My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014 W Hemlock Way & Unit #2 - Plan
PBA
>
Building
>
ProjectDox
>
H
>
Hemlock Way
>
2014 W Hemlock Way Unit# 2
>
2014 W Hemlock Way & Unit #2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:02:58 AM
Creation date
2/13/2026 5:01:06 AM
Metadata
Fields
Template:
Plan
Permit Number
101121890
Full Address
2014 W Hemlock Way Unit# 2
Street Number
2014
Street Direction
W
Street Name
Hemlock
Street Suffix
Way
Unit Number
2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 9 <br /> <br />slab should be considered. The subgrade soils for the exterior slabs should be properly re- <br />compacted. <br /> <br />Slab Subgrade Pre-Saturation <br /> <br />The conventional pre-saturation of subgrade soils to minimum 140% of the optimum <br />moisture content to minimum 24 inches deep is not considered necessary for this project. <br />However, spraying with water should be performed prior to concrete pour. <br /> <br />Other Recommendations for Reducing Slab Cracking <br /> <br />While not a geotechnical issue, the potential for slab cracking may also be reduced by <br />careful control of water/cement ratio and slump of concrete. The contractor should take <br />appropriate curing precautions during the pouring of concrete in hot weather to reduce <br />cracking of slabs. <br /> <br />A slip sheet (or equivalent) can be utilized if grouted tile, marble tile, or other crack- <br />sensitive floor covering is planned directly on concrete slabs. <br /> <br />New Driveway <br /> <br />The minimum section required by the City can be used for a new driveway, if any. If <br />there is no minimum requirements by the City, a 5-inch thick concrete slab (PCC), <br />reinforced with #4 rebar (placed at mid-height of slabs) at 18 inches on-centers both <br />ways, or 5-in. thick asphalt concrete (AC), or equivalent, over a 6-inch thick layer of <br />aggregate base (AB) can be used. The aggregate base and subgrade should be properly <br />compacted to a minimum of 95% and 90%, respectively, of the maximum density <br />determined in accordance with ASTM D1557 prior to placement of the concrete slab. <br />Spraying the compacted subgrade soils with water should be performed prior to concrete <br />pour. <br /> <br />If pavers are to be used, they must be properly designed by the civil engineer of record <br />for this project and approved by the city prior to construction. Additional geotechnical <br />data can be provided for design, if requested. <br /> <br />Site Drainage <br /> <br />In general, proper surface drainage should be checked, improved as needed, and <br />maintained to ensure surface water flows away from all structures. Requirements by the <br />city and applicable CBC (2022 CBC) should also be followed. <br /> <br />Roof gutters should be properly provided. Roof drains, gutters and downspouts should be <br />maintained to function as intended. Outlet drains should be kept open. <br /> <br />Irrigation at the site, if any, should be kept to a minimum required to support plant life. <br />
The URL can be used to link to this page
Your browser does not support the video tag.