Laserfiche WebLink
11 <br />' <br />- <br />0 <br />" <br />8' <br />- <br />0 <br />" <br />8' <br />- <br />0 <br />" <br />8' <br />- <br />0 <br />" <br />13 <br />' <br />- <br />6 <br />" <br />10 <br />' <br />- <br />0 <br />" <br />2' <br />- <br />6 <br />" <br />PA <br />R <br />A <br />P <br />E <br />T <br />REVISIONS BY <br />DATE <br />SCALE <br />JOB NO. <br />SHEET <br />DRAWN <br />NP <br />AS SHOWN <br />1007 <br />05/2025 <br />A3.0 <br />EL <br />E <br />V <br />A <br />T <br />I <br />O <br />N <br />S <br />NOTES: <br />1.EXTERIOR WALL FINISH SHALL MATCH EXISTING RESIDENCE (STUCCO <br />SIDING). WATER RESISTIVE BARRIER SHALL BE 30# GRADED BUILDING <br />PAPER OVER STUD WALLS PER REQUIREMENTS OF R703.2. <br />2.NEW WINDOWS SHALL BE CONSISTENT IN STYLE AND TREATMENTS <br />(RECESSED, HEADER, SILL, OPERATION) AS THE MAIN RESIDENCE. <br />3.ALL EXTERIOR LIGHTING FIXTURES SHALL BE DOWN CASTED. <br />4.COLORS OF EXTERIOR MATERIALS, INCLUDING ROOFING AND SIDING <br />MATERIAL, SHALL BE CONSISTENT WITH THE MAIN RESIDENCE. SIDING <br />MATERIAL ON THE ADU SHALL MATCH THE DIMENSIONS OF EXISTING <br />SIDING MATERIAL ON THE MAIN RESIDENCE. <br />SOUTH ELEVATION <br />SCALE: 1/4"=1'-0" <br />EAST ELEVATION <br />SCALE: 1/4"=1'-0" <br />WEST ELEVATION <br />SCALE: 1/4"=1'-0" <br />NORTH ELEVATION <br />SCALE: 1/4"=1'-0" <br />20 <br />1 <br />6 <br /> <br />S <br />. <br /> <br />O <br />A <br />K <br /> <br />S <br />T <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br />RA <br />F <br />A <br />E <br />L <br /> <br />G <br />A <br />L <br />A <br />V <br />I <br />Z <br />FINISHED GRADE <br />FINISHED GRADE <br />FINISHED CEILING <br />EXISTING GARAGE EXISTING GARAGE <br />13'-6" TOTAL HEIGHT <br />VENTILATION LOUVRE <br />NEW STUCCO TO MATCH <br />EXISTING RESIDENCE