Laserfiche WebLink
Client - SCE Charge Ready Date - <br />Project -Brixen EVCS Made By - <br />Location -2100 S Fairview ST, Santa Ana, CA 92704 Orange County. Checked By - <br />Proj. No. -Preliminary - <br />9/18/2024 <br />DSS <br />- <br />80% Review1650605 <br />Description -Design calculations for footing pad of switchboard, Transformer, Distribution Panel, <br />EV Charger & Gateway Final -100% Review <br />1. Switchboard Panel <br />Along both Direction in Risa 3D = 1.33x4 5.320 ft^2 <br />Total horizontal wind load (1.4x0.85x17.67x5.32)/1000 F = 0.112 kip <br />Shear at each support point 0.112/4 0.028 kip <br />Moment at top of foundation (0.112x4x2)/(3)0.299 kip-ft (C.G Considered at 2/3rd <br />of Height) <br />2. Distribution Panel <br />Along both Direction in Risa 3D = 2.67x5.33 14.231 ft^2 <br />Total horizontal wind load (1.4x0.85x17.67x14.23)/1000 F = 0.299 kip <br />Shear at each support point 0.299/4 0.075 kip <br />Moment at top of foundation 0.299x5.33x2/3 1.495 kip-ft (C.G Considered at 2/3rd <br />of Height) <br />3.Transformer <br />Along both Direction in Risa 3D = 2.35x3 7.05 ft^2 <br />Total horizontal wind load (1.4x0.85x17.67x7.05)/1000 0.150 kip <br />Shear at each support point 0.15/4 0.04 kip <br />Moment at top of foundation 0.15x3.71x2/3 0.37 kip-ft (C.G Considered at 2/3rd <br />of Height) <br />4. EVC10 Level 2 AC EV Charger <br />Along both Direction in Risa 3D = 1x6 6.00 ft^2 <br />Total horizontal wind load (1.4x0.85x17.67x6)/1000 0.13 kip <br />Shear at each support point 0.13/4 0.03 kip <br />Moment at top of foundation 0.13x6x2/3 0.52 kip-ft (C.G Considered at 2/3rd <br />of Height) <br />5. Gateway <br />Along both Direction in Risa 3D = 0.925x1.116 1.03 ft^2 <br />Total horizontal wind load (1.8x0.85x17.67x1.03)/1000 0.03 kip <br />Shear at each support point 0.03/4 0.01 kip <br />Moment (0.03x0.47/2)0.01 kip/ft. <br />Moment on each bolt 0.00705/4 0.002 kip/ft.