My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1602 W Brook St & Unit 2 - Plan
PBA
>
Building
>
ProjectDox
>
B
>
Brook St
>
1602 W Brook St
>
1602 W Brook St & Unit 2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:16 AM
Creation date
2/13/2026 5:01:12 AM
Metadata
Fields
Template:
Plan
Permit Number
101120777
101120778
Full Address
1602 W Brook St
1602 W Brook St Unit# 2
Street Number
1602
Street Direction
W
Street Name
Brook
Street Suffix
St
Unit Number
2
Callout
ID:
1
Creator:
Import Agent
Created:
2/13/2026 5:01 AM
Modified:
2/12/2026 8:12 AM
Text:
should reference detail 10/AD1
Polygon
ID:
1
Creator:
Import Agent
Created:
2/13/2026 5:01 AM
Modified:
2/12/2026 8:12 AM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />b <br />0 <br />ih <br />(N) ASPHALT SHINGLES ROOFING <br />ICC/ES-ESR1389 <br />COLOR TO MATCH EXISTING (E) ASPHALT SHINGLES ROOFING <br />(N) ASPHALT SHINGLES ROOFING <br />ICC/ES-ESR1389 <br />COLOR TO MATCH EXISTING <br />12 <br />T.O.PL <br />V-0' <br />STUCCO T (E) STUCCO <br />MATCH EXISTING - - - - - - - <br />COLOR <br />(N <br />(E) <br />(N) 001 <br />STUCCO TO <br />MATCH EXISTING <br />COLOR <br />O <br />ao <br />I (N) TRIM <br />00 <br />T.O.SLAB <br />i <br />ATTACHED ADU EXISTING GARAGE EXISTING GARAGE ATTACHED ADU <br />FRONT ELEVATION - ADU (NORTH - EAST) <br />SCALE: 1/4" = 1'-0" <br />1 <br />v <br />\ <br />ICI <br />CV <br />T.O.SLAB <br />(N) <br />(N) ASPHALT SHINGLES ROOFING <br />ICC/ES-ESR1389 <br />COLOR TO MATCH EXISTING <br />(N) <br />O <br />o M <br />v <br />(N) TRIM <br />N M <br />ASPHALT SHINGLES ROOFING <br />/ES-ESR1389 <br />-OR TO MATCH EXISTING <br />(E) ASPHALT SHINGLES ROOFING <br />12 <br />(D a 4 0 <br />I 1 <br />C) Ch <br />T.O.PL <br />C)- - - - - - - - - - - - - - <br />1 <br />T.O.PL <br />5" WL7rr <br />in <br />N <br />I <br />O N <br />O � <br />o (E) STUCCO <br />ao <br />bo <br />10 <br />10 <br />O <br />O <br />0 <br />0 <br />m <br />N TANKLESS W/H WITHIN <br />AN ENCLOSURE FLUSH <br />1 2 WITH THE WALL AND <br />AD1 PROVIDE A LID COVER <br />REAR ELEVATION - ADU (SOUTH - WEST) <br />SCALE: 1/4" = 1'-0" <br />(N) ASPHALT SHINGLES ROOFING <br />ICC/ES-ESR1389 <br />COLOR TO MATCH EXISTING <br />Mir C CU=A TU I AIf" 1A// oA nI A AIT oA oo I Co <br />.._ _. _.._....... ... ...._...... _... _...-. . <br />0 <br />1 <br />I <br />M <br />T.O.PL <br />1 -0 <br />R-38 <br />1 -0 <br />R-15 <br />R-15 <br />i? <br />10 <br />o <br />(N) BED #2 <br />w <br />(N) LIVING <br />(N) KITCHEN <br />o <br />O <br />U <br />o <br />O <br />J <br />U <br />(N) CONCRETE SLAB <br />R-15 <br />T.O.SLAB <br />ao <br />v <br />c - <br />o <br />, o- <br />co <br />(N) FOOTING �CnTI�'1A1 ♦ ♦ (N) FOOTING <br />VVV I IVI\ I — I <br />SCALE: 1 /4" = V-0" <br />CV <br />N <br />T <br />(N) <br />STUC`CO TO <br />o MATCH EXISTING <br />COL R <br />- (N) TRIM <br />oa C <br />� o N N <br />T.O.SLAB N - - - - - - - - - - - - - T.O.SLAB <br />bo <br />EXISTING GARAGE ATTACHED ADU <br />RIGHT ELEVATION - ADU (NORTH - WEST) <br />SCALE: 1 /4" = 1'-0" <br />12 <br />4 <br />T.O.PL <br />-0' <br />STUCC TO <br />MATCH EXISTING <br />F(N)EL <br />COL RECTRIC <br />METER-ADU <br />O <br />N <br />T.O.SLAB - - - - <br />(N) ASPHALT SHINGLES ROOFING <br />ICC/ES-ESR1389 <br />COLOR TO MATCH EXISTING <br />( <br />0 <br />v <br />rianning <br />a <br />a tsuiiain <br />ge <br />cy <br />„ <br />Ap <br />FOR <br />PER <br />?Mss <br />E <br />10211 MALINDA LN, <br />GARDEN GROVE, CA 92840 <br />TEL: 714 - 487 - 7926 <br />APDESIGNCA@GMAIL.COM <br />Master <br />ID: <br />Date: <br />OWNER: <br />HUNG TRAN <br />AND LISA PHAM <br />SANTA ANA, CA 92703 <br />714-260-2801 <br />REVISIONS <br />NO: <br />DATE <br />REVISIONS <br />1. <br />12/14/2024 <br />PLAN CHECK <br />NOTE: <br />ALL EXTERIOR FINISHES MATCH AMONG THE EXISTING PRIMARY <br />DWELLING, THE NEW ADU, AND NEW ADDITION, WHICH INCLUDES: <br />1. THE DESIGN, PITCH, COLOR, MATERIAL, AND TEXTURE OF THE <br />ROOF EAVE DETAILS OF THE ADU AND ADDITION SHALL BE <br />SUBSTANTIALLY THE SAME AS THE PRIMARY UNIT; <br />2. THE COLOR, MATERIAL, TEXTURE OF ALL BUILDING WALLS, <br />WINDOWS, AND DOORS OF THE ADU AND ADDITION SHALL BE <br />SIMILAR TO AND COMPATIBLE WITH THE PRIMARY UNIT; <br />3. THE ARCHITECTURAL STYLE AND SCALE OF AN ADU AND <br />ADDITION SHALL MATCH THE PRIMARY UNIT. <br />(E) ASPHALT SHINGLES ROOFING <br />IIIII I I I LJ-I <br />T.O.PL �i <br />(E) STUCCO o <br />00 <br />(N) TRIM <br />Cb <br />- - - N T.O.SLAB <br />ATTACHED ADU EXISTING GARAGE <br />LEFT ELEVATION - ADU (SOUTH - EAST) <br />SCALE: 1 /4" = 17-0" <br />EXISTING GARAGE ATTACHED ADU <br />SECTION 2 - 2 <br />SCALE: 1 /4" = 1'-0" <br />N <br />N <br />0 <br />Q <br />N <br />H <br />Z <br />M <br />� <br />�o <br />ti <br />Q <br />�jrn <br />C)0 <br />U <br />W <br />�z <br />2 <br />v <br />m <br />a <br />a <br />~ <br />N <br />Z <br />Q <br />� <br />� <br />i <br />C <br />U <br />N <br />C <br />12) <br />CL <br />PREPARED: <br />ANH PHAN <br />SHEET DESCRIPTION: <br />ELEVATION, SECTION <br />- ADU <br />Date 5/4/25 <br />Job # 23148 <br />Scale <br />Sheet No.: <br />A5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.