GENERAL GRADING NOTES
<br />1. ALL GRADING SHALL COMPLY WITH THE LATEST CBC CHAPTERS 18 AND 33, AND APPENDIX J AND THE SANTA ANA MUNICIPAL CODE. A CITY GRADING PERMIT IS REQUIRED FOR
<br />GRADING.
<br />2. GRADING SHALL NOT BE STARTED WITHOUT FIRST NOTIFYING THE CITY GRADING INSPECTOR. A PRE-GRADING MEETING ON THE SITE IS REQUIRED BEFORE STARTING OF
<br />GRADING WITH THE FOLLOWING PEOPLE PRESENT: GRADING CONTRACTOR, DESIGN CIVIL ENGINEER, GEOTECHNICAL ENGINEER, GRADING INSPECTOR AND WHEN REQUIRED,
<br />THE ARCHAEOLOGIST AND PALEONTOLOGIST. THE REQUIRED INSPECTIONS FOR GRADING WILL BE EXPLAINED AT THIS MEETING.
<br />3. AN APPROVED COPY OF THE GRADING PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS.
<br />4. THE DESIGN CIVIL ENGINEER SHALL BE AVAILABLE DURING THE GRADING TO VERIFY COMPLIANCE WITH THE PLANS, SPECIFICATIONS, CODE AND ANY SPECIAL CONDITIONS OF
<br />THE PERMIT WITHIN HIS PURVIEW.
<br />5. THE GEOTECHNICAL ENGINEER SHALL PERFORM PERIODIC INSPECTIONS AND SUBMIT A COMPLETE REPORT AND MAP UPON COMPLETION OF THE ROUGH GRADING. THE
<br />COMPACTION REPORT AND APPROVAL FROM THE GEOTECHNICAL ENGINEER SHALL INDICATE THE TYPE OF FIELD TESTING PERFORMED. EACH TEST SHALL BE IDENTIFIED WITH
<br />THE METHOD OF OBTAINING THE IN-PLACE DENSITY, WHETHER SAND CONE OR DRIVE RING, AND SHALL BE SO NOTED FOR EACH TEST. SUFFICIENT MAXIMUM DENSITY
<br />DETERMINATIONS SHALL BE PERFORMED TO VERIFY THE ACCURACY OF THE MAXIMUM DENSITY CURVES BY THE FIELD TECHNICIAN.
<br />6. CUT AND FILL SLOPES SHALL BE NO STEEPER THAN 2 FOOT HORIZONTAL TO 1 FOOT VERTICAL (2:1) EXCEPT WHERE SPECIFICALLY APPROVED OTHERWISE.
<br />7. FILLS SHALL BE COMPACTED THROUGHOUT TO A MINIMUM OF 90% RELATIVE DENSITY. AGGREGATE BASE FOR ASPHALTIC AREAS SHALL BE COMPACTED TO MINIMUM OF 95%
<br />RELATIVE DENSITY. MAXIMUM DENSITY SHALL BE DETERMINED BY UNIFORM BUILDING CODE STANDARD NO. 70-1 OR APPROVED EQUIVALENT, AND FIELD DENSITY BY UNIFORM
<br />CODE STANDARD NO. 70-2 OR APPROVED EQUIVALENT.
<br />8. THE CONTRACTOR SHALL NOT CREATE ANY TRENCH OR EXCAVATION 5-FEET OR MORE WITHOUT THE NECESSARY PERMIT FROM THE STATE OF CALIFORNIA DIVISION OF
<br />INDUSTRIAL SAFETY.
<br />9. ALL CUT SLOPES SHALL BE INVESTIGATED BOTH DURING AND AFTER GRADING BY THE GEOTECHNICAL ENGINEER TO DETERMINE IF ANY SLOPE STABILITY PROBLEM EXISTS.
<br />SHOULD EXCAVATION DISCLOSE ANY GEOLOGICAL HAZARDS OR POTENTIAL GEOLOGICAL HAZARDS, THE GEOTECHNICAL ENGINEER SHALL SUBMIT A RECOMMENDED TREATMENT
<br />TO THE CITY ENGINEER FOR APPROVAL.
<br />GENERAL NOTES FOR PUBLIC WORKS PERMITTED WORK ON WATER DISTRIBUTION SYSTEM
<br />1. CONSTRUCTION AND INSTALLATION OF ALL WATER MAINS AND APPURTENANCES SHALL BE IN ACCORDANCE WITH THE CITY OF SANTA ANA STANDARD PLANS AND SPECIFICATIONS. WHERE THE STANDARD
<br />PLANS ARE SILENT, CONSTRUCTION AND INSTALLATION OF WATER MAINS AND APPURTENANCES SHALL CONFORM TO THE AMERICAN WATER WORKS ASSOCIATION (AWWA) SPECIFICATIONS AND THE
<br />STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION, 2012 EDITION.
<br />2. CONSTRUCTION OF WATER MAINS AND APPURTENANCES SHALL ONLY BE PERFORMED BY QUALIFIED CONTRACTORS WITH A VALID CALIFORNIA CONTRACTOR A OR C34 LICENSE.
<br />3. NO PERSON, OTHER THAN CITY OF SANTA ANA WATER RESOURCES DIVISION STAFF CERTIFIED BY THE STATE OF CALIFORNIA AS A WATER DISTRIBUTION OPERATOR, SHALL BE ALLOWED TO OPERATE THE
<br />CITY'S WATER SYSTEM VALVES.
<br />4. NO PERSON, OTHER THAN CITY OF SANTA ANA WATER RESOURCES DIVISION STAFF CERTIFIED BY THE STATE OF CALIFORNIA AS A WATER DISTRIBUTION OPERATOR, SHALL SHUT WATER SERVICE OFF TO
<br />ANY CUSTOMERS.
<br />5. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT TO THE CITY FOR REVIEW AND APPROVAL "DISINFECTION AND FLUSHING PLAN" PER THE CITY OF SANTA ANA DESIGN
<br />GUIDELINES AND STANDARD DRAWINGS.
<br />6. ALL NEWLY CONSTRUCTED WATER MAINS AND APPURTENANCES SHALL BE DISINFECTED AND TESTED IN ACCORDANCE WITH THE AMERICAN WATER WORKS ASSOCIATION (AWWA) STANDARD C600'S,
<br />PRIOR TO CONNECTING TO THE CITY'S WATER DISTRIBUTION SYSTEM.DISINFECTION TESTING RESULTS SHALL BE SUBMITTED TO THE WATER RESOURCES DIVISION FOR REVIEW AND APPROVAL PRIOR TO
<br />CONNECTING TO THE CITY'S WATER DISTRIBUTION SYSTEM.
<br />10. THE PERMITTEE IS RESPONSIBLE FOR DUST CONTROL MEASURES. WATER ACTIVE SITES AT LEAST TWICE DAILY.
<br />11. THE LOCATING AND PROTECTION OF ALL EXISTING UTILITIES IS THE RESPONSIBILITY OF THE PERMITTEE.
<br />12. GRADING OPERATIONS, INCLUDING MAINTENANCE OF EQUIPMENT, WITHIN ONE-HALF (1/2) MILE OF A STRUCTURE OF HUMAN OCCUPANCY SHALL NOT BE CONDUCTED
<br />BETWEEN THE HOURS OF 8:00 P.M. AND 7:00 A.M. ON WEEKDAYS, INCLUDING SATURDAY, OR ANY TIME ON SUNDAY OR A FEDERAL HOLIDAY. (CITY OF SANTA ANA MUNICIPAL CODE
<br />SECTION 18-314)
<br />13. THE PERMITTEE SHALL GIVE REASONABLE NOTICE TO THE OWNER OF ADJOINING LANDS AND BUILDINGS PRIOR TO BEGINNING EXCAVATIONS, WHICH MAY AFFECT THE
<br />LATERAL AND SUBJACENT SUPPORT OF THE ADJOINING PROPERTY. THE NOTICE SHALL STATE THE INTENDED DEPTH OF EXCAVATION AND WHEN EXCAVATION COMMENCES. THE
<br />ADJOINING OWNER SHALL BE ALLOWED AT LEAST 30 DAYS AND REASONABLE ACCESS ON THE PERMITTED PROPERTY TO PROTECT HIS STRUCTURE, IF HE SO DESIRES, UNLESS
<br />OTHERWISE PROTECTED BY LAW.
<br />14. ALL EXISTING DRAINAGE COURSES THROUGH THE SITE SHALL REMAIN OPEN TO HANDLE THE STORM WATER; HOWEVER, IN ANY CASE, THE PERMITTEE SHALL BE HELD LIABLE
<br />FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS.
<br />15. APPROVED EROSION PROTECTION DEVICES SHALL BE PROVIDED AND MAINTAINED DURING THE RAINY SEASON AND SHALL BE IN PLACE AT THE END OF EACH DAY’S WORK.
<br />PROPER EROSION CONTROL MEASURES MUST BE SHOWN ON THE PLANS.
<br />16. CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN ANTICIPATED STORM DOES NOT CARRY WASTES OR POLLUTANTS OFF THE SITES. DISCHARGES
<br />OF MATERIAL OTHER THAN STORM WATER ARE ALLOWED ONLY WHEN NECESSARY FOR PERFORMANCE AND COMPLETION OF CONSTRUCTION PRACTICES AND WHERE THEY DO
<br />NOT: CAUSE OR CONTRIBUTE TO A VIOLATION OF ANY WATER QUALITY STANDARD; CAUSE OR THREATEN TO CAUSE POLLUTION, CONTAMINATION, OR NUISANCE; OR CONTAIN A
<br />HAZARDOUS SUBSTANCE IN A QUANTITY REPORTABLE UNDER FEDERAL REGULATIONS 40 CFR 117 AND 302. POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT LIMITED TO: SOLID OR
<br />LIQUID CHEMICAL SPILLS; WASTES FROM PAINTS, STAINS, SEALANTS, GLUES, LIMES, PESTICIDES, HERBICIDES, WOOD PRESERVATIVES AND SOLVENTS; ASBESTOS FIBERS, PAINT
<br />FLAKES OR STUCCO FRAGMENTS; FUELS, OILS, LUBRICANTS, AND HYDRAULIC RADIATOR OR BATTERY FLUIDS; FERTILIZERS, VEHICLES/EQUIPMENT WASH WATER AND CONCRETE
<br />WASH WATER; CONCRETE, DETERGENT OR FLOATABLE WASTES; WASTES FROM ANY ENGINE/EQUIPMENT STEAM CLEANING OR CHEMICAL DEGREASING; AND
<br />SUPERCHLORINATED POTABLE WATER LINE FLUSHINGS. DURING CONSTRUCTION, DISPOSAL OF SUCH MATERIALS SHOULD OCCUR IN A SPECIFIED AND CONTROLLED TEMPORARY
<br />AREA ON-SITE, PHYSICALLY SEPARATED FROM POTENTIAL STORM WATER RUN-OFF, WITH ULTIMATE DISPOSAL IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL
<br />REQUIREMENTS.
<br />17. DEWATERING OF CONTAMINATED GROUNDWATER, OR DISCHARGING CONTAMINATED SOILS VIA SURFACE EROSION IS PROHIBITED. DEWATERING OF NON-CONTAMINATED
<br />GROUNDWATER REQUIRES A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT FROM THE RESPECTIVE STATE REGIONAL WATER QUALITY CONTROL
<br />BOARD.
<br />18. ALL DIRT, SAND, MUD, OR DEBRIS DEPOSITED OR SPILLED UPON PUBLIC STREETS DURING ANY GRADING, HAULING, OR EXPORT OPERATIONS SHALL BE IMMEDIATELY CLEANED
<br />UP BY THE DEVELOPER, HIS CONTRACTOR, SUBCONTRACTORS, OR AGENTS TO THE SATISFACTION OF THE CITY ENGINEER. FAILURE TO DO SO WILL BE CAUSE FOR STOPPING ALL
<br />SUCH GRADING, HAULING, OR EXPORT WORK BY THE CITY UNTIL SUCH TIME AS THE STREETS ARE CLEANED.
<br />19. ALL TRUCKS HAULING DIRT, SAND, OIL, OR OTHER LOOSE MATERIALS ARE TO BE COVERED OR SHOULD MAINTAIN A LEAST TWO FEET OF FREEBOARD IN ACCORDANCE WITH
<br />THE REQUIREMENTS OF CVC SECTION 23114.
<br />20. CONTRACTOR IS RESPONSIBLE FOR THE REPAIR OF ALL DAMAGES TO PUBLIC PROPERTIES THAT ARE CAUSED BY THE WORK ON-SITE. REPAIR MUST BE COMPLETED TO THE
<br />SATISFACTION OF THE CITY ENGINEER.
<br />21. MINIMUM ASPHALT PAVEMENT SECTIONS SHALL BE:
<br />• 3”AC/6”AB - PARKING AISLES
<br />• 4”AC/8”AB - DRIVES [COMMERCIAL]
<br />• 4”AC/12”AB - DRIVES [INDUSTRIAL]
<br />• 3” A.C. OVER 4” A.B. - PARKING STALLS [MULTI-FAMILY]
<br />• 3” A.C. OVER 8” A.B. - DRIVE AISLES [MULTI-FAMILY]
<br />22. EARTHWORK VOLUMES:
<br />• CUT:
<br />• FILL:
<br />• NET:
<br />5 CUBIC YARDS
<br />70 CUBIC YARDS
<br />65 CUBIC YARDS (IMPORT)
<br />23. IF THE NET VOLUMES EXCEED 500 CUBIC YARDS, THE CONTRACTOR MUST SUBMIT A HAUL TRUCK ROUTE TO THE CITY FOR APPROVAL. HAUL ROUTE SHALL INCLUDE THE
<br />LOCATION OF BORROW AND/OR DISPERSAL SITE, ALL STREETS INCLUDED IN THE ROUTE, THE PROPOSED STAGING AREA AND THE MAXIMUM GROSS WEIGHT OF THE TRUCKS
<br />WHEN LOADED.
<br />24. SUBMIT AN 8 ½” X 11” HAUL ROUTE MAP OF APPROPRIATE SCALE WHICH INDICATES THE LOCATION OF THE PROJECT SITE, SHOWING STREETS AND DIRECTION OF HAULING UP
<br />TO AND INCLUDING THE END OF THE ROUTE.
<br />25. PURSUANT TO ASSEMBLY BILL 3019, NO EXCAVATION PERMIT IS VALID UNLESS THE CONTRACTOR CONTACTS AND OBTAINS AN INQUIRY I.D. NUMBER FROM “UNDERGROUND
<br />SERVICE ALERT” (1-800-422-4133) AT LEAST TWO WORKING DAYS PRIOR TO COMMENCING EXCAVATION.
<br />26. SEPARATE PERMITS MUST BE OBTAINED FROM THE CITY BUILDING AND SAFETY DIVISION FOR THE CONSTRUCTION OF RETAINING WALLS, LIGHT POLES, TRASH ENCLOSURES,
<br />ON-SITE PLUMBING AND ALL BUILDING STRUCTURES.
<br />EROSION AND SEDIMENT CONTROL GENERAL NOTES
<br />1. ALL WORK SHALL BE IN ACCORDANCE WITH THE EROSION CONTROL PLANS, THE PROJECT’S STORM WATER POLLUTION PREVENTION PLAN (SWPPP), AND THE
<br />RECOMMENDATIONS OF SOILS REPORT.
<br />2. EROSION CONTROL MEASURES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHENEVER THE DAILY RAINFALL PROBABILITY EXCEEDS 40%.
<br />3. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. NECESSARY MATERIALS SHALL BE AVAILABLE ON
<br />SITE AND STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL DEVICES AT ALL TIME.
<br />4. CONTROLS SHALL BE SET UP AND MAINTAINED AS CONSTRUCTION PROCEEDS. ADJUSTMENTS TO THE EROSION CONTROL PLANS ARE ALLOWABLE AS REQUIRED AND
<br />APPROVED BY CITY.
<br />5. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL IMPLEMENT STRUCTURAL AND NONSTRUCTURAL BEST MANAGEMENT PRACTICES (BMPS) IN CONFORMANCE WITH
<br />THE GUIDELINES OF THE CALIFORNIA STORM WATER BMP HANDBOOKS.
<br />6. AFTER A RAINSTORM, ALL SEDIMENT AND DEBRIS SHALL BE REMOVED FROM STREETS, BERMS AND DESILTING BASINS. ANY GRADED SLOPE SURFACE PROTECTION MEASURES
<br />DAMAGED DURING A RAINSTORM SHALL BE IMMEDIATELY REPAIRED.
<br />7. THE PERMITTEE AND CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT TRESPASS ONTO AREAS WHERE IMPOUNDED WATER
<br />CREATED A HAZARDOUS CONDITION.
<br />7. WATER MAINS WILL BE HYDROSTATIC TESTED AT 200 PSI FOR 2 HOURS. NEW WATER MAINS CANNOT BE TESTED AGAINST AN EXISTING VALVE BUT CAN BE TESTED USING A TEST PLATE.
<br />8. REQUESTS TO SHUT DOWN THE WATER DISTRIBUTION SYSTEM FOR TIE-INS OR OTHER PURPOSES SHALL BE COORDINATED WITH THE WATER RESOURCES DIVISION STAFF AT LEAST 2 WEEKS IN ADVANCE
<br />THROUGH THE CITY INSPECTOR. ALL CUSTOMERS AFFECTED BY THE PROPOSED SHUT DOWN SHALL BE NOTICED IN WRITING 48 HOURS IN ADVANCE BY THE CONTRACTOR.
<br />9. THE CITY OF SANTA ANA WATER RESOURCES DIVISION CANNOT GUARANTEE A COMPLETE SHUTDOWN OF EXISTING MAINS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING AND ISOLATION
<br />OF CONSTRUCTION FOR TESTING OR ANY OTHER PURPOSES.
<br />10. ALL FIRE HYDRANTS WHICH ARE OUT OF SERVICE OR NEW FIRE HYDRANTS WHICH HAVE NOT BEEN ACCEPTED FOR SERVICE SHALL BE COVERED WITH A SACK INDICATING THAT THE HYDRANTS ARE NOT
<br />IN SERVICE.
<br />11. MAINTAINING WATER SERVICE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR ANY SHUTDOWN LASTING LONGER THAN FOUR (4) HOURS. METHOD OF PROVIDING TEMPORARY SERVICE MUST
<br />BE APPROVED BY THE WATER RESOURCES DIVISION. THE WATER SHALL BE SAFE FOR DRINKING IN ACCORDANCE WITH STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD (SWRCB) DRINKING
<br />WATER PROGRAM (DWP).
<br />12. WATER METER WILL NOT BE INSTALLED NOR WATER TURNED ON UNTIL THE BACKFLOW DEVICES REQUIRED FOR THE BUILDING AND IRRIGATION SYSTEMS HAVE BEEN INSTALLED, TESTED, CERTIFIED,
<br />APPROVED; AND APPROVED AND SIGNED OFF BY THE CITY. CONTACT WATER RESOURCES DIVISION AT (714) 647-3320.
<br />13. ALL WATER MAINS SHALL BE AWWA C-900, DR 14 PVC PIPE OR AWWA C-151 DUCTILE IRON PIPE. ALL OTHER PIPE MATERIALS REQUIRE SPECIAL REVIEW AND APPROVAL FROM THE WATER RESOURCES
<br />DIVISION.
<br />14. WATER MAINS SHALL HAVE 36-INCHES MINIMUM COVER TO FINISHED GRADE. ANY DEVIATION FROM THIS REQUIREMENT REQUIRES APPROVAL FROM THE WATER RESOURCES DIVISION.
<br />15. CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL UTILITIES AND POINTS OF CONNECTION PRIOR TO TRENCHING.
<br />16. PRIVATE WATER APPURTENANCES SUCH AS BACKFLOW PREVENTERS, FIRE HYDRANTS AND STANDPIPES, AND VALVES SHALL BE PAINTED AS FOLLOWS:
<br />A) DOMESTIC WATER
<br />B)
<br />C)
<br />D)
<br />BLUE
<br />POTABLE IRRIGATION GREEN
<br />RECYCLED IRRIGATION PURPLE
<br />FIRE PROTECTION OSHA SAFETY RED
<br />17. DO NOT CUT OR SNAP CUT OR MILL ASBESTOS CEMENT PIPE. WHERE JOINING EXISTING ASBESTOS CEMENT PIPE, EXPOSE SIX FEET IN EACH DIRECTION, LOOKING FOR THE NEAREST JOINT AND JOIN TO
<br />NEW PIPE WITH A PROPERLY DIMENSIONED ADAPTER PER STANDARD PLAN NUMBER 1443.
<br />18. DO NOT TAP EXISTING WATER MAINS WITHOUT THE PRESENCE OF A CERTIFIED PUBLIC WORKS INSPECTOR. PRESSURE TEST TAPPING SLEEVE IN THE PRESENCE OF A CERTIFIED PUBLIC WORKS
<br />INSPECTOR BEFORE TAPPING EXISTING MAIN.
<br />19. FINAL ACCEPTANCE WILL NOT OCCUR UNTIL ORIGINAL RECORD DRAWINGS ON MYLAR AND DIGITAL FILE ARE DELIVERED TO AND ACCEPTED BY THE CITY'S INSPECTOR. SHOW ALL FIELD CHANGES ON
<br />RECORD DRAWINGS.
<br />20. TRENCH PLATES SHALL BE FLUSH WITH PAVEMENT AND SHALL BE NON-SKID.
<br />21. WHEN PUBLIC WATER FACILITIES ARE LOCATED ON PRIVATE PROPERTY, EASEMENT DOCUMENTS ARE TO BE SUBMITTED TO THE CITY FOR APPROVAL PRIOR TO A PERMIT BEING ISSUED.
<br />22. ALL RECYCLED WATER PROJECTS REQUIRE REVIEW AND APPROVAL BY THE WATER RESOURCES DIVISION.
<br />23. REMOVE FROM THE FIELD UPPER AND LOWER FIRE HYDRANT DRY BARREL AND 24''X36'' IRON VAULT LID COVERS AND DELIVER UNDAMAGED TO THE CITY WATER RESOURCE DIVISION YARD LOCATED AT
<br />215 S. CENTER STREET. PRIOR NOTIFICATION OF THE DELIVERY IS REQUIRED AT (714) 647-3320.
<br />24.WATER MAIN FITTINGS SHALL BE FLANGE OR MECHANICAL JOINTS ONLY, NO PUSH-ON JOINT FITTINGS ALLOWED.
<br />25. CONTRACTOR SHALL NOT REMOVE OR DISPOSE EXISTING WATER METERS. CONTRACTOR SHALL APPLY FOR AN ABANDON WATER METER APPLICATION. CONTRACTOR SHALL CONTACT WATER
<br />RESOURCES DIVISION AT (714) 647-3320 FOR EXISTING METER REMOVALS.
<br />26. INSTALLATION OF NEW WATER METER SERVICE CURB STOP SHALL BE DONE AFTER INSTALLATION OF NEW CURB AND GUTTER OR AFTER CONTRACTOR HAS ESTABLISHED THE PROPOSED CURB GRADE
<br />BY STAKING OF THE PROPOSED CURB.
<br />VICINITY MAP
<br />N.T.S.
<br />DRAWING INDEX
<br />SHEET 1 - TITLE SHEET
<br />SHEET 3 - TOPOGRAPHIC MAP AND DEMOLITION PLAN
<br />OHANA MONTESSORI
<br />CHILD CARE CENTRE
<br />2102 NORTH TUSTIN AVE
<br />SANTA ANA, CA 927O5
<br />BENCHMARK BASIS OF BEARINGS
<br />O.C.S.BM SA-260-70
<br />DESCRIBED BY OCS 2001 - FOUND 3 3
<br />4" OCS
<br />ALUMINUM BENCHMARK DISK STAMPED
<br />"SA-260-70", SET IN 4 IN. BY 4" CONCRETE POST.
<br />MONUMENT IS LOCATED IN THE SOUTHWEST
<br />CORNER OF THE INTERSECTION OF 17TH STREET
<br />AND MABURY STREET, 21 FT. WESTERLY OF THE
<br />CENTERLINE OF MARURY STREET AND 243 FT.
<br />THE BEARING SHOWN HEREON ARE BASED
<br />ON THE CALIFORNIA COORDINATE SYSTEM
<br />(CCS83), ZONE VI, NAD 83 AS DETERMINED
<br />LOCALLY BY THE LINE BETWEEN ORANGE
<br />REVISIONS
<br />REV. # DATE BY DESCRIPTION
<br />OWNER/DEVELOPER
<br />TOUFAN RAZI
<br />102 Lovelace
<br />Irvine, CA 92620
<br />(408) 416 6003
<br />APPROVAL SOILS ENGINEER CIVIL ENGINEER
<br />2147 Iris Place
<br />Costa Mesa, CA 92627
<br />TEL.: (949) 791-8401
<br />MATT@HAMILTONLDI.COM
<br />PREPARED UNDER SUPERVISION OF:
<br />TITLE SHEET
<br />MATTHEW HAMILTON
<br />RCE NO. 63322
<br />SHEET
<br />1
<br />OF
<br />5
<br />SHEET 2 - GRADING PLAN AND DETAILS
<br />GRADING PLAN
<br />Rodolfo Rosas, P.E.Date
<br />City Engineer
<br />Nabil Saba, P.E.Date
<br />Executive Director Public Works Agency
<br />SOUTHERLY OF THE CENTERLINE OF 17TH STREET.
<br />MONUMENT IS SET LEVEL WITH THE SIDEWALK.
<br />ELEVATION = 166.666 FT (NAVD88 2010)
<br />COUNTY SURVEYOR'S HORIZONTAL CONYTOL
<br />STATIONS GPS NO. 6014 AND GPS NO. 6005.
<br />THE BEARING BETWEEN OF SAID LINE BEING
<br />N 35° 15' 30" E, PER RECORDS ON FILE IN THE
<br />OFFICE OF THE COUNTY SURVEYOR.
<br />HAMILTON LAND
<br />DEVELOPENT, INC
<br />ASSESOR'S PARCEL NUMBER: 396 - 331 - 01UTILITY CONTACT INFORMATIONS:
<br />WATER: CITY OF SANTA ANA (714-647-3380)
<br />SEWER: CITY OF SANTA ANA (714-647-3380)
<br />ELECTRIC: SOUTHERN CALIFORNIA EDISON (800-611-1911)
<br />GAS: THE GAS COMPANY (800-427-2200)
<br />TELEPHONE: AT & T (800-288-2747)
<br />CONSTRUCT CONCRETE 6" CURB PER SPPWC STD. PLAN 120-3 A1-6 (150)1
<br />CONSTRUCT CONCRETE WALK PER DETAIL NO. 2 ON SHEET 22
<br />3
<br />CONSTRUCTION NOTES
<br />CONSTRUCT CURB RAMP PER DETAIL NO. 3 ON SHEET 2
<br />PAINT PARKING STALL STRIPING PER DETAIL 20 ON SHEET 220
<br />22 PAINT CURB FACE RED - FIREL ANE IDENTIFICATION PER
<br />4 CONSTRUCT 6' HEIGHT SPLIT FACE CONCRETE WALL WITH VINES
<br />23 INSTALL "NO PARKING" SIGN AND SIGN POST INSTALLATION
<br />24 INSTALL SIGN "NO PARKING FROM 6AM TO 6 PM SIGN AND SIGN POST
<br />5 PROTECT IN PLACE
<br />6 RELOCATE EXISTING TREE PER PLAN
<br />7 FUTURE OUTDOOR ACTIVITY AREA
<br />8 CONSTRUCT 6" CONCRETE PAVING
<br />9 CONSTRUCT COVERED TRASH ENCLOSURE PER LANDSCAPE PLAN
<br />11 INSTALL BICYLE RACKS PER LANDSCAPE PLAN
<br />180
<br />135
<br />1
<br />135
<br />2
<br />1
<br />385
<br />1
<br />1
<br />1
<br />100
<br />1
<br />1
<br />INSTALLATION PER CITY STANDARD PLAN NO. 1504-A
<br />PER CITY STANDARD PLAN NO. 1504-A
<br />DETAIL NO. 22 ON SHEET 4
<br />SIGNING AND STRIPING
<br />QUANTITIES UNITS
<br />1
<br />LF
<br />SF
<br />EA
<br />LF
<br />EA
<br />LS
<br />SF
<br />EA
<br />LS
<br />LS
<br />LF
<br />EA
<br />EA
<br />LS
<br />15 SAWCUT, REMOVE AND DISPOSE OFF EXISTING A.C. PAVEMENT
<br />16
<br />17 REMOVE AND DISPOSE OFF EXISTING TRASH ENCLOSURE
<br />2,380
<br />385
<br />1
<br />SF
<br />EA
<br />EA
<br />SAWCUT, REMOVE AND DISPOSE OFF EXISTING CONCRETE CURB
<br />12 CONSTRUCT FULL DEPTH A.C. PAVING PER DETAIL ON SHEET 2
<br />180 SF
<br />13 CONSTRUCT 3" A.C. / 6" A.B. AC PAVEMENT (PARKING AISLES)
<br />180 SF
<br />18 REMOVE AND DISPOSE OFF EXISTING CONCRETE PAVEMENT 260 SF
<br />PLOTTED: 05/28/2015
<br />OHANA MONTESSORI
<br />CHILD CARE CENTRE
<br />2102 NORTH TUSTIN AVE
<br />SANTA ANA, CA 927O5
<br />NO. 50101507
<br />I HAVE REVIEWED AND APPROVED THIS GRADING PLAN. IT COMPLIES
<br />WITH ALL THE REQUREMENTS AND RECOMENDATIONS PER GEOTECHNICAL
<br />SOILS ENGINEER CERTIFICATION
<br />SIGNITURE DATE
<br />REPORT DATED:
<br />1590 N. Brian Street
<br />Orange, CA 92867
<br />TEL.: (714) 637-3093
<br />HARRINGTON GEOTECHNICAL
<br />GRADING PERMIT:
<br />SHEET 4 - HORIZONTAL CONTROL AND
<br />SHEET 5 - EROSION CONTROL PLAN
<br />CIVIL ENGINEER
<br />2147 Iris Place
<br />Costa Mesa, CA 92627
<br />CONTACT: Matt Hamilton (949) 791-8401
<br />HAMILTON LAND
<br />DEVELOPENT, INC
<br />OWNER
<br />102 Lovelace
<br />Irvine, CA 92620
<br />Contact: Toufan Razi (949) 791-8401
<br />TOUFAN RAZI
<br />STRUCTURAL
<br />112 E. Chapman Ave, Suite D
<br />Orange, CA 92866
<br />Contact: Chuck Yaghi (714) 997-9120
<br />SHCRI (CHUCK) STRUCTURAL ENRINEER
<br />LEGAL DESCRIPTION:
<br />PARCEL 1 OF PARCEL MAP NO. , IN THE CITY OF SANTA ANA, COUNTY OF ORANGE,
<br />STATE OF CALIFORNIA AS PER MAP FILED IN BOOK 11, PAGE(S) 23, OF PARCEL MAPS
<br />IN THE OFFFICE OF SAID COUNTY.
<br />SOILS ENGINEER
<br />1590 N. Brian Street
<br />Orange, CA 92867
<br />CONTACT: Sabrina Grossman (714) 637-3093
<br />HARRINGTON GEOTECHNICAL
<br />LANDSCAPE ARCHITECT
<br />36275 Avenida De Acacias
<br />Temecula, CA 92592
<br />Contact: Robert Taft (714) 637-3093
<br />ROBERT TAFT and ASSOCIATES
<br />SURVEYOR
<br />1906 Orange Lane, Suite 240
<br />Redlands, CA 92374
<br />Contact: Anthony Smith (909) 792-2221
<br />ON POINT
<br />SCOPE OF WORK:
<br />REMODEL EXISITNG 5,580 SQ.FT. TENANT SUITE INCLUDEING MISCELLANEOUS
<br />DEMOLITION, NEW FRAMED PATITIONS AND CEILINGS, NEW SINK AND CABINETRY,
<br />ALTERATIONS TO MECHANICAL, PLUMBING, AND ELECTRICAL SYSTEMS AND
<br />CHNAGES TO EXTERIOR AREA AND LANDSCAPING (RECONFIGURE PARKING LOT)
<br />FLOOD ZONE X
<br />FIRM NUMBER: 06059C0164J
<br />EFFECTIVE DATE: 12/03/2009
<br />PROJECT INFORMATION:
<br />TOTAL DISTURBED AREA = O.09 ACRES
<br />TOTAL EXISTING LANDSCAPE = 0.132 ACRES
<br />PRE-DEVELOPMENT IMPERVIOUS AREA -= 0.22
<br />POST-DEVELOPMENT IMPERVIOUS AREA = 0.21
<br />TOTAL PROPOSED LANDSCAPE = 0.126 ACRES
<br />PROJECT AREA = O.5929 ACRES
<br />SIGNING & STRIPING PLAN
<br />PER LANDSCAPE PLAN
<br />14 CONSTRUCT CURB CORE PER DETAIL ON SHEET 2
<br />4 EA
<br />10 INSTALL 6" DRAIN INLET PER DETAIL ON SHEET 2
<br />4 EA
<br />(3" WEEP HOLES 10' O.C., AT BOTTOM OF THE WALL)
<br />WALL INFORMATION SHOWN HERE ARE PRELIMINARY.
<br />FINAL DESIGN PER LANDSCAPING PLAN
<br />Behrooz Sarlak 6/10/2025
|