My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1529 W St Anne Pl Unit #2 - Plan
PBA
>
Building
>
ProjectDox
>
S
>
St Anne Pl
>
1529 W St Anne Pl Unit# 2
>
1529 W St Anne Pl Unit #2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:19 AM
Creation date
2/13/2026 5:01:13 AM
Metadata
Fields
Template:
Plan
Permit Number
101123772
101125165
Full Address
1529 W St Anne Pl Unit# 2
1529 W St Anne Pl
Street Number
1529
Street Direction
W
Street Name
St Anne
Street Suffix
Pl
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(E <br />) <br /> <br />B <br />A <br />T <br />H <br />R <br />O <br />O <br />M <br />(E) LIVING AREA <br />(E <br />) <br /> <br />D <br />I <br />N <br />I <br />N <br />G <br /> <br />A <br />R <br />E <br />A <br />(E) KITCHEN (E) BEDROOM <br />(E) BEDROOM <br />(E) OFFICE <br />(E) <br />W-H <br />2 <br />(E <br />) <br /> <br />B <br />A <br />T <br />H <br />R <br />O <br />O <br />M <br />(E) BEDROOM <br />2 <br />NOTES FOR NEW ENERGY CODE REQUIREMENTS <br />a) Energy storage systems (ESS) ready. All single-family residences that include one or two dwelling <br />units shall meet the following. All electrical components shall be installed in accordance with the <br />California Electrical Code: <br />1. At least one of the following shall be provided: <br />A. ESS ready interconnection equipment with a minimum backed-up capacity of 60 amps and a minimum <br />of four ESS-supplied branch circuits, or <br />B. A dedicated raceway from the main service to a panelboard (subpanel) that supplies the branch circuits <br />in Section 150.0(s)(2). All branch circuits are permitted to be supplied by the main service panel prior to <br />the installation of an ESS. The trade size of the raceway shall be not less than 1 inch. The panelboard <br />that supplies the branch circuits (subpanel) must be labeled "Subpanel shall include all backed-up load <br />circuits." <br />2. A minimum of four branch circuits shall be identified and have their source of supply collocated at a <br />single panelboard suitable to be supplied by the ESS. At least one circuit shall supply the refrigerator, <br />one lighting circuit shall be located near the primary egress and at least one circuit shall supply a sleeping <br />room receptacle outlet. <br />3. The main panelboard shall have a minimum busbar rating of 225 amps. <br />4. Sufficient space shall be reserved to allow future installation of a system isolation equipment/transfer <br />switch within 3 feet of the main panelboard. Raceways shall be installed between the panelboard and the <br />system isolation equipment/transfer switch location to allow the connection of backup power source. <br />b) Heat pump space heater ready. Systems using gas or propane furnace to serve individual dwelling units <br />shall include the following: <br />1. A dedicated 240 volt branch circuit wiring shall be installed within 3 feet from the furnace and accessible <br />to the furnace with no obstructions. The branch circuit conductors shall be rated at 30 amps minimum. <br />The blank cover shall be identified as "240V ready." All electrical components shall be installed in accordance <br />with the California Electrical Code. <br />2. The main electrical service panel shall have a reserved space to allow for the installation of a double pole <br />circuit breaker for a future heat pump space heater installation. The reserved space shall be permanently <br />marked as "For Future 240V use." <br />c) Electric cooktop ready.Systems using gas or propane cooktop to serve individual dwelling units shall <br />include the following: <br />1. A dedicated 240 volt branch circuit wiring shall be installed within 3 feet from the cooktop and <br />accessible to the cooktop with no obstructions. The branch circuit conductors shall be rated at <br />50 amps minimum. The blank cover shall be identified as "240V ready." All electrical components <br />shall be installed in accordance with the California Electrical Code. <br />2. The main electrical service panel shall have a reserved space to allow for the installation of a double <br />pole circuit breaker for a future electric cooktop installation. The reserved space shall be permanently <br />marked as "For Future 240V use." <br />d) Electric clothes dryer ready.Clothes dryer locations with gas or propane plumbing to serve individual <br />dwelling units shall include the following: <br />1. A dedicated 240 volt branch circuit wiring shall be installed within 3 feet from the clothes dryer <br />location and accessible to the clothes dryer location with no obstructions. The branch circuit <br />conductors shall be rated at 30 amps minimum. The blank cover shall be identified as "240V ready. <br />" All electrical components shall be installed in accordance with the California Electrical Code. <br />2. The main electrical service panel shall have a reserved space to allow for the installation of a <br />double pole circuit breaker for a future electric clothes dryer installation. The reserved <br />space shall be permanently marked as "For Future 240V use." <br />CHECK AND VERIFY ALL DIMENSIONS <br />BEFORE PROCEEDING WITH THE <br />WORK. REPORT DISCREPANCIES <br />TO THE ENGINEER. ALL CONSTRUCTION <br />SHALL CONFORM TO THE C.B.C. <br />DESIGNER: <br />PROJECT: <br />SA <br />I <br />N <br />T <br /> <br />A <br />N <br />N <br />E <br /> <br /> <br />R <br />E <br />S <br />I <br />D <br />E <br />N <br />C <br />E <br />A. <br />D <br />. <br />U <br />. <br />15 <br />2 <br />9 <br /> <br />W <br /> <br />S <br />A <br />I <br />N <br />T <br /> <br />A <br />N <br />N <br />E <br /> <br />P <br />L <br />. <br /> <br />U <br />N <br />I <br />T <br /> <br />2 <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />A <br />D <br />D <br />R <br />E <br />S <br />S <br />: <br />MARK DATE REVISION <br />TITLE: <br />SHEET NUMBER <br />OF SHEETS <br />JOB NO. <br /> 24-410 <br />DRAWN: <br /> GH <br />CHEKED: <br /> GH <br />DATE: <br />FEB 12 25 <br />7-19-25 <br />A2.0 <br />REMOVE EXISTING DOOR AND FILL <br />OUT THE OPENING <br />------------ <br />LEGEND <br />KEYNOTESKEYNOTES <br />NEW WALL <br />EXISTING WALL <br />DEMO WALL <br />THE KEY NOTES DIRECTLY BELOW REFER THE <br />DEMO PLAN ONLY <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />12 <br />11 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />DEMO <br />PLAN <br />SCALE: 1/4" = 1'-0"1 DEMO PLAN <br />------ <br />------- <br />--------
The URL can be used to link to this page
Your browser does not support the video tag.