CITY OF SANTA ANA
<br />GENERAL NOTES'
<br />FRAMING NOTES:
<br />1.
<br />"Code" where referred to herein refers to 2022 CBC.
<br />1. Roof sheathing to
<br />be 1/2" CDX plywood or OSB (INDEX 24/0) with
<br />2.
<br />All work shall conform to the requirements of the code.
<br />8d common nail atl 6„ O.C. in boundary,
<br />3.
<br />All materials and workmanship shall conform to the drawing and specifications.
<br />„
<br />12 O.C. in intermediated (field),
<br />4.
<br />The contractor shall be responsible for the safety of the building during
<br />construction and shall provide adequate shoring, bracing and guide during
<br />2. Floor sheathing to
<br />be 5/8" CDT & G plywood or OSB (INDEX 32/16)
<br />construction. Safety and bracing requirements shall be in accordance with all
<br />National State and Local safety ordinances.
<br />with 10d common
<br />nail at: 6" O.C. in boundary,
<br />5.
<br />The contractor shall be responsible for coordinating the work of all trades and
<br />10 O.C.in intermediated (field),
<br />shall check all dimensions.
<br />6.
<br />See mechanical, plumbing and electrical drawing for size and location of all
<br />3. Wood diaphragm to be inspected and approved by Building
<br />openings required for ducts, pipes and for all pipe sleeves, electrical conduits
<br />Department prior to covering.
<br />and other items to be embedded in concrete or otherwise incorporated in
<br />4. See detail 5/S-1
<br />for typical wall sheathing detail.
<br />t t I k
<br />5 S d t 'I 4/S-1
<br />f t I d' h d t 'I d t
<br />STUDS
<br />MAX. UNSUPPORTED HEIGHT*
<br />BEAR'G WALL
<br />NON BAR'G WALL
<br />2 X 4 @ 16"
<br />10'-0"
<br />14'-0"
<br />2 X 6 @ 16"
<br />14'-0"
<br />20'-0"
<br />2 X 8 @ 16"
<br />18'-0"
<br />24'-0"
<br />s rue ura wor
<br />ee e al or yplca lap ragm e al an no es.
<br />7. In all cases where a conflict may occur, such as between items covered in
<br />6.
<br />See detail on framing plan for shear wall indicated by 0
<br />* MAX. DISTANCE BETWEEN FLOOR & ROOF.
<br />specifications and notes on the drawings or between general notes and specific
<br />7.
<br />See shear wall 0 denote full length and full height of the walls.
<br />details, the Architect shall be notified and he will interpret the intent of the
<br />8•
<br />Structural observation will be performed when required by the Building Official.
<br />2X STUDS @ 16"❑,C, U.N.O.
<br />contract documents.
<br />9.
<br />A certificate of compliance will be provided for the laminated beams.
<br />8. Where construction materials are temporarily stored on roof or floor framing,
<br />10.
<br />The max. depth of notching shall not exceed 1/6 the depth of the member,
<br />16d @ 12"❑,C, TYP.
<br />they shall be distributed so that the load does not exceed the design live load.
<br />and shall not be located in the middle 1/3 of the span.
<br />NOTE:
<br />WOOD FRAMING:
<br />of thespan.
<br />SEE PLAN FOR L❑CATI❑N
<br />1.1 All Douglas -Fir Larch shall comply with DOC PS20 standards.
<br />11.
<br />The meax. depth of notching shall not exceed 1/4 the depth at end of spans.
<br />OF PLYWOOD SHEATH'G
<br />1. All horizontal load carrying members and posts to be Douglas Fir Larch north.
<br />a. 2x grade No. 2 typical U.N.O.
<br />12.
<br />13.
<br />Provide solid 2x blocking under partitions perpendicular to floor joist
<br />Provide double joist under parallel bearing partitions
<br />16d @ 12"
<br />O.C.
<br />b. 4x, 6x grade No. 1 typical U.N.O.
<br />14.
<br />Roof sheathing requires nailing inspection
<br />before covered.
<br />C. post grade NO. 1 typical U.N.O.
<br />15.
<br />Holdown shall be tight before covered plywood sheathing.
<br />2. Studs, plates, sills and blocking to be grade #2 Douglas Fir or better.
<br />16.
<br />2-layer #15 black paper covered plywood
<br />sheathing for shear wall.
<br />3. Sills under stud partitions in contact with Concrete shall pressure treated
<br />17.
<br />Stucco lath& drywall shall be nailed to all
<br />studs & to top & bottom PL.
<br />Douglas Fir bolted to concrete with 5/8" x10" anchor bolts spaced not more
<br />18.
<br />roof plywd shall be bond w/ INT. & EXT.
<br />glue & be of EXT. type where
<br />than 4'-0" O.0 unless noted otherwise, there shall be one bolt within 9" of each
<br />exposed to weather.
<br />end of each sill piece. Minimum of 2 bolts per piece.
<br />FOUNDATION NOTES:
<br />WOOD
<br />T T �
<br />STUD
<br />SCHEDULE
<br />4. The bridging shall be provided as per code.
<br />1. For floor dimension, curbs, under floor ducts, conduits, etc.
<br />11
<br />►J lJ
<br />5. A.B into wood framing require 3X3XO.229" plate washers
<br />2. Verify all conditions in field.
<br />6 Framin members shall not be notched in any manner exce t where s ecificall
<br />3 See detail on Ian/S-1 for shear wall indicated b
<br />NAILING SCHEDULE
<br />(CBC 2022 TABLE 2304.10.2
<br />9 P P Y
<br />detailed or approved by the Architect.
<br />7. Minimum nailing for all wood members shall be as per code unless specifically
<br />noted.
<br />4.
<br />5.
<br />P Y
<br />See detail 1/S-1 for typical slab on grade, control joints, and slab
<br />depression details.
<br />Shear waIISO denote full length and full height of the wall
<br />or hip rafters; or roof rafter
<br />to 2" ridge beam
<br />3-10d box
<br />3-3"xO.131" nails
<br />3-3" 14 gage staples, 7/16" crown
<br />3-10d common
<br />3-16d box
<br />4-lOdbox
<br />4-3"xO.131" nails
<br />4-3" 14 gage staples,?/16" crown
<br />8. Structural plywood shall be DEPA grade, Structural CDX, thickness as noted on
<br />plans with exterior glue conforming to product DOS PS1 or PS2. Each sheet
<br />shall be identified by a registered stamp or brand.
<br />9. Edges of all openings through roof or floor shall be nailed per boundary of
<br />plywood diaphragm nailing requirements.
<br />10. All wood bearing on concrete or masonry shall be pressure treated Douglas Fir.
<br />11. All wood framing Max. moisture content to be 19%.
<br />12. Joist hangers and other connectors shall be Simpson strong ties or equal.
<br />6. Anchor bolts are 5/8"0 ©32"O.0 with galvanized plate washer 3"x3"xO.229". A
<br />bolts shall be 12" at each end with 7" Min. embeddment©6' o.c TYP.
<br />7. All Holdown hardware, anchor bolts & rebars to be secured in place prior to
<br />call for inspection.
<br />8. Saturate the soil 18" deep before placeing the concrete slab.
<br />9. Grading & footing to be inspected & certified by the soil engineer prior to
<br />pouring the concrete.
<br />P 9
<br />10. Fasteners in preservative treated wood or fire retardant treated wood shall b
<br />hot dipped zinc coated galvanized steel or stainless steel. in accordance w/ASTV
<br />CONCRETE:
<br />hor
<br />WALL
<br />8.
<br />of
<br />A153
<br />Stud to Stud (not at braced
<br />wall panels)
<br />16d common
<br />10 d box
<br />3"xO.131" nails
<br />STRUCTURAL GLUE LAMINATED TIMBER:
<br />1.
<br />Cement: Type V conforming to A.S.T.M. C-150 C.B.C.
<br />3" 14 gage sta les, 7/16" crown
<br />9.
<br />Stud to stud and abutting
<br />studs at in tersecting wall
<br />corners (at braced wall
<br />panels)
<br />16d common
<br />1. Materials, manufacture and quality control shall be in conformance with 2. All concrete unless otherwise noted on plans will be regular weight hard rock
<br />commercial standard, CS-253, "Structural Glued Laminated Timber". type (150 1 b/cu.ft.). Aggregate shall conform to A.S.T.M. C-33 with proven
<br />2. Glued laminated beams shall be combination 24F-V8, Douglas Fir and Larch per shrinkage characteristics of less than 0.04% as per A.S.T.M. C-157.
<br />AITC 117 or combination 24F-V8 with hem fir lamination per AITC. 3. Strengths: Ultimate compressive strength at 28 days F'c=2500 psi.ACI 318-19
<br />16d box
<br />3"0.131" nails
<br />3. All structural glued laminated timber shall be inspected during lamination by an
<br />4.
<br />Maximum slump of concrete used in floor slab at flat work shall be four(4)
<br />1
<br />3" 14 gage staples, 7/16" crown
<br />approved inspection agency. A certificate of inspection shall be provided for the
<br />inches.
<br />10.
<br />Built-up header
<br />16d common
<br />16d box
<br />Architect & building department prior to erection. 5. Vibration: Vibration of concrete shall be in accordance with the general
<br />4. Each glued laminated beam shall be stamped with identification number and
<br />shall be accompanied b a Certificate of Inspection.
<br />P Y P
<br />5. The glued laminated beams shall be furnished by a licensed fabricator
<br />specializing in this type of work. The fabricator shall submit complete shop
<br />drawings to the Architect for approval prior to fabrication.
<br />6.
<br />7.
<br />provisions outlined in Portland Cement Association Spec. ST26.
<br />Curing: Concrete shall be maintained in a moist condition for minimum of
<br />five days after its placement. Approved curing compounds may be used in
<br />lieu of moist curing.
<br />Strength tests of concrete shall be required as per code and as outlined in
<br />11 •
<br />Continuous header to stud
<br />4-8d common
<br />4-10d box
<br />12.
<br />Top plate to top plate
<br />16d common
<br />IOd box
<br />3"xO.131" nails
<br />Anchorrage:
<br />specification reports to be forward to the structural engineer.
<br />1 1
<br />3" 14 gage staples, 7/16" crown
<br />13.
<br />Top plate to top plate, at
<br />end joints
<br />8-16d common
<br />12-lOd box
<br />12-3" " nails
<br />a e staples, 7/16" crown
<br />1144 gage
<br />1.Min. Two bolts per piece of sill plate and one located within 12-inch and
<br />not less than 7 bolt diameter or 4 inch of each end of each sill plate.
<br />2.Min. of 5/8" diameter A.B. embeded 7 inch into footing and spaced not
<br />more than 6' on center for one-story buildings or 4 feet on center two-story buildings.
<br />3. 3"x3"XO.229" plate washer shall be used on each A.B.
<br />4.all anchor bolts and holdowns shall be tied in place prior to foundation inspection.
<br />8. Anchor bolts, dowels, inserts, etc. shall be securely tied in place prior to
<br />foundation inspection.
<br />9. Location of construction and pour joints shall be approved by the Architect
<br />pouring concrete.
<br />10. Continuous inspection required for concrete F'c greater than 2500 psi.
<br />SOIL INFO.:
<br />1. The foundation designed is based on the recommendations by CBC 2022 TABLE
<br />14.
<br />Bottom plate to joist, rim
<br />joist, band joist or blocking
<br />(not at braced wall panels)
<br />166dd common
<br />16d box
<br />3"0.131" nails
<br />WIND & EARTHQUAKE & DESIGN DATA: g, SEISMIC DESIGN CATEGORY D
<br />1. BASIC WIIND SPEED=110 MPH
<br />2. WIND IMPORTANCE FACTOR I=1.0, RISK CATEGORY II 9. BASIC SEISMIC -FORCE -RESISTING
<br />3. WIND EXPOSURE=C SYSTEM: WOOD SHEAR WALL SYSTEM
<br />4. ROOF DL=14 PSF, ROOF LL=20 PSF, 10. DESIGN BASE SHEAR: V=Cs*Wt
<br />4.1 FLOOR DL=14 PSF, FLOOR LL=40 PSF, 11. SEISMIC RESPONSE COEFFIENT: Cs=0.261
<br />5. MAPPED SPECTRAL RESPONSE ACCELERATIONS 12. RESPONSE MODIFICATION FACTOR: R=6.5
<br />Ss=2.54, S1=0.848 13. ANALYSIS PROCEDURE USED: LATERAL DESIGN
<br />6. SITE CLASS E 14. REDANDUNCY FACTOR Rho=1.3
<br />7. SPECTRAL RESPONSE COEFFIENTS,
<br />Sds=1.693, Shc=0.848
<br />2.
<br />3.
<br />4.
<br />1806.2
<br />The soil bearing value used for design of footing upon undisturbed soils and
<br />24" below lowest finished grade is: 1500 PSF for spread footings, 1500 PSF
<br />for continuous footings.
<br />Soil engineer must inspect and approve footing excavation prior to placing
<br />rebars and approval to be provided to the building inspector before City
<br />PP P g P Y
<br />approval of foundation.
<br />90% min. compaction under new foundation.
<br />3" 14 gage staples, 7/16" crown
<br />15.
<br />Bottom plate to joist, rim
<br />joist, band joist or blocking
<br />at braced wall panels
<br />2-16d common
<br />3-16d box
<br />4-3"x0.131" nails
<br />4-3" 14 gage staples, 7/16" crown
<br />16.
<br />Stud to top or bottom plate
<br />4-8d common
<br />4-10d box
<br />4-3"x0.131" nails
<br />4-3" 14 a e sta les, 7/16" crown
<br />Orange County
<br />DEPARTMENT OF PUBLIC WORKS
<br />BUILDING & SAFETY DIVISION
<br />REINFORCING STEEL:
<br />1. a. All reinforced steel to conform to A.S.T.M. specification A615 Grade 60 b
<br />unless noted otherwise on plans.
<br />. Deformations shall be in accordance with A.S.T.M. A615.
<br />2. Unless otherwise noted, all reinforcing steel shall be lapped 36 bar diameter
<br />or 2'-0" minimum whichever governs. All splices shall be located as
<br />2-16d common
<br />3-lOd box
<br />3-3"x0.131" nails
<br />3-3" 14 gage staples, 7/16" crown
<br />17.
<br />Top or bottom plate to stud
<br />2-16d common
<br />3-10d box
<br />detailed on plans.
<br />3-3"0.131" nails
<br />3.
<br />certification and testing of reinforcing steel shall be in accordance with the
<br />3-3" 14 gage staples, 7/16" crown
<br />STRUCTURAL OBSERVATION PROGRAM
<br />provision of A.S.T.M. standards.
<br />18.
<br />Top plates, laps at corners
<br />2-16d common
<br />AND DESIGNATION OF THE
<br />4.
<br />All reinforcing steel shall be supported and tied in conformance with the
<br />latest edition of "The manual of Reinforcing Steel Practice for Reinforced
<br />and intersections
<br />3-10d box
<br />3-3"0.131" nails
<br />STRUCTURAL OBSERVER
<br />PERMIT APPL. NO.:
<br />Project Address:
<br />5.
<br />Concrete Structures".
<br />Provide the following minimum protective covering of concrete unless
<br />otherwise noted: Deposited against earth 3" clear
<br />In contact with earth (formed) 2" clear
<br />SPECIAL fNSPECTION PROGRAM
<br />3-3" 14 gage staples, 7/16" crown
<br />19.
<br />1" brace to each stud and
<br />plate
<br />2-8d common
<br />2-10d box
<br />2-3"0.131" nails
<br />2-3 14 gage staples, 7/16 crown
<br />20.
<br />1"x6" sheathing to each
<br />2-8d common
<br />Description of Work: House addition
<br />This form to be attached to the construction plans prior to permit approval
<br />bearing
<br />2-10d box
<br />21
<br />1" 8" and wider sheathin
<br />3-8d common
<br />Owner: Architect:
<br />Engineer of Record:
<br />STRUCTURAL OBSERVATION (ONLY CHECKED ITEMS ARE REQUIRED)
<br />Firm or Individual to be responsible for the Structural Observation:
<br />Name: Dacheng David Li Phone: 626 288-1216 Calif. Registration: C 58075
<br />FOUNDATION WALL FRAME DIAPHRAGM
<br />❑ Footing, Stem Walls, Piers ❑ Concrete ❑ Steel Moment Frame ❑ Concrete
<br />❑ Mat Foundation ❑ Masonry ❑ Steel Braced Frame ❑ Steel Deck
<br />❑ Caisson, Piles, ❑ Wood ❑ Concrete Moment ❑ Wood
<br />Grade Beams Frame
<br />❑ Retaining Foundation ❑ Others: ❑ Masonry Wall Frame ❑ Others:
<br />Hillside Special Anchors
<br />❑ Others: ❑ Others:
<br />DECLARATION BY OWNER
<br />I, the Owner of the project, declare that the above listed firm or individual is hired by me to be the Structural
<br />Observer.
<br />Signature Date
<br />DECLARATION BY ARCHITECT OR ENGINEER OF RECORD
<br />(required if the Structural Observer is different from the Architect or Engineer of Record)
<br />I, the Architect or Engineer of record for the project, declare that the above listed firm or individual is designated by
<br />me to be responsible for the Structural Observation.
<br />Signature License No. Date
<br />ITEMS
<br />DESCRIPTION
<br />individuals/Finns*to
<br />(only checked items are required)
<br />(only checked items are required)
<br />perform S. I.
<br />El Concrete
<br />❑AIIConcrete ❑Allexcept
<br />❑ Test:_ per_c.y.; _@ 7 days, _@ 28 days, _hold.
<br />❑ Bolts installed in Concrete
<br />U Bolts in existing Concrete/masonry O bolts in shear walls
<br />❑ Special Moment -Resisting
<br />❑ Location as indicated El All concrete frames
<br />Concrete Frame
<br />❑
<br />El Test:_ per c.y.; �_ 7 days, @ 28 days, _hold.
<br />❑ Reinforcing steel and
<br />❑ Stressing and grouting of tendons
<br />Pre -stressing Tendons
<br />Steel placement: ❑ Periodic Inspection ❑ Continuous Inspection
<br />❑ Structrual Welding
<br />❑ All Welding Except
<br />Periodic: ❑ Single pass fillet welds < I fi' ❑ Cladding Connection
<br />❑ Welded studs ❑ Cold formed studs ❑ Metal deck
<br />❑ Stairs&RailinEl Reinforcing steel
<br />V1DT: ❑ UT
<br />❑ Rg
<br />❑ MPT
<br />❑ PT
<br />❑ High -strength Bolting
<br />Snug tight: El All ❑ as indicated ❑
<br />Pretension: ❑ All ❑ as indicated ❑
<br />❑ Structrual Masonry
<br />❑ Working Stress Design ❑ full- ❑ half -stresses ❑ as indicated
<br />❑ Strength Design
<br />❑ Empirical Design fill- _psi
<br />TESTING: Before During ❑ Other Remarks
<br />Prisms ❑ ❑
<br />Grout ❑ ❑
<br />Mortar ❑ ❑
<br />Units ❑ ❑
<br />❑ Piling, Drilled piers and
<br />❑ Inspection by Geotechnical Engineer in addition to S. 1.
<br />Caissons
<br />❑ Load testing
<br />Driving ❑ Continuous Inspection ❑ Periodic Inspection
<br />Driving ❑ Continuous Inspection ❑ Periodic Inspection
<br />❑ Shotcrete
<br />❑ Pre -construction panel testing
<br />❑ In -place cores testing
<br />® Others
<br />® Epoxy holdown and anchorage system (periodic.
<br />® SW AND SSW Wall (periodic).
<br />g
<br />to each bearing
<br />3-10d box
<br />FLOOR
<br />22.
<br />Joist to sill, top plate, or
<br />3-8d common
<br />girder
<br />3-10d box
<br />3-3"0.131" nails
<br />3-3" 14 gage staples, 7/16" crown
<br />23.
<br />Rim joist, band joist, or
<br />8d common
<br />blocking to top plate, sill or
<br />10d box
<br />other framing below
<br />3"0.131" nails
<br />3" 14 gage staples, 7/16" crown
<br />24.
<br />1 "x6" subfloor or less to
<br />2-8d common
<br />eachjoist
<br />2-10d box
<br />25.
<br />2" subfloor to joist or
<br />2-16d common
<br />girder
<br />26.
<br />2" plank
<br />2-16d common
<br />27.
<br />Built up girders and beams,
<br />20d common
<br />2" lumber layers
<br />8. Ledger strip supporting
<br />joists or rafters
<br />9. Joist to band joist or rim
<br />joist
<br />0. Bridging or blocking to
<br />10d box
<br />3"xO.131" nails
<br />3" 14 gage staples, 7/16" crown
<br />And
<br />2-20d common
<br />3-10d box
<br />3-3"0.131" nails
<br />3-3" 14 gage staples, 7/16" crown
<br />3-16d common
<br />4-10d box
<br />4-3"0.131" nails
<br />4-3" 14 gage staples, 7/16" crown
<br />3-16d common
<br />4-10d box
<br />4-3"xO.131" nails
<br />4-3" 14 gage staples, 7/16" crown
<br />2-8d common
<br />Toenail
<br />24" o.c. face nail
<br />16" o.c. face nail
<br />3
<br />16" o.c. face nail
<br />12" o.c. face nail
<br />12" o.c. face nail
<br />16" o.c. each edge, face nail
<br />12" o.c. each edge, face nail
<br />Toenail
<br />16" o.c. face nail
<br />12" o.c. face nail
<br />3"0.131" nails
<br />Each side of end joint, face
<br />nail (min 24" lap splice
<br />Iength each side of end
<br />joint)
<br />16" o.c. face nail
<br />12" o.c. face nail
<br />16" o.c. face nail
<br />Toenail
<br />End nail
<br />Face nail
<br />Face nail
<br />Face nail
<br />Face nail
<br />11
<br />6" o.c., toenail
<br />Face nail
<br />Face nail
<br />Each bearing, face nail
<br />32" o.c. face nail at top and
<br />bottom staggered on
<br />opposite sides
<br />24" o.c. face nail at top and
<br />bottom staggered on
<br />opposite sides
<br />Ends and at each splice,
<br />face nail
<br />Each joist or rafter, face nail
<br />End nail
<br />Each end, toenail
<br />'LYW❑❑D SHEATH'G
<br />2X6 @ 16' D.C.-
<br />2X FULL WIDTH -
<br />NAILER W/ 2-16d
<br />NAIL EA. RAFTER
<br />I� B.N. 1
<br />PLYWOOD SHEATH'(
<br />2X RAFTER`
<br />@ 16' ❑.C.
<br />B
<br />TS
<br />U
<br />ti
<br />c
<br />M.B.@24" O.C.
<br />STAGG. TYP.
<br />A
<br />SPLICE AT LOWER PLATE
<br />20-16d EA. 16d @ 16'❑,C,
<br />SIDE OF
<br />SPLICE
<br />PR❑VIDE STUD BELOW
<br />SPLICES
<br />PLYWD. AS NOTED
<br />STUD @ 16' O.C.
<br />U,N.O.
<br />2-2X EXCEPT AS -�
<br />NOTED ON FOURPLAN
<br />EDGE NAIL'G -
<br />BOUNDARY
<br />NAILING
<br />STAGGERED PLYWD.
<br />SPLICES
<br />2X BL❑CKING
<br />TOP OF CONC.
<br />SEE SHEAR WALL
<br />SCHER FOR A.B.
<br />N❑TE1
<br />WHERE PLYWD. OCCUR @ EA. SIDE STAGG. PANEL J❑INT.
<br />NAI
<br />0.
<br />20-16cl EA.
<br />SIDE OF
<br />SPLICE
<br />NAIL @ 12' O.C.
<br />INTERM NAILING
<br />#4X 3'-0' @ 16' D.C.
<br />SMOOTH DOWELS
<br />e' 's
<br />=11I=III=111= •' III=1I1=111=
<br />6
<br />If
<br />' �.. .•:p"ter• A M.. .r , •• ,,....
<br />III,,-III,,-III,-111,�,111.-1•II ,III, ,III„ �I I II ,
<br />TYP. 1 1/4' DEPTH SAWCUT OR SLAB REINF❑RC'G
<br />QUICK J❑IST @ 20'-0' EA. WHERE OCCURS
<br />WAY MAX, (GROUT FILL)
<br />4' C❑NC, LAB W/
<br />#4@16' o.c EA WAY
<br />10 MIL VISQUEEN 4'-1/2'GRAVEL
<br />.• e
<br />•:. •�p,-.�.'. �^.mac.
<br />- -
<br />4'SLAB REINF❑
<br />•r.. o; .o " . t
<br />y � ��� �• -III-III-III-I
<br />I I-1 I lT-I 111 2-#4 C❑NT, SL
<br />NOTE; WF
<br />2 SEE NOTE ON FOUNDATIONPLAN CONC. SLAB O N GRAD E WHERE SAND & VISQUEENEEN APPLY,
<br />rl /�I IAlrl rl\/
<br />TYPICAL WALL SHEATHING 5O
<br />ST6224 STTRIP
<br />EA. SIDEi
<br />BSIMPS❑N DTC
<br />v-@ 4'-0'❑.C.
<br />L- 2X J❑IST
<br />2X SILL PLATE
<br />W/16d NAIL 12-
<br />16'0,C,
<br />R,M, SEE PLAN Vj-%%� HIP SEE PLAN
<br />TE BLK'G
<br />- A35 EA
<br />SIDE CA
<br />4X4 K.P.
<br />A35 EA
<br />SIDE
<br />2-2X BM SEE PLAN L- 2X C.J. SEE PLAN
<br />SIMPS❑N DTC
<br />v-@ 4'-0'❑,C, 1
<br />2X J❑IST
<br />X STUDS
<br />2X SILL PLATE
<br />W/16d NAIL @ -
<br />16'0.C,
<br />--12X F.J. IAI
<br />x- ST 6224
<br />STRIP@EA
<br />SIDE
<br />4X4 K.P.
<br />H3 @ EA
<br />SIDE
<br />_ 2-2X STUDS
<br />@16' ❑.0
<br />I /-- 4X4 K.P. I
<br />HIP SEE PLAN A -A
<br />SIMPS❑N DTC
<br />@ 4'-0'❑,C,
<br />2X STUDS
<br />@ 16'0,C.
<br />2X P.T. SILL
<br />PLATE W/,138'
<br />�-2-2X F.J.
<br />0 HILTI X-C @ 8'
<br />ICC-ES ESR1663
<br />.a
<br />T-2X F.J.
<br />8
<br />HTER
<br />2X
<br />LG. BLK'G CLG, J❑IST
<br />❑IS
<br />2XDBL PLS,
<br />2XSTUDS
<br />2XLEDGER @ 16' O.C.
<br />w/2-16d
<br />@ EA. STUD
<br />CEILING J❑IST SCHEDULE
<br />CLG. J❑ISTS ARE DESIGNED FOR DRYWALL OR PLANT (D,L,=5 P.S.F. N,L,L,=10 P.S.F. )
<br />SIZE SPACING J❑IST SPAN ( MAX.) REMARKS
<br />2X4 12' O.C. 12'-0'
<br />16' ❑.C. 10'-0'
<br />12' ❑.C. 18'-0' THIS SCHEDULE APPLIES TO ALL
<br />2X6 RMS. U.N.O. ON PLANS SEE ARCH'L
<br />16, ❑.C. 16'-0' DRAWINGS FOR CLG. HEIGHT FIN.
<br />& SPECIFIC REQMTS,
<br />12' ❑.C. 24'-0'
<br />2X8
<br />16, ❑.C. 21'-0'
<br />2X10 12' ❑.C. 26'-0'
<br />16' ❑.C. 24'-0'
<br />CEILING JOISTS SCHEDULE("-..,
<br />FLOOR JOIST
<br />SEE PLAN FOR
<br />SIZE SPACING
<br />PLYWOOD SHT'G
<br />INTERM NAILING 8d®10" O.C.
<br />EDGE NAILING 10d®6" O.C.
<br />OF PLYWOOD FLOOR OPENINGS
<br />BE BOUND NAIL.
<br />LYWOOD SHT. SHALL SPAN
<br />THREE BEARINGS (MIN.)
<br />TYPICAL DIAPHRAGM 4
<br />5/8' MIN, EDGE
<br />DISTANCE TYP.
<br />ALL STUD
<br />NON BEARING STUDS
<br />2-2X6 TOP PL,
<br />1I I 2x6STUDS@16' ❑,C
<br />PLUMBINC�WAT WALLS DETAIL A
<br />-7
<br />40% MAX STUD 25% MAX. STUD
<br />WIDTH NOTCH WIDTH NOTCH
<br />60 % MAX. STUD
<br />WIDTH BORE
<br />5/8' MIN, EDGE
<br />DISTANCE TYP.
<br />ALL STUD
<br />40% MAX STUD
<br />WIDTH BORE
<br />EXT AND BEARING STUDS
<br />STUD WIDTH
<br />NOTE:
<br />1. NOTCH AND BORING NOT TO OCCUR
<br />IN SAME STUD SECTION
<br />2. NO MORE THEN 2 X SUCCESSIVE
<br />DBL. STUDS MAY HAVE 60% BORING
<br />HOLES.
<br />NOTCH / BORE
<br />2X4
<br />2X6
<br />25%
<br />7/8"
<br />1 3/8"
<br />40%
<br />1 3/8'
<br />2 1 /8"
<br />607o
<br />2"
<br />3 1 /4"
<br />1 ■
<br />TYP. NOTCHING & BORING
<br />SEE SCHEDULE
<br />U.N.O. ON PLANS
<br />2X TRIM
<br />W/16d @ 12'❑,C.
<br />HEADER
<br />OPEN
<br />3-16d NAILS
<br />FOR 2X TRIMMER
<br />(2-2X TRIMMER
<br />AT ❑PENING
<br />WIDER THAN
<br />6'-0')
<br />4-16d NAILS
<br />FOR 4X HDR•
<br />HEADER SCHEDULE
<br />SPAN ROOF AND CEILING FIRST FLOOR W/CEILING
<br />ONLY & ROOF
<br />4'-0' 4X4 4X6
<br />6'-0 4X8 4X10
<br />8'-0' 4X10 4X12
<br />10'-0 4X12 4X14 2-2X TRIM
<br />12' -0' 4X14 3 1/2X14 GLU LAM 2-2X TRIM
<br />TYPICAL HEADER
<br />101
<br />Building
<br />Ag
<br />rove
<br />IT ISSUNN
<br />Lam'
<br />'.4
<br />CD
<br />to rd
<br />r-,
<br />CV
<br />v
<br />O
<br />�
<br />W td � O
<br />CO
<br />���
<br />Q
<br />G 'd co
<br />o
<br />0 acc)O �U) OC\2
<br />r--t
<br />cn ko a) co 1
<br />0C) MN cd
<br />O CO O ..,
<br />�rcf
<br />Q�OFESSIp4,
<br />�4AG Dq�/0
<br />co �
<br />No. C058075
<br /><f'>gT�OFI
<br />AL\fO
<br />N MO
<br />Z N
<br />zIN=a
<br />O U
<br />I N
<br />a N Z
<br />a
<br />ova
<br />Co N Z
<br />oqqa
<br />Tom U)
<br />Date
<br />Scale
<br />Drawn
<br />Job: 25128
<br />Sheet
<br />sm I
<br />Of Sheet
<br />encY
<br />CE
<br />
|