Docusign Envelope ID: 244D77F2-FOA2-4894-B44B-1CO03F256B68 <br />PART 3: EXECUTION <br />2. SPLICES SHALL BE MADE ONLY AT OUTLETS, JUNCTION BOXES, OR <br />C. TEST PROCEDURES: <br />ACCESSIBLE RACEWAYS WITH PRESSURE -TYPE CONNECTORS. <br />3.1 GENERAL: <br />1. ALL FEEDERS SHALL HAVE THEIR INSULATION TESTED AFTER INSTALLATION, BUT <br />3. PULLING LUBRICANTS SHALL BE SOAPSTONE POWDER, POWDERED TALC, OR A <br />BEFORE CONNECTION TO DEVICES. THE CONDUCTORS SHALL TEST FREE FROM <br />A. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH <br />COMMERCIAL PULLING COMPOUND. NO SOAP SUDS, SOAP FLAKES, OIL, OR <br />SHORT CIRCUITS AND GROUNDS. TESTING SHALL BE FOR ONE MINUTE USING <br />THE MANUFACTURER'S RECOMMENDATIONS. <br />GREASE SHALL BE USED, AS THESE MAY BE HARMFUL TO CABLE INSULATION. <br />1000V DC. INVESTIGATE ANY VALUES LESS THAN 50 MEGAOHMS. <br />CONTRACTOR SHALL USE NYLON OR HEMP ROPE FOR PULLING CABLE TO <br />B. EQUIPMENT SHALL BE TIGHTLY COVERED AND PROTECTED AGAINST DIRT OR WATER, <br />AVOID SCORING THE CONDUIT. <br />2. PRIOR TO ENERGIZING CIRCUITRY, TEST WIRING DEVICES FOR ELECTRICAL <br />AND AGAINST CHEMICAL OR MECHANICAL INJURY DURING INSTALLATION AND <br />CONTINUITY AND PROPER POLARITY CONNECTIONS, <br />CONSTRUCTION PERIODS. <br />4. CABLES SHALL BE NEATLY TRAINED, WITHOUT INTERLACING, AND BE OF <br />SUFFICIENT LENGTH IN ALL BOXES, EQUIPMENT, ETC. TO PERMIT MAKING A <br />3. MEASURE AND RECORD VOLTAGES BETWEEN PHASES AND BETWEEN PHASE <br />3.2 LABOR AND WORKMANSHIP: <br />NEAT ARRANGEMENT. CABLES SHALL BE SECURED IN A MANNER TO AVOID <br />WIRES AND NEUTRALS. SUBMIT A REPORT OF MAXIMUM AND MINIMUM <br />TENSION ON CONDUCTORS OR TERMINALS, AND SHALL BE PROTECTED FROM <br />VOLTAGES. <br />A. ALL LABOR FOR THE INSTALLATION OF MATERIALS AND EQUIPMENT FURNISHED FOR <br />MECHANICAL INJURY AND FROM MOISTURE. SHARP BENDS OVER CONDUIT <br />THE ELECTRICAL SYSTEM SHALL BE DONE BY EXPERIENCED MECHANICS OF THE <br />BUSHINGS ARE PROHIBITED. DAMAGED CABLES SHALL BE REMOVED AND <br />4. PERFORM GROUND TEST TO MEASURE GROUND RESISTANCE OF GROUNDING <br />PROPER TRADES. <br />REPLACED AT THE CONTRACTOR'S EXPENSE. <br />SYSTEM USING THE IEEE STANDARD 3-POINT "FALL -OF -POTENTIAL" METHOD. <br />PROVIDE PLOTTED TEST VALUES & LOCATION SKETCH. NOTIFY THE ENGINEER <br />B. ALL ELECTRICAL EQUIPMENT FURNISHED SHALL BE ADJUSTED, ALIGNED AND <br />C. DISCONNECT SWITCHES: <br />IMMEDIATELY IF MEASURED VALUE IS OVER 5 OHMS. <br />TESTED BY THE CONTRACTOR AS REQUIRED TO PRODUCE THE INTENDED <br />PERFORMANCE. <br />1. INSTALL DISCONNECT SWITCHES LEVEL AND PLUMB. CONNECT TO WIRING <br />END OF SECTION <br />SYSTEM AND GROUND AS INDICATED. <br />C. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL THOROUGHLY CLEAN <br />END OF SPECIFICATION <br />ALL EXPOSED EQUIPMENT, REMOVE ALL LABELS AND ANY DEBRIS, CRATING OR <br />D. GROUNDING: <br />CARTONS AND LEAVE THE INSTALLATION FINISHED AND READY FOR OPERATION. <br />1. ALL METALLIC PARTS OF ELECTRICAL EQUIPMENT WHICH DO NOT CARRY <br />3.3 COORDINATION: <br />CURRENT SHALL BE GROUNDED IN ACCORDANCE WITH THE REQUIREMENTS OF <br />ARTICLE 250 OF THE NATIONAL ELECTRICAL CODE. <br />A. THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ELECTRICAL ITEMS <br />WITH THE OWNER -FURNISHED EQUIPMENT DELIVERY SCHEDULE TO PREVENT <br />2. PROVIDE ELECTRICAL GROUNDING AND BONDING SYSTEMS INDICATED WITH <br />UNNECESSARY DELAYS IN THE TOTAL WORK. <br />ASSEMBLY OF MATERIALS, INCLUDING GROUNDING ELECTRODES, BONDING <br />JUMPERS AND ADDITIONAL ACCESSORIES AS REQUIRED FOR A COMPLETE <br />3.4 INSTALLATION: <br />INSTALLATION. <br />A. CONDUIT: <br />3. ROUTE GROUNDING CONNECTIONS AND CONDUCTORS TO GROUND IN THE <br />SHORTEST AND STRAIGHTEST PATHS POSSIBLE TO MINIMIZE TRANSIENT VOLTAGE <br />1. ALL ELECTRICAL WIRING SHALL BE INSTALLED IN CONDUrr AS HEREIN <br />RISES. <br />SPECIFIED. NO CONDUIT OR TUBING OF LESS THAN 3/4" NOMINAL SIZE SHALL <br />BE USED. <br />4. TIGHTEN GROUNDING AND BONDING CONNECTORS, INCLUDING SCREWS AND <br />BOLTS, IN ACCORDANCE WITH MANUFACTURER'S PUBLISHED TORQUE <br />2. PROVIDE RGS CONDUIT FOR ALL EXPOSED, EXTERIOR CONDUIT. <br />TIGHTENING VALUES FOR CONNECTORS AND BOLTS. WHERE MANUFACTURER'S <br />TORQUING REQUIREMENTS ARE NOT AVAILABLE, TIGHTEN CONNECTIONS TO <br />3. PROVIDE SCHEDULE 40 PVC OR RGS CONDUIT BELOW GRADE, 1" MINIMUM, <br />COMPLY WITH TIGHTENING TORQUE VALUES SPECIFIED IN UL 486A TO ASSURE <br />UNLESS NOTED OTHERWISE. ALL 90 DEGREE BENDS TO ABOVE GRADE SHALL <br />PERMANENT AND EFFECTIVE GROUNDING. <br />BE RGS. MINIMUM BURIAL DEPTH SHALL BE 24" CLEAR TO TOP OF CONDUIT, <br />UNLESS NOTED OTHERWISE. <br />5. ALL UNDERGROUND GROUNDING CONNECTIONS SHALL BE MADE BY THE <br />EXOTHERMIC WELD PROCESS AND INSTALLED IN ACCORDANCE WITH THE <br />4. USE GALVANIZED FLEXIBLE STEEL CONDUIT WHERE DIRECT CONNECTION IS NOT <br />MANUFACTURER'S INSTRUCTIONS. <br />DESIRABLE FOR REASONS OF EQUIPMENT MOVEMENT, VIBRATION, OR FOR EASE <br />OF MAINTENANCE. USE LIQUIDTIGHT, PVC COATED FLEXIBLE METAL CONDUIT <br />6. ALL GROUND CONNECTIONS SHALL BE INSPECTED FOR TIGHTNESS. <br />FOR OUTDOOR APPLICATIONS. <br />EXOTHERMIC -WELDED CONNECTIONS SHALL BE APPROVED BY THE <br />CONSTRUCTION INSPECTOR BEFORE BEING PERMANENTLY CONCEALED. <br />5. INSTALL GALVANIZED FLEXIBLE STEEL CONDUIT AT ALL POINTS OF CONNECTION <br />TO EQUIPMENT MOUNTED ON SUPPORTS TO ALLOW FOR EXPANSION AND <br />7. APPLY CORROSION -RESISTANT FINISH TO FIELD CONNECTIONS, AND PLACES <br />CONTRACTION. <br />WHERE FACTORY APPLIED PROTECTIVE COATINGS HAVE BEEN DESTROYED. USE <br />COPPER -BASED "NO-OX" OR APPROVED EQUAL. <br />6. A RUN OF CONDUIT BETWEEN BOXES OR FITTINGS SHALL NOT CONTAIN MORE <br />THAN THE EQUIVALENT OF FOUR QUARTER -BENDS INCLUDING THOSE BENDS <br />8. A SEPARATE, CONTINUOUS, INSULATED EQUIPMENT GROUNDING CONDUCTOR <br />LOCATED IMMEDIATELY AT THE BOX OR FITTING. THE RADIUS OF BENDS SHALL <br />SHALL BE INSTALLED IN ALL FEEDER AND BRANCH CIRCUITS <br />NEVER BE SHORTER THAN THAT OF THE CORRESPONDING TRADE ELBOW. <br />9. BOND ALL INSULATED GROUNDING BUSHINGS WITH A BARE #6 AWG <br />7. WHERE CONDUIT HAS TO BE CUT IN THE FIELD, IT SHALL BE CUT SQUARE <br />GROUNDING CONDUCTOR TO A GROUND BUS OR GROUNDING LUG IN <br />WITH A PIPE CUTTER USING CUTTING KNIVES. <br />ENCLOSURE. <br />8. ALL CONDUITS SHALL BE SWABBED CLEAN BY PULLING AN APPROPRIATE SIZE <br />10. DIRECT BURIED GROUND CONDUCTORS SHALL BE INSTALLED AT A NOMINAL <br />MANDREL THROUGH THE CONDUIT BEFORE INSTALLATION OF WIRE OR CABLE. <br />DEPTH OF 30" BELOW GRADE, UNLESS NOTED OTHERWISE. <br />CLEAR ALL BLOCKAGES AND REMOVE BURRS, DIRT, AND DEBRIS. <br />11. ALL GROUNDING CONDUCTORS EMBEDDED IN OR PENETRATING CONCRETE <br />9. INSTALL PULL STRINGS IN ALL EMPTY CONDUITS. IDENTIFY PULL STRINGS AT <br />SHALL BE INSULATED OR INSTALLED IN PVC CONDUIT. <br />EACH END WITH ITS DESTINATION. <br />12. INSTALL ELECTROLYTIC GROUNDING SYSTEM IN STRICT ACCORDANCE WITH <br />10. PROVIDE INSULATED GROUNDING BUSHINGS FOR ALL CONDUITS STUBBED INTO <br />MANUFACTURER'S INSTRUCTIONS. REMOVE SEALING TAPE FROM LEACHING AND <br />EQUIPMENT ENCLOSURES OR STUBBED OUT FOR FUTURE USE BY OTHERS. <br />BREATHER HOLES. INSTALL PROTECTIVE BOX FLUSH WITH GRADE. <br />11. CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL CONDUITS DURING <br />13. DRIVE GROUND RODS UNTIL TOPS ARE 30" BELOW FINAL GRADE. <br />CONSTRUCTION. TEMPORARY OPENINGS IN THE CONDUIT SYSTEM SHALL BE <br />PLUGGED OR CAPPED TO PREVENT ENTRANCE OF MOISTURE OR FOREIGN <br />14. GROUNDING CONDUCTOR TO EQUIPMENT GROUND LUGS: <br />MATTER. CONTRACTOR SHALL REPLACE ANY CONDUITS CONTAINING FOREIGN <br />MATERIALS THAT CANNOT BE REMOVED. <br />a. BOLTED TO EQUIPMENT HOUSING WITH STAINLESS STEEL BOLTS AND LOCK <br />12. INSTALL 2" ORANGE DETECTABLE TAPE 12" ABOVE ALL UNDERGROUND CONDUIT <br />WASHERS. <br />AND WIRE. <br />b. ALL EQUIPMENT TO BE GROUNDED SHALL BE FREE OF PAINT OR ANY <br />OTHER MATERIAL COVERING BARE METAL AT THE POINT OF CONNECTION. <br />13. CONDUITS SHALL BE INSTALLED IN SUCH A MANNER AS TO INSURE AGAINST <br />COLLECTION OF TRAPPED CONDENSATION. <br />3.5 ACCEPTANCE TESTING: <br />B. WIRE AND CABLE: <br />A. PROVIDE PERSONNEL AND EQUIPMENT, MAKE REQUIRED TESTS, AND SUBMIT TEST <br />REPORTS UPON COMPLETION OF TESTS. <br />1. ALL POWER WIRING SHALL BE COLOR CODED AS FOLLOWS: <br />B. WHEN MATERIAL AND/OR WORKMANSHIP IS FOUND NOT TO COMPLY WITH THE <br />DESCRIPTION 120/240V 208Y/120V 480Y/277V <br />SPECIFIED REQUIREMENTS, THE NONCOMPLYING ITEMS SHALL BE REMOVED FROM <br />PHASE BLACK BLACK BROWN <br />THE JOBSrrE AND REPLACED WITH ITEMS COMPLYING WITH THE SPECIFIED <br />PHASE B RED RED ORANGE <br />REQUIREMENTS PROMPTLY AFTER RECEIPT OF NOTICE OF SUCH NON-COMPLIANCE. <br />PHASE C BLUE YELLOW <br />NEUTRAL WHITE WHITE GRAY <br />GROUND GREEN GREEN GREEN <br />a i riv <br />r: <br />Planning and Building Age <br />11 /10/2025 <br />Q FS d <br />SffE4RMfTS I AN C <br />KEISLING <br />J 24647 <br />as erID: <br />D TTELECTRICAL <br />2 �Q <br />DocuSgn/bytJ F06v, <br />tL Ssu" <br />CS <br />EF94D8A5B80B407 <br />ENGINEERING LICENSE: <br />STATE OF CALIFORNIA <br />ENGINEER: PE#: DISCIPLINE: <br />SDK SHELTON D. KEISLING 24647 ELECTRICAL E <br />DJW DAVID J WALDRON 25608 ELECTRICAL E <br />TMS TERRANCE M. SUPER 17150 ELECTRICAL E <br />CLanHarbo!5 <br />PLANS PREPARED FOR: <br />AGI 1 <br />PLANS PREPARED BY: <br />��. <br />SSC <br />DRAWING NOTICE: <br />THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE <br />PROPERTY OF SSC, IN AND IS LENT TO THE BORROWER FOR <br />THEIR CONFIDENTIAL USE ONLY, AND IN CONSIDERATION OF <br />THE LOAN OF THIS DRAWING, THE BORROWER PROMISES AND <br />AGREES TO RETURN IT UPON REQUEST AND AGREES THAT IT <br />WILL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE <br />DISPOSED OF DIRECTLY OR INDIRECTLY, NCR USED FOR ANY <br />PURPOSE OTHER THAN FOR WHICH IT IS FURNISHED. <br />SUBMITTALS: <br />DESCRIPTION <br />DATE <br />BY <br />REV <br />ISSUED FOR REVIEW <br />11/22/24 <br />ART <br />0 <br />REVISED PER CLIENT COMMENTS <br />12/13/24 <br />ART <br />1 <br />REVISED PER CLIENT COMMENTS <br />01/28/25 <br />DWO <br />2 <br />REVISED PER CLIENT COMMENTS <br />09/05/25 <br />TJM <br />3 <br />REVISED PER AHJ COMMENTS <br />11/07/25 <br />EDA <br />4 <br />APPLICANT SITE NAME: <br />CLEAN HARBORS (SANTA ANA) <br />APPLICANT SITE NUMBER: <br />AGI-EV-0006 <br />SITE ADDRESS. <br />2120 S YALE STREET <br />SANTA ANA, CA 92704 <br />SHEET DESCRIPTION: <br />SHEET#: <br />SPECIFICATIONS <br />SP-2 1 <br />(5 OF 5) <br />