My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1721 N Spurgeon St Unit#1 - Plan
>
Building
>
ProjectDox
>
S
>
Spurgeon St
>
1721 N Spurgeon St Unit# 1
>
1721 N Spurgeon St Unit#1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:02:59 AM
Creation date
2/13/2026 5:01:10 AM
Metadata
Fields
Template:
Plan
Permit Number
101123315
Full Address
1721 N Spurgeon St Unit# 1
Street Number
1721
Street Direction
N
Street Name
Spurgeon
Street Suffix
St
Unit Number
1
Document Relationships
101123315 - Permit
(Permit - Plan)
Path:
\Building\Permits\S\Spurgeon St\1721 N Spurgeon St Unit# 1
Text box
ID:
1
Creator:
Import Agent
Created:
2/13/2026 5:01 AM
Modified:
2/12/2026 8:20 AM
Text:
https://drby.me/jgnfe2HP
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
+1 (805) 312-8508 <br />INFO@EEEADVISOR.COM <br />PAGE 18 <br />Picture 54: Wood Frame of balcony <br />https://drby.me/jgnfe2HP <br />Identified defect (2): Wood Frame <br />Issue: Severe level joist/rim joist/ beam/ ledger defect <br />Characteristics: Our investigation has unveiled severe damage to the wood frame components, <br />particularly the joists and rim joists. This includes extensive structural compromise, visible signs <br />of rot, substantial cracks, and potential load-bearing concerns. <br />Impact:These issues significantly impact the overall stability of the structure and require <br />immediate attention. Collaborating with a general contractor and a professional engineer is of <br />utmost importance at this stage. <br />Recommendation:1. Immediate Professional Assessment: Engage a professional engineer and a <br />general contractor without delay to assess the extent of the damage. <br />2. Permits and Engineering Design: Obtain required permits from local authorities and collaborate <br />with a professional engineer to develop a detailed engineering design for repairs or replacements. <br />3. Temporary Support: Implement temporary support measures to ensure the safety of the <br />structure during the repair planning process. <br />4. Structural Repair: execute the repair plan as per the engineer's design. This could involve <br />replacing entire sections, reinforcing connections, and ensuring proper load distribution.
The URL can be used to link to this page
Your browser does not support the video tag.