Laserfiche WebLink
Floor Mounted Equipment Anchor Forces (ASD) <br />Unit Properties <br />Unit <br />Wp =586 lbs <br />Anchorage Width, W =49 in <br />Anchorage Length, L =62 in <br />Height, H =34 in <br />CG =23 in <br />Anchor Layout <br />Nanchors, W = <br />Each Side, Parallel to W 2 <br />Nanchors, L = <br />Each Side, Parallel to L 2 <br />Shared Corner Anchors <br />(If YES, then 100+30 considered)YES <br />NAnchors, Total = 4 <br />Forces on Unit (ASD) <br />Fp(H) =1.06 *Wp= 623 lb <br />Fp(V) =0.14 *Wp= 83 lb <br />Mult = Fp(H)*CG =14 k-in <br />Mresist (OT Parallel to W) =.6*Wp*W/2 =9 k-in <br />Mresist (OT Parallel to L) =.6*Wp*L/2 =11 k-in <br />Forces on Anchors (ASD) <br />Tult (OT Parallel to W) =+Fp(V)=77 lbs <br />NAnchors, Total <br />Tult (OT Parallel to L) =+Fp(V)=47 lbs <br />NAnchors, Total <br />Tult (100+30) ==91 lbs <br />Tult (ASD) =Tult (100+30) ==91 lbs <br />Vult (ASD) =Fp(H) / NAnchors, Total =156 lbs <br />1.0*Tmax+0.3*Tmin <br />AC-8, 13 <br />( Mult - Mresist (OT parallel to W) ) <br />(W * Nanchors, L) <br />(Mult - Mresist (OT parallel to L) ) <br />(L * Nanchors, W) <br />H:\2024\240417\4_Engineering\240417.Equip Anchorage <br />3900 Cover Street, Long Beach, CA 90808 562.985.3200 P 562.985.1011 F www.mhpse.com <br />**Anchors Good by Inspection <br />6.0 <br />OCT 2024