<br />PART 3: EXECUTION
<br />2. SPLICES SHALL BE MADE ONLY AT OUTLETS, JUNCTION BOXES, OR
<br />C. TEST PROCEDURES:
<br />ACCESSIBLE RACEWAYS WITH PRESSURE -TYPE CONNECTORS.
<br />3.1 GENERAL:
<br />1. ALL FEEDERS SHALL HAVE THEIR INSULATION TESTED AFTER INSTALLATION, BUT
<br />3. PULLING LUBRICANTS SHALL BE SOAPSTONE POWDER, POWDERED TALC, OR A
<br />BEFORE CONNECTION TO DEVICES. THE CONDUCTORS SHALL TEST FREE FROM
<br />A. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH
<br />COMMERCIAL PULLING COMPOUND. NO SOAP SUDS, SOAP FLAKES, OIL, OR
<br />SHORT CIRCUITS AND GROUNDS. TESTING SHALL BE FOR ONE MINUTE USING
<br />THE MANUFACTURER'S RECOMMENDATIONS.
<br />GREASE SHALL BE USED, AS THESE MAY BE HARMFUL TO CABLE INSULATION.
<br />1000V DC. INVESTIGATE ANY VALUES LESS THAN 50 MEGAOHMS.
<br />CONTRACTOR SHALL USE NYLON OR HEMP ROPE FOR PULLING CABLE TO
<br />B. EQUIPMENT SHALL BE TIGHTLY COVERED AND PROTECTED AGAINST DIRT OR WATER,
<br />AVOID SCORING THE CONDUIT.
<br />2. PRIOR TO ENERGIZING CIRCUITRY, TEST WIRING DEVICES FOR ELECTRICAL
<br />AND AGAINST CHEMICAL OR MECHANICAL INJURY DURING INSTALLATION AND
<br />CONTINUITY AND PROPER POLARITY CONNECTIONS,
<br />CONSTRUCTION PERIODS.
<br />4. CABLES SHALL BE NEATLY TRAINED, WITHOUT INTERLACING, AND BE OF
<br />SUFFICIENT LENGTH IN ALL BOXES, EQUIPMENT, ETC. TO PERMIT MAKING A
<br />3. MEASURE AND RECORD VOLTAGES BETWEEN PHASES AND BETWEEN PHASE
<br />3.2 LABOR AND WORKMANSHIP:
<br />NEAT ARRANGEMENT. CABLES SHALL BE SECURED IN A MANNER TO AVOID
<br />WIRES AND NEUTRALS. SUBMIT A REPORT OF MAXIMUM AND MINIMUM
<br />TENSION ON CONDUCTORS OR TERMINALS, AND SHALL BE PROTECTED FROM
<br />VOLTAGES.
<br />A. ALL LABOR FOR THE INSTALLATION OF MATERIALS AND EQUIPMENT FURNISHED FOR
<br />MECHANICAL INJURY AND FROM MOISTURE. SHARP BENDS OVER CONDUIT
<br />THE ELECTRICAL SYSTEM SHALL BE DONE BY EXPERIENCED MECHANICS OF THE
<br />BUSHINGS ARE PROHIBITED. DAMAGED CABLES SHALL BE REMOVED AND
<br />4. PERFORM GROUND TEST TO MEASURE GROUND RESISTANCE OF GROUNDING
<br />PROPER TRADES.
<br />REPLACED AT THE CONTRACTOR'S EXPENSE.
<br />SYSTEM USING THE IEEE STANDARD 3-POINT "FALL -OF -POTENTIAL" METHOD.
<br />PROVIDE PLOTTED TEST VALUES & LOCATION SKETCH. NOTIFY THE ENGINEER
<br />B. ALL ELECTRICAL EQUIPMENT FURNISHED SHALL BE ADJUSTED, ALIGNED AND
<br />C. DISCONNECT SWITCHES:
<br />IMMEDIATELY IF MEASURED VALUE IS OVER 5 OHMS.
<br />TESTED BY THE CONTRACTOR AS REQUIRED TO PRODUCE THE INTENDED
<br />PERFORMANCE.
<br />1. INSTALL DISCONNECT SWITCHES LEVEL AND PLUMB. CONNECT TO WIRING
<br />END OF SECTION
<br />SYSTEM AND GROUND AS INDICATED.
<br />C. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL THOROUGHLY CLEAN
<br />END OF SPECIFICATION
<br />ALL EXPOSED EQUIPMENT, REMOVE ALL LABELS AND ANY DEBRIS, CRATING OR
<br />D. GROUNDING:
<br />CARTONS AND LEAVE THE INSTALLATION FINISHED AND READY FOR OPERATION.
<br />1. ALL METALLIC PARTS OF ELECTRICAL EQUIPMENT WHICH DO NOT CARRY
<br />3.3 COORDINATION:
<br />CURRENT SHALL BE GROUNDED IN ACCORDANCE WITH THE REQUIREMENTS OF
<br />ARTICLE 250 OF THE NATIONAL ELECTRICAL CODE.
<br />A. THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ELECTRICAL ITEMS
<br />WITH THE OWNER -FURNISHED EQUIPMENT DELIVERY SCHEDULE TO PREVENT
<br />2. PROVIDE ELECTRICAL GROUNDING AND BONDING SYSTEMS INDICATED WITH
<br />UNNECESSARY DELAYS IN THE TOTAL WORK.
<br />ASSEMBLY OF MATERIALS, INCLUDING GROUNDING ELECTRODES, BONDING
<br />JUMPERS AND ADDITIONAL ACCESSORIES AS REQUIRED FOR A COMPLETE
<br />3.4 INSTALLATION:
<br />INSTALLATION.
<br />A. CONDUIT:
<br />3. ROUTE GROUNDING CONNECTIONS AND CONDUCTORS TO GROUND IN THE
<br />SHORTEST AND STRAIGHTEST PATHS POSSIBLE TO MINIMIZE TRANSIENT VOLTAGE
<br />1. ALL ELECTRICAL WIRING SHALL BE INSTALLED IN CONDUrr AS HEREIN
<br />RISES.
<br />SPECIFIED. NO CONDUIT OR TUBING OF LESS THAN 3/4" NOMINAL SIZE SHALL
<br />BE USED.
<br />4. TIGHTEN GROUNDING AND BONDING CONNECTORS, INCLUDING SCREWS AND
<br />BOLTS, IN ACCORDANCE WITH MANUFACTURER'S PUBLISHED TORQUE
<br />2. PROVIDE RGS CONDUIT FOR ALL EXPOSED, EXTERIOR CONDUIT.
<br />TIGHTENING VALUES FOR CONNECTORS AND BOLTS. WHERE MANUFACTURER'S
<br />TORQUING REQUIREMENTS ARE NOT AVAILABLE, TIGHTEN CONNECTIONS TO
<br />3. PROVIDE SCHEDULE 40 PVC OR RGS CONDUIT BELOW GRADE, 1" MINIMUM,
<br />COMPLY WITH TIGHTENING TORQUE VALUES SPECIFIED IN UL 486A TO ASSURE
<br />UNLESS NOTED OTHERWISE. ALL 90 DEGREE BENDS TO ABOVE GRADE SHALL
<br />PERMANENT AND EFFECTIVE GROUNDING.
<br />BE RGS. MINIMUM BURIAL DEPTH SHALL BE 24" CLEAR TO TOP OF CONDUIT,
<br />UNLESS NOTED OTHERWISE.
<br />5. ALL UNDERGROUND GROUNDING CONNECTIONS SHALL BE MADE BY THE
<br />EXOTHERMIC WELD PROCESS AND INSTALLED IN ACCORDANCE WITH THE
<br />4. USE GALVANIZED FLEXIBLE STEEL CONDUIT WHERE DIRECT CONNECTION IS NOT
<br />MANUFACTURER'S INSTRUCTIONS.
<br />DESIRABLE FOR REASONS OF EQUIPMENT MOVEMENT, VIBRATION, OR FOR EASE
<br />OF MAINTENANCE. USE LIQUIDTIGHT, PVC COATED FLEXIBLE METAL CONDUIT
<br />6. ALL GROUND CONNECTIONS SHALL BE INSPECTED FOR TIGHTNESS.
<br />FOR OUTDOOR APPLICATIONS.
<br />EXOTHERMIC -WELDED CONNECTIONS SHALL BE APPROVED BY THE
<br />CONSTRUCTION INSPECTOR BEFORE BEING PERMANENTLY CONCEALED.
<br />5. INSTALL GALVANIZED FLEXIBLE STEEL CONDUIT AT ALL POINTS OF CONNECTION
<br />TO EQUIPMENT MOUNTED ON SUPPORTS TO ALLOW FOR EXPANSION AND
<br />7. APPLY CORROSION -RESISTANT FINISH TO FIELD CONNECTIONS, AND PLACES
<br />CONTRACTION.
<br />WHERE FACTORY APPLIED PROTECTIVE COATINGS HAVE BEEN DESTROYED. USE
<br />COPPER -BASED "NO-OX" OR APPROVED EQUAL.
<br />6. A RUN OF CONDUIT BETWEEN BOXES OR FITTINGS SHALL NOT CONTAIN MORE
<br />THAN THE EQUIVALENT OF FOUR QUARTER -BENDS INCLUDING THOSE BENDS
<br />8. A SEPARATE, CONTINUOUS, INSULATED EQUIPMENT GROUNDING CONDUCTOR
<br />LOCATED IMMEDIATELY AT THE BOX OR FITTING. THE RADIUS OF BENDS SHALL
<br />SHALL BE INSTALLED IN ALL FEEDER AND BRANCH CIRCUITS
<br />NEVER BE SHORTER THAN THAT OF THE CORRESPONDING TRADE ELBOW.
<br />9. BOND ALL INSULATED GROUNDING BUSHINGS WITH A BARE #6 AWG
<br />7. WHERE CONDUIT HAS TO BE CUT IN THE FIELD, IT SHALL BE CUT SQUARE
<br />GROUNDING CONDUCTOR TO A GROUND BUS OR GROUNDING LUG IN
<br />WITH A PIPE CUTTER USING CUTTING KNIVES.
<br />ENCLOSURE.
<br />8. ALL CONDUITS SHALL BE SWABBED CLEAN BY PULLING AN APPROPRIATE SIZE
<br />10. DIRECT BURIED GROUND CONDUCTORS SHALL BE INSTALLED AT A NOMINAL
<br />MANDREL THROUGH THE CONDUIT BEFORE INSTALLATION OF WIRE OR CABLE.
<br />DEPTH OF 30" BELOW GRADE, UNLESS NOTED OTHERWISE.
<br />CLEAR ALL BLOCKAGES AND REMOVE BURRS, DIRT, AND DEBRIS.
<br />11. ALL GROUNDING CONDUCTORS EMBEDDED IN OR PENETRATING CONCRETE
<br />9. INSTALL PULL STRINGS IN ALL EMPTY CONDUITS. IDENTIFY PULL STRINGS AT
<br />SHALL BE INSULATED OR INSTALLED IN PVC CONDUIT.
<br />EACH END WITH ITS DESTINATION.
<br />12. INSTALL ELECTROLYTIC GROUNDING SYSTEM IN STRICT ACCORDANCE WITH
<br />10. PROVIDE INSULATED GROUNDING BUSHINGS FOR ALL CONDUITS STUBBED INTO
<br />MANUFACTURER'S INSTRUCTIONS. REMOVE SEALING TAPE FROM LEACHING AND
<br />EQUIPMENT ENCLOSURES OR STUBBED OUT FOR FUTURE USE BY OTHERS.
<br />BREATHER HOLES. INSTALL PROTECTIVE BOX FLUSH WITH GRADE.
<br />11. CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL CONDUITS DURING
<br />13. DRIVE GROUND RODS UNTIL TOPS ARE 30" BELOW FINAL GRADE.
<br />CONSTRUCTION. TEMPORARY OPENINGS IN THE CONDUIT SYSTEM SHALL BE
<br />PLUGGED OR CAPPED TO PREVENT ENTRANCE OF MOISTURE OR FOREIGN
<br />14. GROUNDING CONDUCTOR TO EQUIPMENT GROUND LUGS:
<br />MATTER. CONTRACTOR SHALL REPLACE ANY CONDUITS CONTAINING FOREIGN
<br />MATERIALS THAT CANNOT BE REMOVED.
<br />a. BOLTED TO EQUIPMENT HOUSING WITH STAINLESS STEEL BOLTS AND LOCK
<br />12. INSTALL 2" ORANGE DETECTABLE TAPE 12" ABOVE ALL UNDERGROUND CONDUIT
<br />WASHERS.
<br />AND WIRE.
<br />b. ALL EQUIPMENT TO BE GROUNDED SHALL BE FREE OF PAINT OR ANY
<br />OTHER MATERIAL COVERING BARE METAL AT THE POINT OF CONNECTION.
<br />13. CONDUITS SHALL BE INSTALLED IN SUCH A MANNER AS TO INSURE AGAINST
<br />COLLECTION OF TRAPPED CONDENSATION.
<br />3.5 ACCEPTANCE TESTING:
<br />B. WIRE AND CABLE:
<br />A. PROVIDE PERSONNEL AND EQUIPMENT, MAKE REQUIRED TESTS, AND SUBMIT TEST
<br />REPORTS UPON COMPLETION OF TESTS.
<br />1. ALL POWER WIRING SHALL BE COLOR CODED AS FOLLOWS:
<br />B. WHEN MATERIAL AND/OR WORKMANSHIP IS FOUND NOT TO COMPLY WITH THE
<br />DESCRIPTION 120/240V 208Y/120V 480Y/277V
<br />SPECIFIED REQUIREMENTS, THE NONCOMPLYING ITEMS SHALL BE REMOVED FROM
<br />PHASE BLACK BLACK BROWN
<br />THE JOBSrrE AND REPLACED WITH ITEMS COMPLYING WITH THE SPECIFIED
<br />PHASE B RED RED ORANGE
<br />REQUIREMENTS PROMPTLY AFTER RECEIPT OF NOTICE OF SUCH NON-COMPLIANCE.
<br />PHASE C BLUE YELLOW
<br />NEUTRAL WHITE WHITE GRAY
<br />GROUND GREEN GREEN GREEN
<br />a i riv
<br />r:
<br />Planning and Building Age
<br />11 /10/2025
<br />Q FS d
<br />SffE4RMfTS I AN C
<br />KEISLING
<br />J 24647
<br />as erID:
<br />D TTELECTRICAL
<br />2 �Q
<br />DocuSgn/bytJ F06v,
<br />tL Ssu"
<br />CS
<br />EF94D8A5B80B407
<br />ENGINEERING LICENSE:
<br />STATE OF CALIFORNIA
<br />ENGINEER: PE#: DISCIPLINE:
<br />SDK SHELTON D. KEISLING 24647 ELECTRICAL E
<br />DJW DAVID J WALDRON 25608 ELECTRICAL E
<br />TMS TERRANCE M. SUPER 17150 ELECTRICAL E
<br />CLanHarbo!5
<br />PLANS PREPARED FOR:
<br />AGI 1
<br />PLANS PREPARED BY:
<br />��.
<br />SSC
<br />DRAWING NOTICE:
<br />THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE
<br />PROPERTY OF SSC, IN AND IS LENT TO THE BORROWER FOR
<br />THEIR CONFIDENTIAL USE ONLY, AND IN CONSIDERATION OF
<br />THE LOAN OF THIS DRAWING, THE BORROWER PROMISES AND
<br />AGREES TO RETURN IT UPON REQUEST AND AGREES THAT IT
<br />WILL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
<br />DISPOSED OF DIRECTLY OR INDIRECTLY, NCR USED FOR ANY
<br />PURPOSE OTHER THAN FOR WHICH IT IS FURNISHED.
<br />SUBMITTALS:
<br />DESCRIPTION
<br />DATE
<br />BY
<br />REV
<br />ISSUED FOR REVIEW
<br />11/22/24
<br />ART
<br />0
<br />REVISED PER CLIENT COMMENTS
<br />12/13/24
<br />ART
<br />1
<br />REVISED PER CLIENT COMMENTS
<br />01/28/25
<br />DWO
<br />2
<br />REVISED PER CLIENT COMMENTS
<br />09/05/25
<br />TJM
<br />3
<br />REVISED PER AHJ COMMENTS
<br />11/07/25
<br />EDA
<br />4
<br />APPLICANT SITE NAME:
<br />CLEAN HARBORS (SANTA ANA)
<br />APPLICANT SITE NUMBER:
<br />AGI-EV-0006
<br />SITE ADDRESS.
<br />2120 S YALE STREET
<br />SANTA ANA, CA 92704
<br />SHEET DESCRIPTION:
<br />SHEET#:
<br />SPECIFICATIONS
<br />SP-2 1
<br />(5 OF 5)