Laserfiche WebLink
Page 16 <br /> <br />GEOTECHNICAL LOG OF TEST HOLE <br /> <br /> <br />Date: February 19, 2025 TEST HOLE No. 1 <br />Project No. Bao Pham Job No.: SA-01-02-25 <br />Hole Diameter: 4 + inches Equipment: Hand-Auger <br /> <br /> <br /> <br />DEPTH DESCRIPTION <br /> <br /> <br />0’ - 2’+ (Grass). Medium grey silty fine sand with some clay <br />moist, medium dense. <br /> <br />2’- 4.5’+ Medium grey silty fine sand, moist, medium dense. <br /> <br />4.5’- end Medium grey silty fine sand with some clay, moist <br />to very moist, medium dense. <br /> <br /> <br /> <br /> <br /> <br />Total Depth: 5 ft. + <br /> <br />No Caving <br /> <br />No Free-Standing Groundwater <br /> <br />Hole backfilled with onsite soils