Laserfiche WebLink
4/30/2025 <br />KG <br />PV-1 <br />Date Plotted: <br />Drawn By <br />Checked By <br />SHEET NO. <br />SHEET NAME <br />SIGNATURE & SEAL <br />Project Number <br />200 S. San Pedro St #500 <br />Los Angeles, CA 90012, USA <br />info@calsolarinc.com <br />www.calsolarinc.com <br />C-46 SOLAR LIC. #1004246 <br />800-784-7612 <br />No.Description Date <br />36 <br />0 <br />0 <br />, <br />S <br />S <br />U <br />S <br />A <br />N <br /> <br />S <br />T <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br />CA <br /> 92 <br />7 <br />0 <br />4 <br />SO <br />U <br />T <br />H <br /> <br />C <br />O <br />A <br />S <br />T <br /> <br />T <br />E <br />C <br />H <br />N <br />O <br />L <br />O <br />G <br />Y <br /> <br />C <br />E <br />N <br />T <br />E <br />R <br />(56 <br />. <br />7 <br />4 <br />5 <br /> K <br />W <br /> <br />D <br />C <br /> <br />S <br />T <br />C <br /> <br />/ <br /> <br />50 <br />. <br />0 <br />0 <br />0 <br /> K <br />W <br /> <br />A <br />C <br /> <br />C <br />E <br />C <br />) <br />SH <br />1 REVISION 04/16/2025 <br />PROJECT LOCATION <br />PROJECT INFORMATION <br />PROJECT NAME: SOUTH COAST TECHNOLOGY CENTER - BUILDING #1 C&S & LL TI <br />SITE ADDRESS: 3600 S SUSAN ST, SANTA ANA, CA 92704 <br />AHJ: CITY OF SANTA ANA <br />OWNER: C. J. SEGERSTROM & SONS <br /> 3315 FARVIEW RD. <br /> COSTA MESA, CA 92626 <br />BUILDING HEIGHT: 48'-4" <br />OCCUPANCY: B, S-1, F-1 <br />CONSTRUCTION TYPE: TYPE III-B <br />SPRINKLERS: YES <br />UTILITY: SCE <br />GOVERNING CODES:- <br />THESE DRAWINGS AND THIS PROJECT COMPLIES WITH THE FOLLOWING CODES: <br />2020 NATIONAL ELECTRICAL CODE <br />2022 CALIFORNIA BUILDING CODE <br />2022 CALIFORNIA ELECTRICAL CODE <br />2022 CALIFORNIA GREEN CODE <br />2022 CALIFORNIA FIRE CODE <br />ALL OTHER ORDINANCE ADOPTED BY THE LOCAL GOVERNING AGENCIES <br />SCOPE OF WORK: <br />SUBMITTAL FOR CITY BUILDING AND ELECTRICAL REVIEW <br />THIS PROJECT ENTAILS THE INSTALLATION OF ROOF MOUNTED <br />PHOTOVOLTAIC (PV) SYSTEM. <br />THIS SYSTEM WAS DESIGNED IN COORDINATION WITH THE <br />BUILDING ARCHITECT AND ENGINEERS OF RECORD. <br />MODULES: <br />(97) PHONO SOLAR PS585M8GFH-24/TNH 585W <br />INVERTERS: <br />(2) CPS SCA25KTL-DO-R/US-480 <br />DC SYSTEM SIZE: 56.745 KW <br />AC SYSTEM SIZE: 50.00 KW <br />CO <br />V <br />E <br />R <br /> <br />P <br />A <br />G <br />E <br />INTERCONNECTION TYPE: NEM <br />SHEET INDEX <br />S.NO SHEET NAME <br />PV-1 COVER PAGE <br />PV-2 SITE PLAN <br />PV-3 ROOF PV LAYOUT <br />PV-4 ELECTRICAL LINE DIAGRAM <br />PV-5 SPEC SHEET <br />PV-6 ATTACHMENT DETAIL <br />PV-7 REFERENCE SHEET: FRAMING DETAIL <br />SOUTH COAST TECHNOLOGY CENTER <br />SOLAR PV SYSTEM <br />(56.745 KW DC STC / 50.00 KW AC CEC) <br />VICINITY MAP <br />AERIAL MAP <br />ELECTRICAL CONSTRUCTION GENERAL NOTES <br />1. ALL WORK SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE NEC (NATIONAL ELECTRIC CODE), NFPA <br />(NATIONAL FIRE PROTECTION ASSOCIATION), AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL CODES, LAWS AND <br />REGULATIONS. <br />2. ALL WORK SHALL CONFORM TO APPLICABLE STATE AND FEDERAL SAFETY CODES INCLUDING OSHA AND CAL OSHA. <br />NO "HOT" WORK IS AUTHORIZED. ALL "HOT" WORK SHALL BE APPROVED IN WRITING WITH THE GENERAL CONTRACTOR <br />AND OWNER. <br />3. COORDINATE ALL WORK WITH ARCHITECTURAL, MECHANICAL AND STRUCTURAL DRAWINGS, INSTALL ALL WORK TO <br />CLEAR NEW AND EXISTING ARCHITECTURAL AND STRUCTURAL MEMBERS. NO ITEM SUCH AS A PIPE, DUCT, ETC. SHALL <br />BE IN CONTACT WITH ANY ELECTRICAL EQUIPMENT. <br />4. CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE <br />COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY AND SECURITY <br />OF THE WORKSITE. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING <br />HOURS. <br />5. NOTIFY THE PRIME CONTRACTOR OR OWNER IMMEDIATELY AFTER DISCOVERING ANY HAZARDOUS MATERIAL. <br />6. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED. VERIFY <br />THE EXACT LOCATIONS AND CONDITIONS OF ALL EQUIPMENT REQUIRING ELECTRICAL CONNECTIONS PRIOR TO ANY <br />WORK. LOCATIONS FOR EQUIPMENT SHALL BE TAKEN FROM THE OTHER SHEETS WHERE THEY OCCUR. EXTEND <br />WIRING FROM ALL JUNCTION BOXES, CONTROL PANELS, PUMPS, RECEPTACLES, SWITCHES, ETC. AND MAKE ALL FINAL <br />CONNECTIONS TO THE EQUIPMENT AS REQUIRED. <br />7. THE INTENT OF THESE DRAWINGS IS FOR A COMPLETE ELECTRICAL SYSTEM. ANY ERRORS OR UNCERTAINTY SHALL <br />BE BROUGHT TO THE ATTENTION OF THE PRIME CONTRACTOR AND ENGINEER AS SOON AS FOUND. <br />8. THE COMPLETE ELECTRICAL INSTALLATION SHALL BE TESTED AS A COMPLETE WORKING SYSTEM. <br />9. RESTORE ALL DAMAGES RESULTING FROM WORK AND LEAVE PREMISES IN CLEAN CONDITION WHEN FINISHED WITH <br />10. FIRE STOP ALL PENETRATIONS THROUGH FIRE RATED SURFACES. <br />11. ALL NEW CIRCUIT BREAKERS SHALL BE RATED 10,000 AIC OR HIGHER <br />12. ALL CONDUITS SHALL BE EMT, INTERMEDIATE METAL CONDUIT, OR RIGID STEEL. MINIMUM SIZE SHALL BE 1/2". ALL <br />CONDUIT, BOXES, AND ELECTRICAL FITTINGS SHALL BE STEEL. <br />13. DO NOT USE THE WORKING SPACE WITHIN ANY EXIT SIGN OR ASSOCIATED JUNCTION BOX FOR ANY OTHER CIRCUIT. <br />14. PROVIDE EXPANSION AND DEFLECTION FITTINGS IN CONDUITS CROSSING BUILDING EXPANSION AND SEISMIC <br />JOINTS. <br />15. PROVIDE JUNCTION AND/OR PULL BOXES WHEN NECESSARY OR REQUIRED BY NEC. <br />SHALL BE USED. <br />16. INSTALL GREEN INSULATED GROUND WIRE IN ALL CIRCUITS. SIZE PER NEC REQUIREMENTS OR THE SAME AS <br />PHASE CONDUCTORS, WHICHEVER IS LARGER. UNLESS INDICATED OTHERWISE. <br />17. ALL NEW WIRING, CONDUIT, AND JUNCTION BOXES SHALL BE CONCEALED WITHIN NEW WALLS, CEILINGS OR FLOOR <br />SPACES. SURFACE MOUNT CONDUIT ON OLD WALLS AND CEILINGS. RUN ALL SURFACE RACEWAY TIGHT TO THE <br />STRUCTURE, PARALLEL TO BUILDING LINES. <br />18. NO FOREIGN EQUIPMENT SHALL BE LOCATED WITHIN THE SPACE ABOVE OR BELOW THE ELECTRIC PANELS. <br />19. PROVIDE SIGNAGE ON ALL ELECTRIC PANELS TO KEEP THE SPACE 36" IN FRONT OF THE PANELS FREE OF <br />OBSTRUCTIONS. <br />20. PROVIDE WARNING LABEL ON ALL PANELS "WARNING, ELECTRICAL ARC FLASH HAZARD, PERSONAL PROTECTION <br />EQUIPMENT REQUIRED, FAILURE TO COMPLY CAN RESULT IN INJURY OR DEATH, REFER TO NFPA 70E." WHERE THE <br />TERMINAL OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, A WARNING SIGN SHALL BE <br />MOUNTED ON OR ADJACENT TO THE DISCONNECTING MEANS. THE SIGN SHALL BE CLEARLY LEGIBLE AND HAVE THE <br />FOLLOWING WORDS OR EQUIVALENT: "WARNING - ELECTRIC SHOCK HAZARD, DO NOT TOUCH TERMINALS. TERMINALS <br />ON BOTH THE LINE AND THE LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION." <br />21. UPDATE PANEL BOARD DIRECTORY AS CIRCUITS ARE INSTALLED. PREPARE NEW TYPE WRITTEN PANEL <br />SCHEDULES. <br />22. ALL EXTERIOR EQUIPMENT SHALL BE IN WEATHERPROOF (NEMA 3R) ENCLOSURES. ALL NEW WIRING SHALL BE IN <br />CONDUIT, SUITABLE FOR SUN EXPOSURE AND WET LOCATIONS. FIELD APPLIED COATINGS ARE NOT ACCEPTABLE. <br />23. ALL MARKING SHALL BE PER CODE REQUIREMENTS. <br />24. INVERTERS MUST COMPLY WITH UL 1741 TO PREVENT ISLANDING ON POWER FAILURE. THE INVERTERS SHALL NOT <br />PUT POWER ON TO THE GRID IF THE GRID IS OFF-LINE. <br />25. NOTHING IN THESE PLANS SHALL BE CONSTRUED TO CONTRADICT NEC, UL OR LOCAL CODES. <br />26. ALL SYSTEM COMPONENTS (MODULES AND INVERTERS ETC.) SHALL BE UL LISTED, UL2703 AND UL1703. <br />27. MOUNT TO ROOF USING UL APPROVED MOUNTING HARDWARE. FOLLOW MANUFACTURERS INSTALLATION <br />MANUALS. <br />28. MARK THE NEC REQUIRED CLEAR SPACE ON THE FLOOR IN FRONT OF ALL DEVICES BEING INSTALLED. <br />29. SUPPORT ALL ROOF MOUNTED CONDUIT WITH FOAM "SLEEPERS" IN UL APPROVED SYSTEM. <br />30. PV MODULES SHALL NOT BE INSTALLED OVER ANY PLUMBING OR MECHANICAL VENTS, EXHAUSTS OR CHIMNEYS. <br />31. REMOVAL OF INVERTER, METER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE BONDING CONNECTION <br />BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR OUTPUT CIRCUIT <br />GROUNDED CONDUCTOR. <br />32. ALL PV MODULES AND ASSOCIATED EQUIPMENT SHALL BE PROTECTED FROM ANY PHYSICAL DAMAGE AND ACCESS <br />BY UNQUALIFIED PERSONS. <br />33. UTILITY IS 277/480V, 3 PHASE, 4W. PV SYSTEM IS UTILITY INTERACTIVE. <br />34. SYSTEM CARRIES A "CLASS A" FIRE RATING. <br />HSA & ASSOCIATES, INC. <br />CONSULTING STRUCTURAL ENGINEERS <br />APPROVED <br />BY DATE <br />REVIEWED FOR USE ON SUBJECT JOB ONLY <br />NOT RESPONSIBLE FOR: <br />QUANTITIES, OMISSIONS OR DEVIATIONS FROM CONTRACT <br />DOCUMENTS. CONTRACTOR TO VERIFY ALL DIMENSIONS ON <br />JOBS. <br />MAKE CORRECTION AS NOTED <br />REJECTED <br />REVISE AND RESUBMIT <br />FOR INFORMATION ONLY <br />4 <br />fady 5/8/2025