My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1425 W River Ln - Plan
PBA
>
Building
>
ProjectDox
>
R
>
River Ln
>
1425 W River Ln
>
1425 W River Ln - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:18 AM
Creation date
2/13/2026 5:01:13 AM
Metadata
Fields
Template:
Plan
Permit Number
20186400
101124334
Full Address
1425 W River Ln
Street Number
1425
Street Direction
W
Street Name
River
Street Suffix
Ln
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />no M N <br />MECHANICAL LOAD TEST 21 <br />on t jYS1EM CEItT1FICAEION ,PAGE <br />The NXT UMOUNT system has been certified and Listed to the UL 2703 standard (Rack Mounting Systems and Clamping Devices for Flat -Plate Photovoltaic Modules <br />and PaneLs).This standard included electrical grounding, electrical bonding, mechanical load and fire resistance testing. <br />SYSTEM LEVEL FIRE CLASSIFICATION <br />The system fire class rating requires installation in the manner specified in the NXT UMOUNT Installation Guide. NXT UMOUNT has been classified to the system level <br />fire portion of UL 2703. NXT UMOUNT has achieved system level performance for steep sloped roofs and Low sloped roofs. System Level fire performance is inherent <br />in the NXT UMOUNT design, and no additional mitigation measures are required. See table below for definition of steep sloped and low sloped roofs.The system is to <br />be mounted over fire resistant roof covering rated for the application. There is no required minimum or maximum height Limitation above the roof deck to maintain <br />the system fire rating for NXT UMOUNT Approved Module Types & System Level Fire Ratings are listed below: <br />Roof Type <br />Module Type <br />System Level Fire Rating <br />Rail Direction <br />Module Orientation <br />Steep Slope - roof pitches 3 2 in/ft <br />Type 1, 2,3 with metal frame, 30 with <br />metal frame, 19,22,25,29, & 30 <br />Class A <br />Parallel OR Perpendicular to Ridge <br />Landscape OR Portrait <br />Low Slope - roof pitches < 2in/ft <br />Type 1, 2, 29, & 30 <br />MECHANICAL LOAD TEST MODULES <br />The modules selected for UL 2703 mechanical Load testing were selected to represent the broadest range possible for modules on the market. The tests performed <br />covers module frame thicknesses greater than or equal to 1.0 mm, single and double wall frame profiles (some complex frame profiles could require further analysis to <br />determine applicability), and clear and dark anodized aluminum frames. PV modules may have a reduced load rating, independent of the NXT UMOUNT rating. Please <br />consult the PV module manufacturer's installation guide for more information. <br />Tested Module <br />Design Load Ratings <br />Tested Loads <br />Tested Module Area <br />SunPower SPR-A440 -COM <br />Down: 50 psf, Up: 50 psf, Slope:15 psf <br />Down: 75 psf, Up: 75 psf, Slope: 23 psf <br />21.86 sq ft <br />Jinko JKM-xxxM 72HL4-V <br />Down: 39.47 psf, Up: 22.28 psf, Slope: 8 psf <br />Down: 59.20 psf, Up: 33.42 psf, Slope:12 psf <br />27.76 sq ft <br />0 Cells 0 Peak Duo XL-G11.3/BFG <br />Down: 37.06 psf, Up: 20.97 psf, Slope: 7.53 psf <br />Down: 55.60 psf, Up: 31.46 psf, Slope:11.3 psf <br />29.49 sq ft <br />OPEAK.DUO XL-G11S.3/BFG580 <br />Down: 36.50 psf, Up:20.96 psf, Slope: 7.6 psf <br />Down: 54.80 psf, Up:31.45 psf, Slope:11.4 psf <br />30.05 sq ft <br />nowCOMBO CLAMP INSTALLATION; 201 <br />■■__[3D))_U_M_0_U_NT INSTALLATION -GUIDE-:- PAGE <br />INSTALL COMBO (END) CLAMPS: <br />Install Combo Clamps starting at the aligned end of <br />rails. <br />L \. <br />i <br />INSTALL COMBO (MID) CLAMPS: <br />Clamp assemblies may be positioned in rail near <br />point of use prior to module placement. <br />Note: The clamps maybe installed above splice <br />locations. <br />PRO TIP <br />Press the clamp assembly slightly into the rail to <br />allow for easy sliding of clamp in the rail. <br />OF <br />O <br />3'mlr <br />INSERT COMBO CLAMP: INSTALL END MODULE: Position first module onto rails <br />Insert Combo Clamp from one side of and engage module frame with end clamps. Hold clamp <br />the rail nut into the rail and click in in place against module while tightening bolt. <br />the other side. Ensure that the rail nut TORQUE VALUE: 15 ft-Lbs. <br />profile is seated in the rail profile. Note: Ensure a minimum distance of 1" from the end of <br />the module to end of rail. <br />FO <br />PLACE ADJACENT MODULE AGAINST INSTALL REMAINING MODULES: <br />CLAMPS: Proceed with module installation. Engage each clamp <br />Modules must be tight against clamps with previously positioned module. <br />with no gaps. Tighten bolt to required <br />torque. Note: Combo clamps are capable of securing module <br />frames whose thickness varies from 30mm to 40mm. <br />TORQUE VALUE:15 ft-Lbs. <br />SYSTEM GROUNDING; <br />lit )) UMOUNT <br />■■ 1 IIVS1AELA1IC1N GUIDE: PAGE <br />-------------------------------------------------------------------------------------------------------------------------------------- <br />O 0 0 0 <br />SYSTEM GROUNDING: Rails can be bonded using a MLPE & GROUNDING LUG <br />(NULGMLP3), GROUND WEEBLUG #1 or ILSCO LAY IN LUG (GBL4DBT).At least <br />one rail per row of modules in an array must be bonded to electrical ground. <br />Each additional row of modules must be grounded with at Least one rail lug <br />per row or with a row -to -row bonding devise listed here. <br />Note: See Page 5 for additional lugs required for expansion joints. <br />SYSTEM GROUNDING WITH MLPE & GROUNDING LUG: Insert the T-nut in the <br />rail by holding the plastic cone's tabs with thumb and middle finger. Rotate the <br />clamp 90 deg in clockwise direction in the rail and release when aligned with <br />rail. Ensure that the T-nut is engaged in the rail profile. Place the grounding wire <br />on the grounding plate on one of the sides of the bolt, parallel to the grounding <br />plate flanges.Tighten bolt. <br />TORQUE VALUE: 6-12 AWG SOLID COPPER: 10 ft Lbs <br />NOTE: MLPE & GROUNDING LUG is single use only <br />�.• <br />0 <br />®� <br />ALTERNATE SYSTEM GROUNDING WITH ILSCO LAY -IN LUG - UNIRAC P/N <br />008009P: Alternate Grounding Lug. Drill hole in rail 7/32• in diameter, deburr - <br />hole and bolt through one wall of rail <br />BOLT TOROUE VALUE: 5 ft lbs. ALTERNATE ROW GROUNDING WITH ALTERNATE ROW GROUNDING WITH N/S <br />TERMINAL TORQUE: 4-6 AWG: 35in-Lbs, 8 AWG: 25 in-tbs. N/S BONDING CLAMP: BONDING CLIP: <br />Insert clamp between module rows and Fully seat bonding clip on each module <br />tighten bolt. flange to provide bond across N/S <br />module gap. <br />Ensure Copper does contact Aluminum to avoid corrosion. vituu-<vLOt:r a-lo: <br />on: BONDING CONNECTIONS & GROUNDING PATHS ; <br />••w: 3 M NT <br />■■ ------ l INSTALLATION -GUIDE-:- PAGE <br />Mo �' <br />Ca.O. <br />© RAIL <br />/Br <br />had a�P��9 <br />ka <br />I'rigo'y�r. <br />her nd� <br />°wa�a 9 <br />BONDING COMBO MID -END CLAMP ASSEMBLY <br />0 Aluminum combo mid -end clamp cap with stainless steel bonding pins that pierce <br />module frame anodization to bond module to module through clamp <br />0 Stainless steel bolt bonds aluminum clamp to stainless steel Hex bolt <br />© Aluminum combo mid -end clamp rail nut with stainless steel bonding pins that <br />pierce rail anodization to bond module to module through clamp <br />NOTE: See Page 20 for installation details. <br />MODULE <br />FRAME <br />_� p <br />BONDING BETWEEN THERMAL BREAKS <br />0 Lug is connected at the end of each thermal break <br />to the rail. <br />© Solid copper wire is connected across the gap to <br />bond the two ends. <br />NOTE: See Page 5 for installation details. <br />/i <br />BONDING RAIL SPLICE <br />Q Bonding Hardware creates bond between Splice bar and <br />each rail section. <br />Q Aluminum splice bar spans across rail gap to create rail <br />to rail bond. Rail on at least one side of splice will be <br />grounded. <br />NOTE: <br />• See Page 16 for installation details <br />• Splice certified for single -use only <br />RACK SYSTEM GROUNDING <br />© Tabs on the grounding plate pierce anodization on the rail to bond rail to ground wire. <br />© Solid copper wire connected to lug is routed to provide final system ground connection. <br />NOTE: See Page 17 for installation details and alternate racking system grounding methods. <br />Planning and Building Agen <br />C MII=�r0Wp�CR <br />EMPC7QRWRT94OLAR <br />FOR PORMI'MSUANCI <br />CLOVIS. CA 93611 <br />TEL: (800) 306 6953 <br />CSLB:1057693 <br />Email - permits@mpwrsolar.com <br />Master ID: <br />10 #1057693 <br />Scott Forster <br />VERSION <br />DESCRIPTION I DATE I REV <br />I INITIAL RELEASE 105122/2025 I UR I <br />PROJECT NAME <br />Z <br />O <br />U) <br />Fn <br />coW <br />< <br />=zoo <br />Q � N — N <br />Ill LLJ O) J M <br />_ > Q Q LJJ N <br />_ U Z U) CD <br />l—�QIY--.. <br />Z L LI <br />ZNQ= a- <br />Z � Q Z Q <br />V Z O <br />Q l) <br />GO <br />J_ <br />SHEET NAME <br />SPEC SHEETS <br />SHEET SIZE <br />ANSI B <br />11" X 17" <br />SHEET NUMBER <br />PV-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.