My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10180813_2118 W. 12TH - Plan (2)
PBA
>
Building
>
Plans
>
T
>
Twelfth St
>
2118 W Twelfth St
>
10180813_2118 W. 12TH - Plan (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2021 5:27:33 PM
Creation date
10/25/2020 10:39:03 PM
Metadata
Fields
Template:
Plan
Permit Number
10180813
Full Address
2118 W Twelfth St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
uick Mount PY <br />Classic Composition Mounting Instructions <br />E <br />Installation Tools Required: tape measure, roofing bar, chalk line, stud finder, caulking gun, 1 tube of appropriate sealant, drill with <br />7/32" bit, drill or impact gun with 1/2" deep socket <br />WARNING: Quick Mount PV products are NOT designed forand should NOT be used to anchor fall protection equipment. <br />ri - <br />%9 <br />3 <br />Locate, choose, and mark centers of rafters to be Carefully lift composition roof shingle with roofing Slide mount into desired position. Remove any <br />mounted. Select the courses of roofing where bar, just above placement of Quick Mount.nails that prevent getting the mount flush with <br />Quick Mounts will be placed.front edge of shingle course. Mark center for <br />drilling. <br />6 <br />b <br />Using drill with 7/32" bit, drill pilot hole into roof Clean off any sawdust, and fill hole with roof Slide mount back into position. Prepare hanger bolt <br />and rafter, taking care to drill square to the roof. manufacturer's approved sealant.with 1 hex nut and 1 sealing washer, insert through <br />Do not use mount as a drill guide.block into hole and drive hanger bolt into after, <br />tightening to a solid snug fit. * <br />4 <br />U <br />You are now ready forthe rack of your <br />choice. Follow all the directions of <br />the rack manufacturer as well as the <br />module manufacturer. <br />All roofing manufacturers' written <br />instructions must also be followed <br />by anyone modifying a roof system. <br />Pleaseconsultthe roof manufacturer's <br />specs and instructions prior to <br />touching the roof. <br />Insert EPDM rubber washer over hanger bolt into Using the rack kit hardware, secure the rack of your * It is not necessary or advisable to use nails or other <br />block.choice. Tighten to 13 foot pounds.fasteners to secure the perimeter of the flashing. <br />Bl 7.2.3-7 <br />925-478-8269 • www.quickmountpv.com • info@quickmountpv.com <br />2700 Mitchell Dr., Bldg 2 • Walnut Creek, CA 94598 May-2012, Rev 2 <br />9
The URL can be used to link to this page
Your browser does not support the video tag.