE <br />CONTAINED BY APPROPRIATE CONTROLS. <br />F. EXCEPT WHERE EXCAVATION TO GREATER DEPTH IS INDICATED, FILL DEPRESSIONS <br />RESULTING FROM CLEARING, GRUBBING AND DEMOLITION WORK COMPLETELY WITH <br />SUITABLE FILL AND COMPACT AS REQUIRED. <br />3.3 EROSION CONTROL: <br />A. PROVIDE EROSION AND SILTATION CONTROL AS REQUIRED TO MEET ALL LOCAL <br />I HIS <br />r: <br />Planning and Building Ager <br />Q� ESSIO <br />NC <br />terOO999 <br />FOr <br />ENGINEERING LICENSE: <br />STATE OF CALIFORNIA <br />ENGINEER: PE#: DISCIPLINE: <br />SDK SHELTON D KEISLING 24647 ELECTRICAL E <br />DJW DAVID J WALDRON 25608 ELECTRICAL E <br />THE TERRANCE M. SUPER 17150 ELECTR CAL E <br />Leadarbo!3r <br />PLANS PREPARED FOR: <br />AGI l <br />PLANS PREPARED BY: <br />�SSC <br />DRAWING NOTICE: <br />THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE <br />PROPERTY OF SSC, IN AND IS LENT TO THE BORROWER FOR <br />THEIR CONFIDENTIAL USE ONLY, AND IN CONSIDERATION OF <br />THE LOAN OF THIS DRAWING, THE BORROWER PROMISES AND <br />AGREES TO RETURN IT UPON REQUEST AND AGREES THAT IT <br />WILL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE <br />DISPOSED OF DIRECTLY OR INDIRECTLY, NOR USED FOR ANY <br />PURPOSE OTHER THAN FOR WHICH IT IS FURNISHED. <br />SUBMITTALS: <br />DESCRIPTION <br />DATE <br />BY <br />REV <br />ISSUED FOR REVIEW <br />11/22/24 <br />ART <br />0 <br />REVISED PER CLIENT COMMENTS <br />12/13/24 <br />ART <br />1 <br />REVISED PER CLIENT COMMENTS <br />01/28/25 <br />DWO <br />2 <br />REVISED PER CLIENT COMMENTS <br />09/05/25 <br />TJM <br />3 <br />REVISED PER AHJ COMMENTS <br />11/07/25 <br />EDA <br />4 <br />APPLICANT SITE NAME: <br />CLEAN HARBORS (SANTA ANA) <br />APPLICANT SITE NUMBER: <br />AGI-EV-0006 <br />SITE ADDRESS. <br />2120 S YALE STREET <br />SANTA ANA, CA 92704 <br />SHEET DESCRIPTION: <br />SHEET#: <br />SPECIFICATIONS <br />(I OF 5) <br />