Laserfiche WebLink
Project No.: 2157-S <br />1433 Cypress Ave, Santa Ana <br />Grading shall commence with the removal of all existing vegetation and exi <br />from the area to be graded. Wood, roots, asphalt, concrete and other debris sha <br />CITY OF SANTA ANA <br />Planrpggend Building Agency <br />7 <br />Approved <br />ncF6RpRMWISSUANCE <br />be exported from <br />the site and shall not be mixed with the fill soils. All existing underground improv runts ���nned for <br />aste <br />removal shall be completely excavated and the resulting depressions shall be pr p kW: backfilled in <br />accordance with the procedures described herein. <br />During the rainy season between November 1 and April 15, excavated areas shall be protected <br />from rainwater. Temporary provisions should be made to adequately direct surface runoff to the <br />street. <br />8.5.1 Fill Placement <br />All new fill shall be brought to near optimum moisture, placed in layers not exceeding 8 inches <br />thick, and compacted to at least 90 percent of the maximum laboratory density. Compaction <br />characteristics of all fill soils shall be determined by ASTM D-1557 standard. The field density and <br />degree of compaction shall be determined by ASTM D-1556, or by other ASTM standard methods <br />that are acceptable to the governing public agency. Field density tests should be taken at every <br />two vertical feet or for every 500 cubic yards of fill placed, whichever is more restrictive. <br />8.6 Drainage <br />Impervious surfaces within 10 feet of the building foundation shall be sloped a minimum of 2 <br />percent away from the building. If physical obstructions or lot lines prohibit 10 feet of horizontal <br />distance, 2-percent swales shall be provided to divert water away from the foundations. <br />It is important that drainage patterns established at the time of fine -grading are maintained <br />throughout the life of the structures. Property owners should be aware that improperly designed <br />and maintained irrigation systems for landscaping may cause distress to the foundation system <br />and cracking of concrete slabs. <br />Where slabs or pavement are not feasible adjacent to the buildings, the ground surface should be <br />provided with a minimum gradient of 5 percent away from the structures. <br />PACIFIC GEOTECH, INC. <br />