Laserfiche WebLink
CITY OF SANTA ANA <br />GENERAL NOTES' <br />FRAMING NOTES: <br />1. <br />"Code" where referred to herein refers to 2022 CBC. <br />1. Roof sheathing to <br />be 1/2" CDX plywood or OSB (INDEX 24/0) with <br />2. <br />All work shall conform to the requirements of the code. <br />8d common nail atl 6„ O.C. in boundary, <br />3. <br />All materials and workmanship shall conform to the drawing and specifications. <br />„ <br />12 O.C. in intermediated (field), <br />4. <br />The contractor shall be responsible for the safety of the building during <br />construction and shall provide adequate shoring, bracing and guide during <br />2. Floor sheathing to <br />be 5/8" CDT & G plywood or OSB (INDEX 32/16) <br />construction. Safety and bracing requirements shall be in accordance with all <br />National State and Local safety ordinances. <br />with 10d common <br />nail at: 6" O.C. in boundary, <br />5. <br />The contractor shall be responsible for coordinating the work of all trades and <br />10 O.C.in intermediated (field), <br />shall check all dimensions. <br />6. <br />See mechanical, plumbing and electrical drawing for size and location of all <br />3. Wood diaphragm to be inspected and approved by Building <br />openings required for ducts, pipes and for all pipe sleeves, electrical conduits <br />Department prior to covering. <br />and other items to be embedded in concrete or otherwise incorporated in <br />4. See detail 5/S-1 <br />for typical wall sheathing detail. <br />t t I k <br />5 S d t 'I 4/S-1 <br />f t I d' h d t 'I d t <br />STUDS <br />MAX. UNSUPPORTED HEIGHT* <br />BEAR'G WALL <br />NON BAR'G WALL <br />2 X 4 @ 16" <br />10'-0" <br />14'-0" <br />2 X 6 @ 16" <br />14'-0" <br />20'-0" <br />2 X 8 @ 16" <br />18'-0" <br />24'-0" <br />s rue ura wor <br />ee e al or yplca lap ragm e al an no es. <br />7. In all cases where a conflict may occur, such as between items covered in <br />6. <br />See detail on framing plan for shear wall indicated by 0 <br />* MAX. DISTANCE BETWEEN FLOOR & ROOF. <br />specifications and notes on the drawings or between general notes and specific <br />7. <br />See shear wall 0 denote full length and full height of the walls. <br />details, the Architect shall be notified and he will interpret the intent of the <br />8• <br />Structural observation will be performed when required by the Building Official. <br />2X STUDS @ 16"❑,C, U.N.O. <br />contract documents. <br />9. <br />A certificate of compliance will be provided for the laminated beams. <br />8. Where construction materials are temporarily stored on roof or floor framing, <br />10. <br />The max. depth of notching shall not exceed 1/6 the depth of the member, <br />16d @ 12"❑,C, TYP. <br />they shall be distributed so that the load does not exceed the design live load. <br />and shall not be located in the middle 1/3 of the span. <br />NOTE: <br />WOOD FRAMING: <br />of thespan. <br />SEE PLAN FOR L❑CATI❑N <br />1.1 All Douglas -Fir Larch shall comply with DOC PS20 standards. <br />11. <br />The meax. depth of notching shall not exceed 1/4 the depth at end of spans. <br />OF PLYWOOD SHEATH'G <br />1. All horizontal load carrying members and posts to be Douglas Fir Larch north. <br />a. 2x grade No. 2 typical U.N.O. <br />12. <br />13. <br />Provide solid 2x blocking under partitions perpendicular to floor joist <br />Provide double joist under parallel bearing partitions <br />16d @ 12" <br />O.C. <br />b. 4x, 6x grade No. 1 typical U.N.O. <br />14. <br />Roof sheathing requires nailing inspection <br />before covered. <br />C. post grade NO. 1 typical U.N.O. <br />15. <br />Holdown shall be tight before covered plywood sheathing. <br />2. Studs, plates, sills and blocking to be grade #2 Douglas Fir or better. <br />16. <br />2-layer #15 black paper covered plywood <br />sheathing for shear wall. <br />3. Sills under stud partitions in contact with Concrete shall pressure treated <br />17. <br />Stucco lath& drywall shall be nailed to all <br />studs & to top & bottom PL. <br />Douglas Fir bolted to concrete with 5/8" x10" anchor bolts spaced not more <br />18. <br />roof plywd shall be bond w/ INT. & EXT. <br />glue & be of EXT. type where <br />than 4'-0" O.0 unless noted otherwise, there shall be one bolt within 9" of each <br />exposed to weather. <br />end of each sill piece. Minimum of 2 bolts per piece. <br />FOUNDATION NOTES: <br />WOOD <br />T T � <br />STUD <br />SCHEDULE <br />4. The bridging shall be provided as per code. <br />1. For floor dimension, curbs, under floor ducts, conduits, etc. <br />11 <br />►J lJ <br />5. A.B into wood framing require 3X3XO.229" plate washers <br />2. Verify all conditions in field. <br />6 Framin members shall not be notched in any manner exce t where s ecificall <br />3 See detail on Ian/S-1 for shear wall indicated b <br />NAILING SCHEDULE <br />(CBC 2022 TABLE 2304.10.2 <br />9 P P Y <br />detailed or approved by the Architect. <br />7. Minimum nailing for all wood members shall be as per code unless specifically <br />noted. <br />4. <br />5. <br />P Y <br />See detail 1/S-1 for typical slab on grade, control joints, and slab <br />depression details. <br />Shear waIISO denote full length and full height of the wall <br />or hip rafters; or roof rafter <br />to 2" ridge beam <br />3-10d box <br />3-3"xO.131" nails <br />3-3" 14 gage staples, 7/16" crown <br />3-10d common <br />3-16d box <br />4-lOdbox <br />4-3"xO.131" nails <br />4-3" 14 gage staples,?/16" crown <br />8. Structural plywood shall be DEPA grade, Structural CDX, thickness as noted on <br />plans with exterior glue conforming to product DOS PS1 or PS2. Each sheet <br />shall be identified by a registered stamp or brand. <br />9. Edges of all openings through roof or floor shall be nailed per boundary of <br />plywood diaphragm nailing requirements. <br />10. All wood bearing on concrete or masonry shall be pressure treated Douglas Fir. <br />11. All wood framing Max. moisture content to be 19%. <br />12. Joist hangers and other connectors shall be Simpson strong ties or equal. <br />6. Anchor bolts are 5/8"0 ©32"O.0 with galvanized plate washer 3"x3"xO.229". A <br />bolts shall be 12" at each end with 7" Min. embeddment©6' o.c TYP. <br />7. All Holdown hardware, anchor bolts & rebars to be secured in place prior to <br />call for inspection. <br />8. Saturate the soil 18" deep before placeing the concrete slab. <br />9. Grading & footing to be inspected & certified by the soil engineer prior to <br />pouring the concrete. <br />P 9 <br />10. Fasteners in preservative treated wood or fire retardant treated wood shall b <br />hot dipped zinc coated galvanized steel or stainless steel. in accordance w/ASTV <br />CONCRETE: <br />hor <br />WALL <br />8. <br />of <br />A153 <br />Stud to Stud (not at braced <br />wall panels) <br />16d common <br />10 d box <br />3"xO.131" nails <br />STRUCTURAL GLUE LAMINATED TIMBER: <br />1. <br />Cement: Type V conforming to A.S.T.M. C-150 C.B.C. <br />3" 14 gage sta les, 7/16" crown <br />9. <br />Stud to stud and abutting <br />studs at in tersecting wall <br />corners (at braced wall <br />panels) <br />16d common <br />1. Materials, manufacture and quality control shall be in conformance with 2. All concrete unless otherwise noted on plans will be regular weight hard rock <br />commercial standard, CS-253, "Structural Glued Laminated Timber". type (150 1 b/cu.ft.). Aggregate shall conform to A.S.T.M. C-33 with proven <br />2. Glued laminated beams shall be combination 24F-V8, Douglas Fir and Larch per shrinkage characteristics of less than 0.04% as per A.S.T.M. C-157. <br />AITC 117 or combination 24F-V8 with hem fir lamination per AITC. 3. Strengths: Ultimate compressive strength at 28 days F'c=2500 psi.ACI 318-19 <br />16d box <br />3"0.131" nails <br />3. All structural glued laminated timber shall be inspected during lamination by an <br />4. <br />Maximum slump of concrete used in floor slab at flat work shall be four(4) <br />1 <br />3" 14 gage staples, 7/16" crown <br />approved inspection agency. A certificate of inspection shall be provided for the <br />inches. <br />10. <br />Built-up header <br />16d common <br />16d box <br />Architect & building department prior to erection. 5. Vibration: Vibration of concrete shall be in accordance with the general <br />4. Each glued laminated beam shall be stamped with identification number and <br />shall be accompanied b a Certificate of Inspection. <br />P Y P <br />5. The glued laminated beams shall be furnished by a licensed fabricator <br />specializing in this type of work. The fabricator shall submit complete shop <br />drawings to the Architect for approval prior to fabrication. <br />6. <br />7. <br />provisions outlined in Portland Cement Association Spec. ST26. <br />Curing: Concrete shall be maintained in a moist condition for minimum of <br />five days after its placement. Approved curing compounds may be used in <br />lieu of moist curing. <br />Strength tests of concrete shall be required as per code and as outlined in <br />11 • <br />Continuous header to stud <br />4-8d common <br />4-10d box <br />12. <br />Top plate to top plate <br />16d common <br />IOd box <br />3"xO.131" nails <br />Anchorrage: <br />specification reports to be forward to the structural engineer. <br />1 1 <br />3" 14 gage staples, 7/16" crown <br />13. <br />Top plate to top plate, at <br />end joints <br />8-16d common <br />12-lOd box <br />12-3" " nails <br />a e staples, 7/16" crown <br />1144 gage <br />1.Min. Two bolts per piece of sill plate and one located within 12-inch and <br />not less than 7 bolt diameter or 4 inch of each end of each sill plate. <br />2.Min. of 5/8" diameter A.B. embeded 7 inch into footing and spaced not <br />more than 6' on center for one-story buildings or 4 feet on center two-story buildings. <br />3. 3"x3"XO.229" plate washer shall be used on each A.B. <br />4.all anchor bolts and holdowns shall be tied in place prior to foundation inspection. <br />8. Anchor bolts, dowels, inserts, etc. shall be securely tied in place prior to <br />foundation inspection. <br />9. Location of construction and pour joints shall be approved by the Architect <br />pouring concrete. <br />10. Continuous inspection required for concrete F'c greater than 2500 psi. <br />SOIL INFO.: <br />1. The foundation designed is based on the recommendations by CBC 2022 TABLE <br />14. <br />Bottom plate to joist, rim <br />joist, band joist or blocking <br />(not at braced wall panels) <br />166dd common <br />16d box <br />3"0.131" nails <br />WIND & EARTHQUAKE & DESIGN DATA: g, SEISMIC DESIGN CATEGORY D <br />1. BASIC WIIND SPEED=110 MPH <br />2. WIND IMPORTANCE FACTOR I=1.0, RISK CATEGORY II 9. BASIC SEISMIC -FORCE -RESISTING <br />3. WIND EXPOSURE=C SYSTEM: WOOD SHEAR WALL SYSTEM <br />4. ROOF DL=14 PSF, ROOF LL=20 PSF, 10. DESIGN BASE SHEAR: V=Cs*Wt <br />4.1 FLOOR DL=14 PSF, FLOOR LL=40 PSF, 11. SEISMIC RESPONSE COEFFIENT: Cs=0.261 <br />5. MAPPED SPECTRAL RESPONSE ACCELERATIONS 12. RESPONSE MODIFICATION FACTOR: R=6.5 <br />Ss=2.54, S1=0.848 13. ANALYSIS PROCEDURE USED: LATERAL DESIGN <br />6. SITE CLASS E 14. REDANDUNCY FACTOR Rho=1.3 <br />7. SPECTRAL RESPONSE COEFFIENTS, <br />Sds=1.693, Shc=0.848 <br />2. <br />3. <br />4. <br />1806.2 <br />The soil bearing value used for design of footing upon undisturbed soils and <br />24" below lowest finished grade is: 1500 PSF for spread footings, 1500 PSF <br />for continuous footings. <br />Soil engineer must inspect and approve footing excavation prior to placing <br />rebars and approval to be provided to the building inspector before City <br />PP P g P Y <br />approval of foundation. <br />90% min. compaction under new foundation. <br />3" 14 gage staples, 7/16" crown <br />15. <br />Bottom plate to joist, rim <br />joist, band joist or blocking <br />at braced wall panels <br />2-16d common <br />3-16d box <br />4-3"x0.131" nails <br />4-3" 14 gage staples, 7/16" crown <br />16. <br />Stud to top or bottom plate <br />4-8d common <br />4-10d box <br />4-3"x0.131" nails <br />4-3" 14 a e sta les, 7/16" crown <br />Orange County <br />DEPARTMENT OF PUBLIC WORKS <br />BUILDING & SAFETY DIVISION <br />REINFORCING STEEL: <br />1. a. All reinforced steel to conform to A.S.T.M. specification A615 Grade 60 b <br />unless noted otherwise on plans. <br />. Deformations shall be in accordance with A.S.T.M. A615. <br />2. Unless otherwise noted, all reinforcing steel shall be lapped 36 bar diameter <br />or 2'-0" minimum whichever governs. All splices shall be located as <br />2-16d common <br />3-lOd box <br />3-3"x0.131" nails <br />3-3" 14 gage staples, 7/16" crown <br />17. <br />Top or bottom plate to stud <br />2-16d common <br />3-10d box <br />detailed on plans. <br />3-3"0.131" nails <br />3. <br />certification and testing of reinforcing steel shall be in accordance with the <br />3-3" 14 gage staples, 7/16" crown <br />STRUCTURAL OBSERVATION PROGRAM <br />provision of A.S.T.M. standards. <br />18. <br />Top plates, laps at corners <br />2-16d common <br />AND DESIGNATION OF THE <br />4. <br />All reinforcing steel shall be supported and tied in conformance with the <br />latest edition of "The manual of Reinforcing Steel Practice for Reinforced <br />and intersections <br />3-10d box <br />3-3"0.131" nails <br />STRUCTURAL OBSERVER <br />PERMIT APPL. NO.: <br />Project Address: <br />5. <br />Concrete Structures". <br />Provide the following minimum protective covering of concrete unless <br />otherwise noted: Deposited against earth 3" clear <br />In contact with earth (formed) 2" clear <br />SPECIAL fNSPECTION PROGRAM <br />3-3" 14 gage staples, 7/16" crown <br />19. <br />1" brace to each stud and <br />plate <br />2-8d common <br />2-10d box <br />2-3"0.131" nails <br />2-3 14 gage staples, 7/16 crown <br />20. <br />1"x6" sheathing to each <br />2-8d common <br />Description of Work: House addition <br />This form to be attached to the construction plans prior to permit approval <br />bearing <br />2-10d box <br />21 <br />1" 8" and wider sheathin <br />3-8d common <br />Owner: Architect: <br />Engineer of Record: <br />STRUCTURAL OBSERVATION (ONLY CHECKED ITEMS ARE REQUIRED) <br />Firm or Individual to be responsible for the Structural Observation: <br />Name: Dacheng David Li Phone: 626 288-1216 Calif. Registration: C 58075 <br />FOUNDATION WALL FRAME DIAPHRAGM <br />❑ Footing, Stem Walls, Piers ❑ Concrete ❑ Steel Moment Frame ❑ Concrete <br />❑ Mat Foundation ❑ Masonry ❑ Steel Braced Frame ❑ Steel Deck <br />❑ Caisson, Piles, ❑ Wood ❑ Concrete Moment ❑ Wood <br />Grade Beams Frame <br />❑ Retaining Foundation ❑ Others: ❑ Masonry Wall Frame ❑ Others: <br />Hillside Special Anchors <br />❑ Others: ❑ Others: <br />DECLARATION BY OWNER <br />I, the Owner of the project, declare that the above listed firm or individual is hired by me to be the Structural <br />Observer. <br />Signature Date <br />DECLARATION BY ARCHITECT OR ENGINEER OF RECORD <br />(required if the Structural Observer is different from the Architect or Engineer of Record) <br />I, the Architect or Engineer of record for the project, declare that the above listed firm or individual is designated by <br />me to be responsible for the Structural Observation. <br />Signature License No. Date <br />ITEMS <br />DESCRIPTION <br />individuals/Finns*to <br />(only checked items are required) <br />(only checked items are required) <br />perform S. I. <br />El Concrete <br />❑AIIConcrete ❑Allexcept <br />❑ Test:_ per_c.y.; _@ 7 days, _@ 28 days, _hold. <br />❑ Bolts installed in Concrete <br />U Bolts in existing Concrete/masonry O bolts in shear walls <br />❑ Special Moment -Resisting <br />❑ Location as indicated El All concrete frames <br />Concrete Frame <br />❑ <br />El Test:_ per c.y.; �_ 7 days, @ 28 days, _hold. <br />❑ Reinforcing steel and <br />❑ Stressing and grouting of tendons <br />Pre -stressing Tendons <br />Steel placement: ❑ Periodic Inspection ❑ Continuous Inspection <br />❑ Structrual Welding <br />❑ All Welding Except <br />Periodic: ❑ Single pass fillet welds < I fi' ❑ Cladding Connection <br />❑ Welded studs ❑ Cold formed studs ❑ Metal deck <br />❑ Stairs&RailinEl Reinforcing steel <br />V1DT: ❑ UT <br />❑ Rg <br />❑ MPT <br />❑ PT <br />❑ High -strength Bolting <br />Snug tight: El All ❑ as indicated ❑ <br />Pretension: ❑ All ❑ as indicated ❑ <br />❑ Structrual Masonry <br />❑ Working Stress Design ❑ full- ❑ half -stresses ❑ as indicated <br />❑ Strength Design <br />❑ Empirical Design fill- _psi <br />TESTING: Before During ❑ Other Remarks <br />Prisms ❑ ❑ <br />Grout ❑ ❑ <br />Mortar ❑ ❑ <br />Units ❑ ❑ <br />❑ Piling, Drilled piers and <br />❑ Inspection by Geotechnical Engineer in addition to S. 1. <br />Caissons <br />❑ Load testing <br />Driving ❑ Continuous Inspection ❑ Periodic Inspection <br />Driving ❑ Continuous Inspection ❑ Periodic Inspection <br />❑ Shotcrete <br />❑ Pre -construction panel testing <br />❑ In -place cores testing <br />® Others <br />® Epoxy holdown and anchorage system (periodic. <br />® SW AND SSW Wall (periodic). <br />g <br />to each bearing <br />3-10d box <br />FLOOR <br />22. <br />Joist to sill, top plate, or <br />3-8d common <br />girder <br />3-10d box <br />3-3"0.131" nails <br />3-3" 14 gage staples, 7/16" crown <br />23. <br />Rim joist, band joist, or <br />8d common <br />blocking to top plate, sill or <br />10d box <br />other framing below <br />3"0.131" nails <br />3" 14 gage staples, 7/16" crown <br />24. <br />1 "x6" subfloor or less to <br />2-8d common <br />eachjoist <br />2-10d box <br />25. <br />2" subfloor to joist or <br />2-16d common <br />girder <br />26. <br />2" plank <br />2-16d common <br />27. <br />Built up girders and beams, <br />20d common <br />2" lumber layers <br />8. Ledger strip supporting <br />joists or rafters <br />9. Joist to band joist or rim <br />joist <br />0. Bridging or blocking to <br />10d box <br />3"xO.131" nails <br />3" 14 gage staples, 7/16" crown <br />And <br />2-20d common <br />3-10d box <br />3-3"0.131" nails <br />3-3" 14 gage staples, 7/16" crown <br />3-16d common <br />4-10d box <br />4-3"0.131" nails <br />4-3" 14 gage staples, 7/16" crown <br />3-16d common <br />4-10d box <br />4-3"xO.131" nails <br />4-3" 14 gage staples, 7/16" crown <br />2-8d common <br />Toenail <br />24" o.c. face nail <br />16" o.c. face nail <br />3 <br />16" o.c. face nail <br />12" o.c. face nail <br />12" o.c. face nail <br />16" o.c. each edge, face nail <br />12" o.c. each edge, face nail <br />Toenail <br />16" o.c. face nail <br />12" o.c. face nail <br />3"0.131" nails <br />Each side of end joint, face <br />nail (min 24" lap splice <br />Iength each side of end <br />joint) <br />16" o.c. face nail <br />12" o.c. face nail <br />16" o.c. face nail <br />Toenail <br />End nail <br />Face nail <br />Face nail <br />Face nail <br />Face nail <br />11 <br />6" o.c., toenail <br />Face nail <br />Face nail <br />Each bearing, face nail <br />32" o.c. face nail at top and <br />bottom staggered on <br />opposite sides <br />24" o.c. face nail at top and <br />bottom staggered on <br />opposite sides <br />Ends and at each splice, <br />face nail <br />Each joist or rafter, face nail <br />End nail <br />Each end, toenail <br />'LYW❑❑D SHEATH'G <br />2X6 @ 16' D.C.- <br />2X FULL WIDTH - <br />NAILER W/ 2-16d <br />NAIL EA. RAFTER <br />I� B.N. ­1 <br />PLYWOOD SHEATH'( <br />2X RAFTER` <br />@ 16' ❑.C. <br />B <br />TS <br />U <br />ti <br />c <br />M.B.@24" O.C. <br />STAGG. TYP. <br />A <br />SPLICE AT LOWER PLATE <br />20-16d EA. 16d @ 16'❑,C, <br />SIDE OF <br />SPLICE <br />PR❑VIDE STUD BELOW <br />SPLICES <br />PLYWD. AS NOTED <br />STUD @ 16' O.C. <br />U,N.O. <br />2-2X EXCEPT AS -� <br />NOTED ON FOURPLAN <br />EDGE NAIL'G - <br />BOUNDARY <br />NAILING <br />STAGGERED PLYWD. <br />SPLICES <br />2X BL❑CKING <br />TOP OF CONC. <br />SEE SHEAR WALL <br />SCHER FOR A.B. <br />N❑TE1 <br />WHERE PLYWD. OCCUR @ EA. SIDE STAGG. PANEL J❑INT. <br />NAI <br />0. <br />20-16cl EA. <br />SIDE OF <br />SPLICE <br />NAIL @ 12' O.C. <br />INTERM NAILING <br />#4X 3'-0' @ 16' D.C. <br />SMOOTH DOWELS <br />e' 's <br />=11I=III=111= •' III=1I1=111= <br />6 <br />If <br />' �.. .•:p"ter• A M.. .r , •• ,,.... <br />III,,-III,,-III,-111,�,111.-1•II ,III, ,III„ �I I II , <br />TYP. 1 1/4' DEPTH SAWCUT OR SLAB REINF❑RC'G <br />QUICK J❑IST @ 20'-0' EA. WHERE OCCURS <br />WAY MAX, (GROUT FILL) <br />4' C❑NC, LAB W/ <br />#4@16' o.c EA WAY <br />10 MIL VISQUEEN 4'-1/2'GRAVEL <br />.• e <br />•:. •�p,-.�.'. �^.mac. <br />- - <br />4'SLAB REINF❑ <br />•r.. o; .o " . t <br />y � ��� �• -III-III-III-I <br />I I-1 I lT-I 111 2-#4 C❑NT, SL <br />NOTE; WF <br />2 SEE NOTE ON FOUNDATIONPLAN CONC. SLAB O N GRAD E WHERE SAND & VISQUEENEEN APPLY, <br />rl /�I IAlrl rl\/ <br />TYPICAL WALL SHEATHING 5O <br />ST6224 STTRIP <br />EA. SIDEi <br />BSIMPS❑N DTC <br />v-@ 4'-0'❑.C. <br />L- 2X J❑IST <br />2X SILL PLATE <br />W/16d NAIL 12- <br />16'0,C, <br />R,M, SEE PLAN Vj-%%� HIP SEE PLAN <br />TE BLK'G <br />- A35 EA <br />SIDE CA <br />4X4 K.P. <br />A35 EA <br />SIDE <br />2-2X BM SEE PLAN L- 2X C.J. SEE PLAN <br />SIMPS❑N DTC <br />v-@ 4'-0'❑,C, 1 <br />2X J❑IST <br />X STUDS <br />2X SILL PLATE <br />W/16d NAIL @ - <br />16'0.C, <br />--12X F.J. IAI <br />x­- ST 6224 <br />STRIP@EA <br />SIDE <br />4X4 K.P. <br />H3 @ EA <br />SIDE <br />_ 2-2X STUDS <br />@16' ❑.0 <br />I /-- 4X4 K.P. I <br />HIP SEE PLAN A -A <br />SIMPS❑N DTC <br />@ 4'-0'❑,C, <br />2X STUDS <br />@ 16'0,C. <br />2X P.T. SILL <br />PLATE W/,138' <br />�-2-2X F.J. <br />0 HILTI X-C @ 8' <br />ICC-ES ESR1663 <br />.a <br />T-2X F.J. <br />8 <br />HTER <br />2X <br />LG. BLK'G CLG, J❑IST <br />❑IS <br />2XDBL PLS, <br />2XSTUDS <br />2XLEDGER @ 16' O.C. <br />w/2-16d <br />@ EA. STUD <br />CEILING J❑IST SCHEDULE <br />CLG. J❑ISTS ARE DESIGNED FOR DRYWALL OR PLANT (D,L,=5 P.S.F. N,L,L,=10 P.S.F. ) <br />SIZE SPACING J❑IST SPAN ( MAX.) REMARKS <br />2X4 12' O.C. 12'-0' <br />16' ❑.C. 10'-0' <br />12' ❑.C. 18'-0' THIS SCHEDULE APPLIES TO ALL <br />2X6 RMS. U.N.O. ON PLANS SEE ARCH'L <br />16, ❑.C. 16'-0' DRAWINGS FOR CLG. HEIGHT FIN. <br />& SPECIFIC REQMTS, <br />12' ❑.C. 24'-0' <br />2X8 <br />16, ❑.C. 21'-0' <br />2X10 12' ❑.C. 26'-0' <br />16' ❑.C. 24'-0' <br />CEILING JOISTS SCHEDULE("-.., <br />FLOOR JOIST <br />SEE PLAN FOR <br />SIZE SPACING <br />PLYWOOD SHT'G <br />INTERM NAILING 8d®10" O.C. <br />EDGE NAILING 10d®6" O.C. <br />OF PLYWOOD FLOOR OPENINGS <br />BE BOUND NAIL. <br />LYWOOD SHT. SHALL SPAN <br />THREE BEARINGS (MIN.) <br />TYPICAL DIAPHRAGM 4 <br />5/8' MIN, EDGE <br />DISTANCE TYP. <br />ALL STUD <br />NON BEARING STUDS <br />2-2X6 TOP PL, <br />1I I 2x6STUDS@16' ❑,C <br />PLUMBINC�WAT WALLS DETAIL A <br />-7 <br />40% MAX STUD 25% MAX. STUD <br />WIDTH NOTCH WIDTH NOTCH <br />60 % MAX. STUD <br />WIDTH BORE <br />5/8' MIN, EDGE <br />DISTANCE TYP. <br />ALL STUD <br />40% MAX STUD <br />WIDTH BORE <br />EXT AND BEARING STUDS <br />STUD WIDTH <br />NOTE: <br />1. NOTCH AND BORING NOT TO OCCUR <br />IN SAME STUD SECTION <br />2. NO MORE THEN 2 X SUCCESSIVE <br />DBL. STUDS MAY HAVE 60% BORING <br />HOLES. <br />NOTCH / BORE <br />2X4 <br />2X6 <br />25% <br />7/8" <br />1 3/8" <br />40% <br />1 3/8' <br />2 1 /8" <br />607o <br />2" <br />3 1 /4" <br />1 ■ <br />TYP. NOTCHING & BORING <br />SEE SCHEDULE <br />U.N.O. ON PLANS <br />2X TRIM <br />W/16d @ 12'❑,C. <br />HEADER <br />OPEN <br />3-16d NAILS <br />FOR 2X TRIMMER <br />(2-2X TRIMMER <br />AT ❑PENING <br />WIDER THAN <br />6'-0') <br />4-16d NAILS <br />FOR 4X HDR• <br />HEADER SCHEDULE <br />SPAN ROOF AND CEILING FIRST FLOOR W/CEILING <br />ONLY & ROOF <br />4'-0' 4X4 4X6 <br />6'-0 4X8 4X10 <br />8'-0' 4X10 4X12 <br />10'-0 4X12 4X14 2-2X TRIM <br />12' -0' 4X14 3 1/2X14 GLU LAM 2-2X TRIM <br />TYPICAL HEADER <br />101 <br />Building <br />Ag <br />rove <br />IT ISSUNN <br />Lam' <br />'.4 <br />CD <br />to rd <br />r-, <br />CV <br />v <br />O <br />� <br />W td � O <br />CO <br />��� <br />Q <br />G 'd co <br />o <br />0 acc)O �U) OC\2 <br />r--t <br />cn ko a) co 1 <br />0C) MN cd <br />O CO O .., <br />�rcf <br />Q�OFESSIp4, <br />�4AG Dq�/0 <br />co � <br />No. C058075 <br /><f'>gT�OFI <br />AL\fO <br />N MO <br />Z N <br />zIN=a <br />O U <br />I N <br />a N Z <br />a <br />ova <br />Co N Z <br />oqqa <br />Tom U) <br />Date <br />Scale <br />Drawn <br />Job: 25128 <br />Sheet <br />sm I <br />Of Sheet <br />encY <br />CE <br />