My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2102 S Flower St- Sign - Plan
PBA
>
Building
>
ProjectDox
>
F
>
Flower St
>
2102 S Flower St
>
2102 S Flower St- Sign - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:02:55 AM
Creation date
2/13/2026 5:01:04 AM
Metadata
Fields
Template:
Plan
Permit Number
101120698
Full Address
2102 S Flower St
Street Number
2102
Street Direction
S
Street Name
Flower
Street Suffix
St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LEVEL 1 <br />+0' -0" <br />T.O.S. NORTH ROOF <br />+10' -6" <br />T.O. HIGH CMU <br />+14' -0" <br />2 <br />A306 <br />3 <br />A306 <br />1 <br />A306 <br />ABCDEFGHJ <br />4 <br />A306 <br />6 <br />A306 <br />OPEN <br />5 <br />A306 <br />L <br />M2M37.1 10.4 <br />SF4 <br />A802 <br />1 <br />A802 <br />3 <br />T.O.S. SOUTH ROOF <br />+10' -0" <br />26.1 <br />A843 <br />2 <br />A842 <br />7 <br />A842 <br />1 <br />LEVEL 1 <br />+0' -0" <br />T.O.S. NORTH ROOF <br />+10' -6" <br />T.O. HIGH CMU <br />+14' -0" <br />2 <br />A306 <br />3 <br />A306 <br />1 <br />A306 <br />A B C D E F G H J <br />4 <br />A306 <br />6 <br />A306 <br />OPEN <br />5 <br />A306 <br />L <br />M5M6M9 <br />SF4 <br />7.1 7.222.2 7.1 <br />PPPP <br />T.O.S. SOUTH ROOF <br />+10' -0" <br />SF1 SF3SF2 <br />1. FFE: +0' - 0" = +51.00 SEE CIVIL DRAWINGS. <br />2. ALL OPENINGS ARE FULL OR 1/2 BLOCK CMU MODULES U.O.N. SEE <br />CMU PLAN FOR MORE INFO AND WALL PLACEMENT. <br />3. ALL EXPOSED C.I.P. CONC. & CMU BLOCK TO RECEIVE WATERPROOF <br />& ANTI-GRAFFITI COATING. SEE SPECIFICATIONS. <br />4. AUTOMATIC FIRE SPRINKLER SYSTEM THROUGHOUT BUILDING. <br />SPRINKLERS SHALL BE DESIGNED TO COORDINATE WITH DUCTS, <br />PIPING, CONDUIT, LIGHTING, ACCESS PANEL LOCATIONS AND OTHER <br />CEILING ELEMENTS FOR A CLEAN, ARCHITECTURAL APPEARANCE. <br />5. SLAB DIMENSIONS ARE MEASURED TO GRIDLINES. SEE SLAB PLAN. <br />6. ALL FLOOR DRAINS ARE TO BE CENTERED IN THEIR RESPECTIVE <br />SPACES, U.O.N. SEE 1/A202 <br />7. ALL EXPOSED STRUCTURAL, MECHANICAL, PLUMBING AND <br />ELECTRICAL ELEMENTS TO BE PAINTED, U.O.N. <br />8. REFER TO SPECIFICATIONS FOR LIST OF MATERIAL FINISHES, <br />COLORS, AND PAINT COLORS. <br />9. ALL APPLIANCES TO BE OWNER FURNISHED AND CONTRACTOR <br />INSTALLED, U.O.N. <br />LEVEL 1 <br />+0' -0" <br />T.O.S. NORTH ROOF <br />+10' -6" <br />T.O. HIGH CMU <br />+14' -0" <br />1 <br />A305 <br />3 2 1 <br />2 <br />A305 <br />7.1 <br />M1 7.3 <br />T.O.S. SOUTH ROOF <br />+10' -0" <br />5.5 8.15.1 <br />LEVEL 1 <br />+0' -0" <br />T.O.S. NORTH ROOF <br />+10' -6" <br />T.O. HIGH CMU <br />+14' -0" <br />1 <br />A305 <br />321 <br />2 <br />A305 <br />M4 <br />7.1 7.3 <br />T.O.S. SOUTH ROOF <br />+10' -0" <br />LEVEL 1 <br />+0' -0" <br />T.O.S. NORTH ROOF <br />+10' -6" <br />T.O. HIGH CMU <br />+14' -0" <br />1 <br />A305 <br />321 <br />2 <br />A305 <br />M7 <br />7.2 <br />T.O.S. SOUTH ROOF <br />+10' -0" <br />LEVEL 1 <br />+0' -0" <br />T.O.S. NORTH ROOF <br />+10' -6" <br />T.O. HIGH CMU <br />+14' -0" <br />1 <br />A305 <br />3 2 1 <br />2 <br />A305 <br />M8 <br />8.5 7.1 <br />PP <br />T.O.S. SOUTH ROOF <br />+10' -0" <br />SF5 <br />SF6 <br />LEVEL 1 <br />+0' -0" <br />1 2 <br />A305 <br />M10M11 <br />M12 <br />M13 <br />7.27.2 <br />LEVEL 1 <br />+0' -0" <br />1 <br />2 <br />A305 <br />7.2 M14 <br />SF#STOREFRONT AND CURTAIN WALL KEY <br />SEE SHEETS A805 & A806 FOR SCHEDULE <br />METAL PANEL KEY -SEE SHEETS A803 & A804 FOR SCHEDULEM- <br />PP DOOR ACTUATOR <br />03/31/25 <br />ARCHITECT: <br />ELS ARCHITECTURE AND URBAN DESIGN <br />2040 Addison Street <br />Berkeley, CA 94704 <br />P: 510.549.2929 <br />CIVIL ENGINEER: <br />KPFF <br />700 South Flower Street, Suite 2100 <br />Los Angeles, CA 90017 <br />P: 213.418.0201 <br />LANDSCAPE ARCHITECT: <br />SWA <br />570 Glenneyre Street <br />Laguna Beach, CA 92651 <br />P: 949.497.5471 <br />STRUCTURAL ENGINEER: <br />JOHN A. MARTIN & ASSOCIATES <br />950 South Grand Avenue, 4th Floor <br />Los Angeles, CA 90015 <br />P: 213.483.6490 <br />MECHANICAL & ELECTRICAL ENGINEER: <br />GUTTMANN & BLAEVOET <br />1620 Montgomery Street, Suite 230 <br />San Francisco, CA 94111 <br />P: 415.655.4000 <br />AQUATICS: <br />AQUATIC DESIGN GROUP <br />2226 Faraday Avenue <br />Carlsbad, CA 92008 <br />P: 760.438.8400 <br />SPECIFICATIONS: <br />SPECWEST <br />1975 E. Buck Ridge Pl <br />Tucson, AZ 85737 <br />P: 800.646.3820 <br />SHEET NUMBER: <br />PROJECT NUMBER: <br />DATE: <br />ISSUE: <br />SHEET TITLE: <br />PROJECT: <br />CLIENT: <br />PROJECT TEAM: <br />STAMP:KEYNOTESLEGEND #SHEET NOTES GENERAL NOTES <br />PERMIT SUBMITTAL <br />EXTERIOR <br />ELEVATIONS <br />A300 <br />JULY 29, 2024 <br />CITY OF SANTA ANA <br />20 CIVIC CENTER PLAZA, SANTA <br />ANA, CA 92701 <br />SANTA ANA <br />MEMORIAL PARK <br />AQUATICS CENTER <br />2102 S FLOWER ST <br />SANTA ANA, CA 92707 <br />202305 <br />1/8" = 1'-0"2 BUILDING ELEVATION EAST <br />1/8" = 1'-0"4 BUILDING ELEVATION WEST <br />1/8" = 1'-0"1 BUILDING ELEVATION NORTH <br />1/8" = 1'-0"3 BUILDING ELEVATION SOUTH <br />1/8" = 1'-0"5 BUILDING ELEVATION BREEZEWAY <br />1/8" = 1'-0"6 BUILDING ELEVATION BREEZEWAY <br />1/8" = 1'-0"7 BUILDING ELEVATION ALCOVE <br />1/8" = 1'-0"8 BUILDING ELEVATION ALCOVE <br />1. PAINT ALL EXPOSED STRUCTURE, UNDERSIDE OF METAL DECK, <br />DUCTS, UTILITIES, AND ALL MISCELLANEOUS SUSPENSION <br />HARDWARE. SEE PAINT SCHEDULE. <br />2. SEE A800 FOR DOOR SCHEDULE <br />3. SEE A803 AND A804 FOR METAL PANEL SCHEDULE <br />4. SEE A805 FOR STOREFRONT SCHEDULE <br />5. SEE A806 FOR SKYLIGHT SCHEDULE <br />6.PROVIDE FLAT MOUNTING PLATE, FINISHED TO MATCH METAL <br />PANEL, FOR ALL EXTERIOR MOUNTED LIGHT SCONCES, SIGNS, ETC <br />PER DETAIL 12/A801, SIM. <br /># DESCRIPTION <br />5.1 STRUCTURE, PAINTED, SEE STRUCTURAL DRAWINGS <br />5.5 AIRFOIL LOUVER SYSTEM, PAINTED <br />7.1 PROFILE METAL PANEL <br />7.2 METAL PANEL <br />7.3 STANDING SEAM METAL ROOF SYSTEM <br />8.1 ALUMINUM FRAMED ROOF SKYLIGHT SYSTEM <br />8.5 MULTI-LITE SERVICE WINDOW WITH SPEAK-THRU AND STAINLESS STEEL COUNTER WITH DEAL TRAY <br />10.4 ALUMINUM GRAPHIC / SIGNAGE <br />22.2 OUTDOOR RINSE SHOWER, SEE PLUMBING DRAWINGS <br />26.1 LIGHT FIXTURES, SEE ELECTRICAL DRAWINGS <br />REVISION <br />NUMBER DATE DESCRIPTION
The URL can be used to link to this page
Your browser does not support the video tag.