Laserfiche WebLink
BY: Matt Stiebling, PE <br />SHOP DRAWING / SUBMITTAL REVIEW <br />NO EXCEPTIONS TAKEN <br />MAKE CORRECTIONS NOTED <br />Corrections or comments made relative to submittals during this reviewdo not relieve the contractor from compliance with the drawings and <br />specifications. This check is only for review of general conformance with <br />the design concept of the project and general compliance with the <br />information given in the contract document. The contractor is responsible <br />for confirming and correcting all quantities and dimensions; selecting <br />fabrication processes and techniques of construction; coordinating his <br />work with that of other trades and performing his work in a safe andsatisfactory manner. <br />REVISE AND RESUBMIT <br />REJECTED <br />DATE: 09/02/2022