Laserfiche WebLink
FIN. FLOOR <br />0' -0" <br />FIN. FLOOR <br />0' -0" <br />TOP PLATES <br />8' -0" <br />FIN.GRADE <br />-0' -6" <br />FIN.GRADE <br />-0' -6" <br />TOP ROOF <br />11' -8"TOP ROOF. <br />11' -0" <br />TOP PLATES ADU <br />9' -0" <br />4 NEW EXIST.2 2 <br />1 <br />36 <br />CHECK AND VERIFY ALL DIMENSIONS <br />BEFORE PROCEEDING WITH THE <br />WORK. REPORT DISCREPANCIES <br />TO THE ENGINEER. ALL CONSTRUCTION <br />SHALL CONFORM TO THE C.B.C. <br />DESIGNER: <br />PROJECT: <br />SA <br />I <br />N <br />T <br /> <br />A <br />N <br />N <br />E <br /> <br /> <br />R <br />E <br />S <br />I <br />D <br />E <br />N <br />C <br />E <br />A. <br />D <br />. <br />U <br />. <br />15 <br />2 <br />9 <br /> <br />W <br /> <br />S <br />A <br />I <br />N <br />T <br /> <br />A <br />N <br />N <br />E <br /> <br />P <br />L <br />. <br /> <br />U <br />N <br />I <br />T <br /> <br />2 <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />A <br />D <br />D <br />R <br />E <br />S <br />S <br />: <br />MARK DATE REVISION <br />TITLE: <br />SHEET NUMBER <br />OF SHEETS <br />JOB NO. <br /> 24-410 <br />DRAWN: <br /> GH <br />CHEKED: <br /> GH <br />DATE: <br />FEB 12 25 <br />7-19-25 <br />A2.3 <br />SCALE: 1/4" = 1'-0"1 <br />SOUTH ELEVATION WITH <br />WALL <br />SCALE:2 FRONT WALL <br />FRONT <br />WALL 3D