1001
<br />SYMBOLS DESCRIPTION
<br />01/A-2.00
<br />01
<br />A-4.00
<br />N
<br />NORTH ARROW
<br />ENLARGE FLOOR PLAN REFERENCE
<br />01
<br />A-4.00 DETAIL SECTION
<br />INTERIOR ELEVATION
<br />11 5/8"
<br />5"
<br />DIMENSIONS
<br />1 REVISION NUMBER &
<br />AFF ECTED AREA
<br />WINDOW TYPE22
<br />ROOM NAME ROOM NAME & NUMBER
<br />IDENTIFICATION
<br />1001A DOOR/OPENING IDENTIFICATION
<br />SEE SCHEDULE ON A6-01
<br />A3
<br />1
<br />PART ITION
<br />DESIGNATION
<br />HOURLY "FIRE
<br />RESISTIVE RATING"
<br />IF APPLICABLE
<br />PART ITION TYPE
<br />PROJECT SITE
<br />S HARBOR BLVD
<br />S FAIRVIEW ST
<br />W MACART HUR BLVD
<br />SUNFLOWER AVE
<br />INTERSTATE
<br />405
<br />HYLAND AVE
<br />SUSAN ST
<br />S COAST DR
<br />W LAKE CENTER DR
<br />SCENIC AVE
<br />N
<br />A D 1 -1 1
<br />LEVEL 1 DESIGNATOR
<br />LEVEL 2 DESIGNATOR (OPTIONAL)
<br />SHEET TYPE DESIGNATOR
<br />FLOOR LEVEL (FOR PLANS ONLY)
<br />SHEET SEQUENCE NUMBER
<br />LEVEL 1 DESIGNATORS
<br />G GENERAL
<br />H HAZARDOUS MATERIALS
<br />V SURVEY / MAPPING
<br />B GEOTECHNICAL
<br />C CIVIL
<br />L LANDSCAPE
<br />S STRUCT URAL
<br />A ARCHIT ECTURAL
<br />I INTERIORS
<br />Q EQUIPMENT
<br />F FIRE PROT ECTION
<br />P PLUMBING
<br />M MECHANICAL
<br />E ELECTRICAL
<br />T SECURIT Y
<br />R RESOURCES
<br />X OTHER DISCIPLINES
<br />Z CONTRACT OR SHOP
<br />DRAWINGS
<br />O OPERATIONS
<br />LEVEL 2 DESIGNAT ORS (OPTIONAL)
<br /> S SITE
<br /> D DEMOLIT ION
<br /> E ELEMENT
<br /> P POWER
<br /> L LIGHTING
<br />SHEET TYPE DESIGNATORS
<br />0 GENERAL (OPTIONAL USE AS DEMO)
<br />1 PLANS
<br />2 ELEVATIONS
<br />3 SECTIONS
<br />4 ENLARGED PLANS
<br />5 DETAILS
<br />6 SCHEDULES
<br />7 USER DEFINED
<br />8 USER DEFINED
<br />9 3D VIEWS
<br />OWNER'S REPRESENTATIVE:
<br />KAISER FOUNDATION HEALTH PLAN INC.
<br />1707 BARCELONA CIRCLE
<br />PLACENTIA, CA 92870
<br />CONTACT: HEIDI R. DAVIS
<br /> PROJECT MANAGER
<br />E-MAIL: HEIDI.R.DAVIS@KP.ORG
<br /> 562.254.9762
<br />ARCHITECT:
<br />HUIT T-ZOLLARS
<br />555 W 5TH ST .
<br />LOS ANGELES, CA 90013
<br />CONTACT : STEPHEN WHITE, AIA, LEED AP
<br /> PROJECT ARCHITECT
<br />E-MAIL SWHITE@HUITT -ZOLLARS.COM
<br /> 310.447.7466
<br />ELECTRICAL ENGINEER:
<br />IMEG CORP
<br />222 S. HARBOR BOULEVARD, SUITE 800
<br />ANAHEIM, CA 92805
<br />CONTACT: TIFFINY S. MANSOURI
<br /> ELECTRICAL ENGINEER
<br />E-MAIL: TIF FINY.S.MANSOURI@IMEGCORP.COM
<br />PLU MBING ENGINEER:
<br />ADVANCES TECHNOLOGIES CONSULTANTS
<br />5755 OBERLIN DRIVE, SUITE 1212
<br />SAN DIEGO, CA 92121
<br />CONTACT: JUSTIN NGUYEN, PE
<br /> PLUMBING ENGINEER
<br />E-MAIL JNGUYEN@ATCONSULTANTS.NET
<br />MECHANICAL ENGINEER:
<br />ADVANCES TECHNOLOGIES CONSULTANTS
<br />5755 OBERLIN DRIVE, SUITE 1212
<br />SAN DIEGO, CA 92121
<br />CONTACT: JUSTIN NGUYEN, PE
<br /> MECHANICAL ENGINEER
<br />E-MAIL JNGUYEN@ATCONSULTANTS.NET
<br />STR UCTURAL ENGINEER:
<br />WALTER P MOORE
<br />707 WILSHIRE BOULEVARD, SUITE 2100
<br />LOS ANGELES, CA 90017
<br />CONTACT : DANIEL TRAUB, S.E.
<br /> STRUCTURAL ENGINEER
<br />E-MAIL: DTRAUB@WALTERPMOORE.COM
<br />GENERAL NOTES
<br />1.U.O.N. SPECIFIC NOTES AND DETAILS ON DRAWINGS SHALL T AKE PRECEDENCE
<br />OVER GENERAL NOT ES AND TYPICAL DET AILS. SPECIFIC NOTES ON DETAILS APPLY
<br />TO SIMILAR CONDITIONS.
<br />2. THE STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS AS
<br />WELL AS THE DRAWINGS OF OTHER CONSULTANTS ARE SUPPLEMENTARY TO
<br />THE ARCHITECTURAL DRAWINGS. IT SHALL BE T HE RESPONSIBILIT Y OF THE
<br />GENERAL CONTRACTOR TO CHECK WITH T HE ARCHITECTURAL DRAWINGS
<br />BEFORE THE INSTALLATION OF THE WORK SHOWN ON THE DRAWINGS OF
<br />CONSULTANTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES
<br />BETWEEN THE ARCHITECTURAL DRAWINGS AND THE DRAWINGS OF THE
<br />CONSULTING ENGINEERS TO THE ATTENTION OF THE ARCHITECT FOR
<br />CLARIFICATIONS. ANY WORK INSTALLED IN CONFLICT THE ARCHITECTURAL
<br />DRAWINGS AND NOT BROUGHT TO THE ARCHITECTS ATTENTION SHALL BE
<br />CORRECT ED BY THE CONTRACTOR AT THE CONTRACTORS' EXPENSE AND AT
<br />NO EXPENSE TO THE OWNER OR T HE ARCHITECT.
<br />3. REFERENCE TO ANY DET AIL OR DRAWING IS FOR CONVENIENCE ONLY AND DOES
<br />NOT LIMIT THE APPLICATION OF SUCH A DRAWING OR DETAIL.
<br />4. U.O.N. OR REFERENCED ON ARCHITECTURAL DRAWINGS, ALL DETAILS ARE TYPICAL.
<br />5. THE CONTRACT DOCUMENTS INDICATED THE CONCEPT AND POT ENTIAL METHOD OF
<br />EXECUTING THE WORK. FIELD MODIFICATIONS MAY BE REQUIRED AND SHALL BE
<br />PART OF THE SCOPE OF WORK.
<br />6. THE INTENTION OF T HE CONTRACT DOCUMENTS IS TO INCLUDE ALL
<br />LABOR AND MATERIALS, EQUIPMENT AND TRANSPORTATION
<br />NECESSARY FOR THE COMPLET E AND PROPER EXECUTION OF THE WORK.
<br />7. NO MODIFICATIONS FROM THE DOCUMENTS SHALL BE CONDUCTED
<br />PRIOR TO THE APPROVAL OF THE OWNER AND ARCHITECT.
<br />8. DISCREPANCIES IN DRAWINGS OR SPECIFICATIONS, OR BETWEEN
<br />DRAWINGS, SPECIFICATIONS AND OR SITE CONDITIONS SHALL BE
<br />REVIEWED WITH THE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK.
<br />9. REF ER T O STRUCT URAL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR
<br />EQUIPMENT ANCHORAGE, HVAC, PLUMBING, LIGHTING, COMMUNICATION, DATA AND
<br />POWER REQUIREMENTS.
<br />10.THE DESIGN, ADEQUACY AND SAFETY OF ERECT ION, BRACING, SHORING, TEMPORARY
<br />SUPPORTS, ETC., IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. T HE CONTRACTOR
<br />SHALL BE RESPONSIBLE FOR THE STABILITY OF THE STRUCTURE AND PROVIDE NECESSARY
<br />BRACING PRIOR TO T HE APPLICATION OF ALL SHEAR WALLS, ROOF, AND FLOOR DIAPHRAGMS,
<br />AND FINISH MATERIALS. T HE CONTRACTOR SHALL BE RESPONSIBLE FOR T HE INITIATING,
<br />MANUFACTURING AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN
<br />CONNECTION WITH THE WORK.
<br />11.THE ARCHITECT AND ARCHITECT'S CONSULTANTS SHALL HAVE NO RESPONSIBILITY FOR THE
<br />DISCOVERY,PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF OR EXPOSURE OF PERSONS
<br />TO
<br />HAZARDOUS MATERIALS IN ANY FORM AT THE PROJECT SITE, INCLUDING BUT NOT LIMITED TO
<br />ASBEST OS, ASBESTOS PRODUCT S,POLYCHLORINAT ED BIPHENYL (PCB) OR OTHER TOXIC
<br />SUBSTANCES.
<br />12.IF THE CONTRACTOR ASCERTAINS AT ANY TIME THAT REQUIREMENTS OF T HE CONTRACT
<br />DOCUMENTS CONFLICT WITH, OR ARE IN VIOLATION OF APPLICABLE LAWS, CODES,
<br />REGULATIONS AND ORDINANCES, THE CONTRACTOR SHALL NOT PROCEED WITH WORK IN
<br />QUESTION, EXCEPT AT THE CONTRACTOR'S OWN RISK, UNTIL THE ARCHITECT HAS BEEN
<br />NOT IFIED IN WRITING AND WRITTEN DETERMINATION IS MADE BY THE ARCHITECT. WHERE
<br />COMPLETED OR PARTIALLY COMPLET ED WORK IS DISCOVERED TO BE IN VIOLAT ION WITH
<br />APPLICABLE LAWS, CODES, REGULATIONS AND ORDINANCES, CONTRACTOR SHALL BE
<br />REQUIRED TO REMOVE THAT WORK F ROM THE PROJECT AND REPLACE SUCH WORK WITH ALL
<br />NEW COMPLYING WORK AT NO ADDITIONAL COST TO T HE OWNER.
<br />DIMENSIONING NOTES
<br />1. THE DRAWINGS REF LECT GENERAL ARRANGEMENT, DESIGN AND EXTENT OF WORK,
<br />AND ARE NOT TO BE SCALED FOR MEASUREMENTS. THE DRAWINGS ARE PARTLY
<br />DIAGRAMMATIC AND ARE NOT INTENDED TO BE AN EXACT REPRESENTATION OF
<br />FIELD CONDITIONS OR TO SERVE AS T HE CONTRACTOR'S SHOP DRAWINGS.
<br />2. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS TAKE PRECEDENCE. DIMENSIONS
<br />SHALL GOVERN AND LARGE SCALE DETAILS SHALL GOVERN OVER SMALLER SCALE
<br />DRAWINGS.
<br />3. "EXISTING", "(+/-)", "SIZE TO FIT", F.V. AND SIMILAR PHRASES REQUIRE THE CONTRACTOR
<br />TO VERIFY AND COORDINATE DIMENSIONS AND CONDITIONS INDICATED IN THE
<br />DRAWINGS WITH THE ACTUAL FIELD CONDITIONS. DISCREPANCIES SHALL BE REPORTED
<br />TO THE ARCHITECT FOR DIRECTION ON HOW TO PROCEED.
<br />4.U.O.N., DIMENSIONS ARE SHOWN TO CENTERLINE OF COLUMNS, TO FACE OF
<br />CONCRET E, OR TO F ACE OF FINISH OF EXTERIOR AND INTERIOR PARTITION. ALL CEILING
<br />HEIGHTS INDICATED ARE FROM FINISH OF FLOOR TO FINISH OF CEILING.
<br />5. DOORS NOT DIMENSIONED AND SHOWN JAMB TIGHT SHALL BE SET 4"
<br />FROM PERPENDICULAR WALL TO OUTER EDGE OF DOOR JAMB.
<br />6.U.N.O., RECEPTACLES APPEARING NEXT TO EACH
<br />OTHER ON THE PLAN BUT NOT DIMENSIONED SHALL BE EIGHT (8") APART
<br />AS MEASURED FROM CENTERLINE TO CENTERLINE.
<br />7. UNLESS OTHERWISE NOTED, RECEPTACLES SHALL BE FIFTEEN
<br />(15") INCHES IN HEIGHT ABOVE THE FINISHED FLOOR (AS MEASURED
<br />FROM THE RECEPTACLE CENTERLINE TO THE F LOOR DAT UM)
<br />8.U.N.O., ADJACENT COVERPLATES WITH DIFFERING
<br />SIZES SHALL BE CONFIGURED SO THAT T HE TOPS ALIGN AS F OLLOWS:
<br />9.WHEN ADJACENT COVERPLATES ARE THE SAME SIZE, THE
<br />CONFIGURATIONS SHALL BE AS FOLLOWS:
<br />10.U.O.N. CEILING FIXTURES AND EQUIPMENT ARE TO BE CENTERED ON CEILING TILES
<br />WHEN IN LAY-IN CEILINGS.
<br />11.U.O.N. LIGHT FIXTURES ON HARD SURFACE CEILINGS SHALL BE CENTER IN THE ROOM.
<br />12.U.O.N. SCONCE LIGHTING AT PLUMBING FIXTURES SHALL BE CENTER ON THE
<br />FIXTURE.
<br />13.ALL UNDERCABINET TASK LIGHTING SHALL BE INSTALLED AS CLOSE AS POSSIBLE TO
<br />THE BACK WALL AND CENTERED BELOW THE CABINETS.
<br />14. WALLS NOT DIMENSIONED SHALL ALIGN WITH EXISTING WALLS OR BE ABUTTED OR
<br />APPLIED TO EXISTING WALLS PER DRAWINGS.
<br />CONTRACTOR'S RESPONSIBILITY
<br />1.CONTRACTOR SHALL CONTACT THE OWNER 48 HOURS IN ADVANCE OF ANY RESTRICTION OF
<br />OWNER ACCESS OR UTILITY OUTAGES. AUTHORIZATION FROM OWNER TO BE RECEIVED IN
<br />WRITING.
<br />2.IN THE EVENT THE UTILIT Y SERVICE IS INTERRUPTED WITHOUT THE REQUIRED 48 HOURS
<br />NOT ICE, THEN T HE CONTRACTOR SHALL BE FINANCIALLY LIABLE F OR ALL DAMAGES SUFFERED
<br />BY THE OWNER DUE TO T HE UNAUTHORIZED INTERRUPTION. RECONNECTION SHALL BE MADE
<br />IMMEDIATELY.
<br />3.CONTRACTOR SHALL VISIT THE SITE TO AS TO FAMILIARIZE WITH EXISTING CONDITIONS
<br />AND SATISFY THEMSELVES TO T HE NATURE AND SCOPE OF THE WORK. SUBMISSIONS OF
<br />PROPOSALS SHALL BE CONSTRUED AS EVIDENCE THAT SUCH EXAMINATION HAS BEEN MADE
<br />AND LATER CLAIMS FOR LABOR, EQUIPMENT OR MAT ERIALS REQUIRED, OR FOR DIFFICULTIES
<br />ENCOUNTERED WHICH COULD HAVE BEEN FORESEEN WITH SUCH EXAMINATION WILL NOT BE
<br />RECOGNIZED.
<br />4.CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO BEGINNING WORK.
<br />AT ANY TIME SHOULD CONDITIONS ARISE WHEREIN THE INTENT OF T HE DRAWINGS IS IN DOUBT
<br />OR WHERE THERE IS A DISCREPANCY BETWEEN THE DRAWINGS AND FIELD CONDITIONS THE
<br />ARCHITECT SHALL BE NOTIFIED IMMEDIATELY IN WRITING FOR CLARIFICATION.
<br />5.THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAF ETY.
<br />SAFETY OF ALL PARTIES PRESENT ON THE JOB SITE IS SOLELY THE CONTRACTOR'S
<br />RESPONSIBILITY.
<br />6.THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY AND CHARGE OF AND SHALL BE
<br />RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR
<br />PROCEDURES, FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK,
<br />FOR THE ACTS OR OMISSIONS OF THE CONTRACTOR, SUBCONTRACTOR OR ANY OTHER
<br />PERSONS PERFORMING ANY WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
<br />7.PROVIDE CONTINUOUS INSPECTION IN ACCORDANCE WITH THE BUILDING CODE FOR
<br />REINFORCED CONCRETE. PLACEMENT OF REINFORCING STEEL, STRUCTURAL STEEL,
<br />WELDING, STRUCTURAL MASONRY, FIELD WELDING AND HIGH STRENGTH BOLTS.
<br />8.CONTRACTOR TO SCHEDULE CONSTRUCTION ACTIVITIES TO HAVE THE LEAST IMPACT ON
<br />EXISTING FUNCTIONS, CONTAIN ACTIVITIES SUCH AS THE USE OF JACKHAMMERS SHALL BE
<br />SCHEDULED AT SPECIAL TIMES. CONTACT THE DESIGNATED NOISE DISTURBANCE
<br />COORDINATOR FOR SCHEDULING OF ALL ACTIVITIES.
<br />9.CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING HVAC FILT ERS WITHIN
<br />AREAOF WORK.
<br />10.CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF AND WHERE REQUIRED BY THE
<br />OSHPD FIRE MARSHAL, THE OPERATIONAL MAINTENANCE OF FIRE LIFE SAFETY DEVICES WITHIN
<br />THE AREA OF WORK.
<br />EXISTING CONDITIONS
<br />1.U.N.O. SURFACES ADJOINING AREAS OF DEMOLIT IONS AND/OR NEW WORK SHALL BE
<br />PATCHED AND REFINISHED AS REQUIRED TO MATCH ADJACENT SURFACES IN ALL ASPECTS,
<br />INCLUDING FINISH MATERIAL, COLOR, TEXTURE, FIRE RATING AND SUBSTRATE.
<br />2.PATCH SURFACES WHERE AFFECTED BY INSTALLATION OF NEW MECHANICAL, ELECTRICAL
<br />AND STRUCTURAL IT EMS. MATCH EXISTING ADJACENT SURFACES AND FINISHES EXCEPT
<br />WHERE OTHERWISE NOT ED OR INDICATED.
<br />3.WHERE NEW WALL OR CEILING CONTINUES EXISTING WALL OR CEILING, ALIGN VISIBLE NEW
<br />SURFACE WITH EXISTING. ADJUST AND STAGGER STUDS IF REQUIRED TO ALIGN STUDS IF
<br />REQUIRED TO ALIGN FACE OF WALLS.
<br />4.THE CONTRACTOR SHALL SUPERVISE ALL CUTT ING, PATCHING, REPAIRING, RESTORING, AND
<br />ANY NECESSARY ACTION TO COMPLETE THE WORK. THE CONTRACTOR SHALL REST ORE
<br />AND MATCH ANY DAMAGED WORK TO THE ORIGINAL CONDITION TO T HE ARCHITECT'S
<br />SATISFACTION.
<br />5.EXISTING CONDITIONS AND OPERATIONS SHALL BE DOCUMENTED PRIOR TO INIT IATION OF
<br />RENOVAT ION AND/ OR NEW CONSTRUCTION PROJECTS. THIS SHALL INCLUDE
<br />DOCUMENTATION OF EXISTING MECHANICAL/ELECTRICAL/ STRUCTURAL CAPACITIES AND
<br />QUANTITIES. DOCUMENTATION OF EXISTING CONDITIONS SHOULD INCLUDE THE FOLLOWING:
<br />A. FIRE SUPPRESSION, DETECTION, AND ALARM SYSTEMS
<br />B. VARIOUS COMMUNICATIONS SYSTEMS (INCLUDING TELEPHONE, NURSE CALL,
<br /> OVERHEAD PAGING, TELEMETRY, DICTATION, ELECTRONIC IMAGING)
<br /> VARIOUS PLUMBING SYSTEMS (INCLUDING DOMESTIC WATER, TREATED WATER,
<br /> WASTEWATER, PNEUMATIC TUBE, PNEUMATIC CONTROLS, MEDICAL GASES/
<br /> VACUUM)
<br />C. EXISTING AIRFLOW OF AFFECTED AREAS
<br />D. MAIN ELECTRICAL SERVICE AND ELECTRICAL SERVICE AFFECTED BY
<br /> CONSTRUCTION (INCLUDING RATING AND ACTUAL LOAD/PEAK AND FEEDER SIZES
<br /> AS APPLICABLE AND POWER FACTOR)
<br />E. EMERGENCY POWER SYSTEM (INCLUDING RATING AND ACTUAL LOAD/PEAK AND
<br /> FEEDER SIZES, AS APPLICALE, FOR LIFE SAFETY, EMERGENCY/CRITICAL, AND
<br /> EQUIPMENT BRANCHES)
<br />DEMOLITION
<br />1.CONTRACTOR SHALL VERIFY THE LOCAT ION OF ALL EXISTING UTILITIES PRIOR TO
<br />COMMENCING CONSTRUCTION AND SHALL TAKE STEPS TO PROTECT SUBJECT UTILITIES,
<br />PERSONNEL AND PROPERTY AGAINST DAMAGE OR INJURY.
<br />2.CONTRACTOR SHALL VERIFY LOCATION OF ALL REINFORCING STEEL AND CONDUIT IN
<br />EXISTING CONCRETE SLABS AND AVOID SAME. CONTRACTOR SHALL PREPARE SHOP
<br />DRAWINGS FOR REVIEW BY THE ARCHITECT AND/OR SEOR PRIOR TO PROCEEDING WITH
<br />CORE OR SAW-CUTTING.
<br />3.ALL REMOVED F IXTURES, EQUIPMENT , ACCESSORIES AND DOORS SHALL BE SALVAGED TO
<br />THE OWNER. ITEMS NOT WANTED BY OWNER SHALL BE DISCARDED OFF -SITE BY THE
<br />CONTRACTOR.
<br />4.TEMPORARY STORAGE OF EQUIPMENT SHALL BE PROT ECTED FROM VANDALISM. STORE IN
<br />A LOCATION THAT IS ACCEPTABLE TO THE OWNER.
<br />5.PROTECT ALL ADJACENT AREAS FROM DUST, FUMES, SMOKE, WATER, WEATHER AND
<br />NOISE.
<br />6.PROTECT ALL ADJACENT BUILDING COMPONENTS -FINISHES AND EQUIPMENT. SHOULD
<br />DAMAGE OCCUR, REPAINT, PATCH OR REPLACE AT NO ADDITIONAL COST T O THE OWNER.
<br />7.THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTINUOUS CLEAN UP OF THE SITE OF
<br />ALL DEBRIS WHETHER CREATED BY THE CONTRACTOR'S WORK OR THE FAILURE OF THE
<br />CONTRACTOR'S SUB-CONTRACTORS TO CLEAN UP AFTER THEIR WORK.
<br />8.ALL ABANDONED PLUMBING LINES, ELECTRICAL CONDUIT OR BOXES, A/C DUCTS OR
<br />DIFFUSERS AND TELEPHONE CABLES WILL BE REMOVED BACK TO CLOSEST FEEDER POINT.
<br />9.DO NOT CUT, DRILL, NOTCH, CORE, ALTER, OR DAMAGE STRUCTURAL ELEMENTS OR F RAMING
<br />UNLESS SPECIFICALLY DETAILED ON APPROVED PLANS OR ACCEPTED BY THE SEOR/AOR.
<br />FIRE AND LIFE SAFETY MEASURES
<br />1.REQUIRED MEANS OF EGRESS SHALL BE MAINTAINED DURING CONST RUCTION AND DEMOLIT ION AT
<br />ALL TIMES.
<br />2.TEMPORARY EXITING SHALL BE APPROVED BY THE LOCAL FIRE AUTHORITY. (CFC -2022, SECTION
<br />3312.2)
<br />3.PROVIDE FIRE EXTINGUISHERS AS REQUIRED BY THE LOCAL F IRE AUTHORITY.
<br />4.CONTRACTOR SHALL PROVIDE PROPER FIRE STOPPING AT EXISTING OR NEW FLOOR AND WALL
<br />PENETRATIONS FOR MECHANICAL, PLUMBING, ELECTRICAL AND F IRE SPRINKLER LINES AS
<br />REQUIRED PER THE APPROPRIATE UL DESIGN LISTING NUMBER.
<br />5.FIRE PROT ECTION SYSTEM SHALL BE MAINTAINED OPERATIONAL AT ALL TIMES DURING
<br />ALTERATION.
<br />6.SMOKE DET ECTORS SHALL BE COVERED OR REMOVE DURING ALTERAT ION WHEN REQUIRED BY THE
<br />LOCAL FIRE AUTHORITY, COVERINGS PLACED ON OR OVER FIRE PROTECTION DEVICES TO PROTECT
<br />THEM FROM DAMAGE DURING CONSTRUCTION PROCESSES SHALL BE IMMEDIATELY REMOVED UPON
<br />THE COMPLETION OF THE CONSTRUCTION PROCESSES IN THE ROOM OR AREA IN WHICH T HE DEVICES
<br />ARE INSTALLED. (CFC -2022, SECTION 3308.9)
<br />7.FIRE RESISTIVE RATED CONST RUCTION SHALL BE MAINTAINED AT ALL TIMES DURING
<br />CONSTRUCTION. (CFC -2022, SECTION 703.1)
<br />8.CUTT ING AND WELDING OPERATION SHALL BE IN ACCORDANCE WITH CHAPTER 35 OF THE FIRE
<br />CODE. (CFC -2022, SECTION 3305.6)
<br />NONCONFORMING CONDITIONS
<br />IN T HE EVENT THAT AN EXISTING NONCONFORMING CONDITION IS DISCOVERED DURING THE COURSE OF
<br />CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND ARCHITECT. THE ARCHITECT
<br />AND THE IOR WILL WORK WITH THE LOCAL FIRE AUTHORITY TO DETERMINE THE NECESSARY COURSE OF
<br />ACTION WITH REGARD TO THE EXISTING ELEMENT.
<br />TEMPORARY CONSTRUCTION
<br />1.CONTRACTOR SHALL ARRANGE FOR, IN ADVANCE WITH THE OWNER, CONSTRUCTION
<br />STORAGE AND ST AGING AREAS NECESSARY TO COMPLETE THE WORK. ALL STORAGE AND
<br />STAGING AREAS SHALL BE RETURNED TO THE OWNER IN LIKE ORIGINAL CONDITION.
<br />2.THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS TO PROTECT FINISHED PARTS OF
<br />THE MATERIALS AND EQUIPMENT AGAINST DAMAGE FROM ANY CAUSE DURING THE
<br />PROGRESS OF THE WORK AND UNTIL ACCEPTANCE BY THE OWNER.
<br />3.CONTRACTOR SHALL MAKE EVERY EFFORT TO MAINTAIN A CLEAN WORK PLACE. DUST
<br />PALLIATION AND PREVENTION OF DUST CONTAMINATION OF NON-WORK SPACES WILL BE
<br />THE RESPONSIBILITY OF T HE CONTRACTOR ON AN ON GOING, DAILY BASIS. THE
<br />CONTRACTOR SHALL DEVELOP A SCHEDULE OF CONST RUCTION WHICH INCLUDES THE
<br />NECESSARY ACTIONS TO MAINTAIN THE OPERATION OF THE TENANTS DURING THE
<br />CONSTRUCTION PROCESS.
<br />4.CONTRACTOR SHALL MAKE NECESSARY CONNECTIONS TO EXISTING UTILIT IES F OR
<br />TEMPORARY POWER AND WATER SUPPLIES, AND SHALL COORDINATE SUCH USE WITH THE
<br />OWNER PRIOR TO CONNECTION.
<br />15" MIN.
<br />15" MIN.
<br />8"
<br />ALIGN
<br />ALIGN
<br />COVER PLATE
<br />FLOOR DATUM
<br />ALIGN
<br />ALIGN
<br />FLOOR DATUM
<br />COVER PLATE
<br />FACILITY NAME:HARBOR MACARTHUR MEDICAL OFFICE BUILDING
<br />FACILITY ADDRESS:3401 S. HARBOR BLVD.
<br />SANTA ANA, CA 92704
<br />PROJECT NAME:SOCC 2022 R HBM 1ST FLR KPOJ REMODEL
<br />CONSTRUCTION INF ORMATION
<br />CONSTRUCTION TYPE:II-B
<br />MAIN OCCUPANCY:B (MEDICAL OFFICE BUILDING)
<br />YEAR OF CONSTRUCTION:PHASE I: 2000, PHASE II, PHASE III: 2002
<br />FIRE EXTINGUISHING SYSTEM:FULLY SPRINKLERED
<br />NUMBER OF STORIES:3
<br />AREA LIMITATIONS:UNLIMITED
<br />REMODEL INFORMATION
<br />REMODEL FLOOR:1ST FLR
<br />REMODEL USE/OCCUPANCY:B (OFFICES)
<br />TOTAL REMODEL AREA:2195 SF
<br />PROJECT SCOPE:
<br />THE PROJECT INCLUDES THE REMODEL OF AN EXISTING OFFICE SPACE INTO A NEW A CLINIC SPACE
<br />FOR THE KPOJ DEPARTMENT. THE REMODEL WILL INCLUDE AN OFFICE AREA FOR 4 PROVIDERS,
<br />CLINICAL AREA WITH 4 EXAM ROOMS, 1 MED PREP, 1 PATIENT TOILET, 1 AUDIOLOGY TESTING ROOM, 1
<br />ULT RASOUND ROOM, AND 4 STAFF STATIONS.
<br />GENERAL PROVISIONS
<br />1.ALL WORK SHALL CONFORM TO THE CURRENT EDITIONS OF NATIONAL, STATE AND
<br />LOCAL CODES, AND OTHER REGULAT ORY AGENCIES WHICH HAVE AUTHORITY OVER ANY
<br />PORTION OF THE WORK. ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING
<br />GENERAL CONSTRUCTION, MECHANICAL, ELECTRICAL, PLUMBING, OR RELATED WORK SHALL
<br />COMPLY WITH APPLICABLE SECTIONS OF THE CODES THAT HAVE JURISDICTION, INCLUDING
<br />BUT NOT LIMITED TO:
<br />2022 CALIFORNIA ADMINISTRATIVE CODE (CAC)
<br />CALIFORNIA CODE OF REGULATIONS I TITLE 24, PART 1
<br />2022 CALIFORNIA BUILDING CODE (CBC)
<br />CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 2
<br />(BASED ON THE 2018 INTERNATIONAL BUILDING CODE)
<br />2022 CALIFORNIA ELECTRICAL CODE (CEC)
<br />CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 3
<br />(BASED ON THE 2017 NAT IONAL ELECTRICAL CODE)
<br />2022 CALIFORNIA MECHANICAL CODE (CMC)
<br />CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 4
<br />(BASED ON THE 2018 UNIF ORM MECHANICAL CODE)
<br />2022 CALIFORNIA PLUMBING CODE (CPC)
<br />CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 5
<br />(BASED ON THE 2018 UNIF ORM PLUMBING CODE)
<br />2022 CALIFORNIA FIRE CODE (CFC)
<br />CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 9
<br />(BASED O THE 2018 INTERNATIONAL FIRE CODE)
<br />2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN CODE)
<br />CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 11
<br />TITLE 19, CALIFORNIA CODE OF REGULATIONS (CCR)
<br />DIVISION 1, STATE F IRE MARSHAL REGULATIONS
<br />2022 CALIFORNIA BUILDING CODE CHAPTER 35 REFERENCE STANDARDS
<br />NFPA 13-22: STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
<br />NFPA 72-22: NAT IONAL F IRE ALARM AND SIGNAL CODE WIT H CALIFORNIA AMENDMENTS
<br />2.ALL WORK AND MATERIALS SHALL BE IN F ULL ACCORDANCE WITH THE REQUIREMENTS OF
<br />THESE CODES AND ALL APPLICABLE LOCAL ORDINANCES. WHERE CONTRACT DOCUMENTS
<br />EXCEED SUCH REQUIREMENTS, WITHOUT VIOLATING SUCH CODES, REGULATIONS AND
<br />ORDINANCES, CONTRACT DOCUMENTS TAKE PRECEDENCE. WHERE CODES CONFLICT, THE
<br />MORE STRINGENT SHALL APPLY.
<br />INFECTION CONTROL RISK ASSESSMENT (ICRA)
<br />THE INFECTION CONTROL RISK ASSESSMENT IS A MULT IDISCIPLINARY, DOCUMENTED
<br />ASSESSMENT PROCESS INTENDED TO PROACTIVELY IDENTIFY AND MITIGATE RISKS FROM
<br />INFECTION THAT COULD OCCUR DURING CONSTRUCTION ACTIVITIES. THIS PROCESS IDENTIFIES
<br />AND TAKES INTO ACCOUNT THE PATIENT POPULATION AT RISK, THE NATURE AND SCOPE OF THE
<br />PROJECT, AND THE FUNCTIONAL PROGRAM OF THE HEALTH CARE FACILITY. THE ICRA
<br />DETERMINES THE POTENTIAL RISK OF TRANSMISSION OF VARIOUS AIR-AND WATERBORNE
<br />BIOLOGICAL CONTAMINANTS IN THE FACILITY.
<br />ICRA TIMING
<br />AN ICRA SHALL BE CONDUCTED BEFORE CONSTRUCTION BEGINS, AND CONTINUE THROUGH
<br />PROJECT CONSTRUCTION AND COMMIS SIONING.
<br />ICRA TEAM
<br />AT MINIMUM, AN ICRA SHALL BE CONDUCTED BY A TEAM WITH EXPERTISE IN INFECTION
<br />PREVENTION AND CONTROL, DIRECT PATIENT CARE (CLINICAL USE OF RELEVANT AREAS), FACIL-
<br />ITY DESIGN, CONSTRUCTION, AND HVAC AND PLUMBING SYSTEMS WHEN THESE SYSTEMS ARE
<br />INVOLVED. THE SCOPE AND NATURE OF THE PROJECT SHALL DICTATE OTHERS TO BE INVOLVED.
<br />ICRA CONSIDERATIONS
<br />THE ICRA SHALL ADDRESS, BUT NOT BE LIMITED TO COVER ING, THE FOLLOWING:
<br />• NUMBER, LOCATION, AND TYPE OF AIRBORNE INFECTION ISOLATION AND PROT ECTIVE
<br />ENVIRONMENT ROOMS.
<br />• NUMBER, LOCAT ION, AND TYPE OF PLUMBED HAND-WASHING STATIONS, HAND
<br />SANITATION DISPENSERS, AND EMERGENCY FIRST -AID EQUIPMENT (EYEWASH STATIONS
<br />AND DELUGE SHOWERS).
<br />(1) T HE NUMBER AND LOCATION OF HAND-WASHING STATIONS AND HAND
<br />SANITATION
<br />DISPENSERS SHALL BE DETERMINED BY THE FUNCTIONAL PROGRAM AND THE
<br />ICRA.
<br />(2) HAND-WASHING STATIONS SHALL BE CONVENIENT AND ACCESSIBLE FOR
<br />HEALTH CARE PERSONNEL AND OTHER USERS.
<br />• SPECIAL HVAC NEEDS TO MEET THE FUNC TIONAL PROGRAM AND ACCOMMODATE T HE
<br />SERVICES (E.G., SURGICAL SERVICES, AIRBORNE INFECTION ISOLATION AND PRO-
<br />TECTIVE ENVIRONMENT ROOMS, LABORATORIES, PHARMACIES, LOCAL EXHAUST
<br />SYSTEMS FOR HAZARDOUS AGENTS, AND OTHER SPECIAL AREAS) INCLUDED IN OR
<br />AFF ECTED BY THE PROJECT
<br />• WATER SYSTEMS TO LIMIT LEGIONELLA SP. AND WATERBORNE OPPORTUNISTIC
<br />PATHOGENS
<br />WHEN CONDUCTING THE ICRA AND DEVELOPING THE INFEC TION CONTROL RISK MITIGATION
<br />REQUIREMENTS FOR BUILDING AND SITE AREAS ANTICIPATED T O BE AFFECTED BY CONSTRUC-
<br />TION, THE FOLLOWING SHALL BE ADDRESSED:
<br />• THE IMPACT OF DISRUPTING ESSENTIAL SERVICES TO PATIENTS AND EMPLOYEES
<br />• DET ERMINATION OF THE SPECIFIC HAZARDS AND PROTECTION LEVELS FOR EACH
<br />DESIGNATED AREA
<br />• LOCATION OF PATIENTS ACCORDING TO THEIR SUSCEPTIBILITY TO INFECTION AND THE
<br />DEFINITION OF RISKS TO EACH
<br />• IMPACT OF MOVEMENT OF DEBRIS, TRAFFIC FLOW, SPILL CLEANUP, AND TESTING AND
<br />CERTIFICATION OF INSTALLED SYSTEMS
<br />• ASSESSMENT OF EXTERNAL AS WELL AS INTERNAL CONSTRUCTION ACTIVITIES
<br />• LOCATION OF KNOWN HAZARDS
<br />ICRA DOCUMENTATION
<br />THIS WRITTEN RECORD SHALL REMAIN AN ACTIVE PART OF THE PROJECT DOCUMENT S FOR THE
<br />DURATION OF THE CONSTRUCTION PROJECT AND THROUGH COMMISSIONING.
<br />ICRMRS
<br />THESE WRITTEN PLANS SHALL DESCRIBE THE SPECIFIC METHODS BY WHICH TRANSMISSION OF
<br />AIR-AND WATERBORNE BIOLOGICAL CONTAMINANTS WILL BE AVOIDED DURING CONST RUCTION
<br />AS WELL AS DURING COMMISSIONING, WHEN HVAC AND PLUMBING SYSTEMS AND EQUIPMENT
<br />(E.G., ICE MACHINES, STEAM STERILIZATION SYSTEMS) ARE STARTED/RESTARTED.
<br />MONITORING PL AN AND PROCEDURES
<br />(1) THE OWNER SHALL PROVIDE MONITORING PLANS FOR EFFECTIVE APPLICATION OF ICRMRS
<br />DURING T HE COURSE OF THE PROJECT.
<br />(2) PROVISIONS FOR MONITORING SHALL INCLUDE WRITTEN PROCEDURES FOR EMERGENCY
<br />SUSPENSION OF WORK AND PROTECTIVE MEASURES INDICATING THE RESPONSIBILITIES AND
<br />LIMITAT IONS OF EACH PARTY (OWNER, DESIGNER, CONTRACTOR, AND MONITOR).
<br />• RESPONSIBILITIES OF PERSONS AND GROUPS FOR PROCEDURES AND ACTIVITIES TO BE
<br />PERFORMED TO MITIGATE RISK SHOULD BE INCLUDED IN INFECTION CONTROL RISK
<br />MITIGATION PLANS TO ENSURE THE PROPER ACTIONS ARE TAKEN AT THE PROPER TIME.
<br />• MONITORING EF FORTS WILL BE DETERMINED BY THE OWNER AND MAY BE CONDUCTED
<br />BY THE OWNER’S INFECTION PREVENTIONIST(S), EPIDEMIOLOGIST, CONSTRUCTION
<br />COORDINATORS, AND/OR SAFETY STAFF OR BY INDEPENDENT OUTSIDE CONSULTANTS.
<br />COMMUNICATION
<br />(1) UPDATES ON ICRA COMPLIANCE SHALL BE PROVIDED BY T HE ICRA TEAM.
<br />(2) CHANGES TO THE ORIGINAL DESIGN PLANS SHALL BE DOCUMENTED, UPDATED, AND
<br />CONTINUOUSLY SHARED BETWEEN THE ICRA TEAM AND THE DESIGNERS/
<br />ARCHITECTS/PLANNERS, OWNER, AND CONTRACTOR.
<br />INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS
<br />INFECTION CONT ROL RISK MITIGATION RECOMMENDAT IONS (ICRMRS) SHALL BE PREPARED BY
<br />THE ICRA TEAM AND SHALL, AT MINIMUM, ADDRESS THE F OLLOWING:
<br />1. PATIENT PLACEMENT AND RELOCATION
<br />• STANDARDS FOR BARRIERS AND OTHER PROTECTIVE MEASURES REQUIRED TO
<br />PROTECT ADJACENT AREAS AND SUSCEPTIBLE PATIENTS FROM AIRBORNE
<br />CONTAMINANTS
<br />• TEMPORARY PROVISIONS OR PHASING FOR CONSTRUCTION OR MODIFICATION OF HVAC
<br />AND WATER SUPPLY SYSTEMS
<br />• PROTECTION FROM DEMOLITION
<br />• MEASURES TO BE TAKEN TO TRAIN HOSPITAL STAFF, VISITORS, AND CONSTRUCTION
<br />PERSONNEL
<br />• THE IMPACT OF POTENTIAL UTILITY OUTAGES OR EMERGENCIES, INCLUDING
<br />PROTECTION OF PATIENTS DURING PLANNED AND UNPLANNED UTILITY OUTAGES.
<br />SPECIFIC HAZARDS THAT ARE LIKELY IN THE EVENT OF DIFFERENT TYPES OF ESSENTIAL
<br />SERVICE DISRUPTIONS SHOULD BE PROACTIVELY DETERMINED. A PLAN SHOULD BE
<br />DEVELOPED TO ENSURE CONTINUED PROVISION OF SERVICE IN THE EVENT OF PLANNED
<br />AND UNPLANNED DISRUPTIONS.
<br />• THE IMPACT OF MOVEMENT OF DEBRIS, TRAFFIC FLOW, CLEANUP, ELEVATOR USE FOR
<br />CONSTRUCTION MATERIALS AND CONSTRUCTION WORKERS, AND CONSTRUCTION
<br />WORKER ROUTES
<br />2. VENTILATION OF THE CONSTRUCTION ZONE
<br />• AIRFLOW INTO THE CONSTRUCTION ZONE FROM OCCUPIED SPACES SHOULD BE
<br />MAINTAINED BY MEANS OF A DEDICATED VENTILATION/EXHAUST SYSTEM FOR THE
<br />CONSTRUCTION AREA. ENSURE PROPER OPERATION OF THE AIR -HANDLING SYSTEM IN
<br />THE AFFECTED AREA AFTER ERECTION OF BARRIERS AND BEFORE THE ROOM OR AREA
<br />IS SET TO NEGATIVE PRESSURE
<br />• LOCATIONS OF EXHAUST DISCHARGE RELATIVE TO EXISTING FRESH AIR INTAKES AND
<br />FILTERS, AS WELL AS THE DISCONNECTION AND SEALING OF EXISTING AIR DUCTS,
<br />SHOULD BE REVIEWED AS REQUIRED BY THE ICRA.
<br />• IF THE EXISTING BUILDING SYSTEM OR A PORTION THEREOF IS USED TO ACHIEVE THIS
<br />REQUIREMENT, THE SYSTEM SHOULD BE THOROUGHLY CLEANED PRIOR TO OCCUPANCY
<br />OF THE CONSTRUCTION AREA.
<br />• HOSPITAL CONSTRUCTION BARRIERS FOR PROJECTS IN HIGH-RISK AREAS SHOULD BE
<br />MAINTAINED AT A PRESSURE DIFFERENTIAL OF AT LEAST 0.03 INCH WATER GAUGE (7.0
<br />PASCALS), WIT H AIRFLOW FROM HOSPITAL CLEAN AREAS TO CONSTRUCTION DIRTY
<br />AREAS. CONSTRUCTION BARRIERS IN HIGH-RISK AREAS SHOULD HAVE VISUAL DISPLAY
<br />OF AIRFLOW DIRECTION. (HIGH -RISK AREAS INCLUDE CRITICAL CARE UNITS, EMERGENCY
<br />ROOMS, LABOR AND DELIVERY FACILITIES, NEWBORN NURSER IES, OUT PATIENT
<br />SURGERY FACILITIES, AREAS SERVING PEDIATRIC PATIENTS, PHARMACIES, SURGICAL
<br />UNITS, POST-ANESTHETIC CARE UNITS, AREAS SERVING IMMUNOCOMPROMISED
<br />PATIENTS, BURN UNITS, CARDIAC CATHETERIZATION LABS, CENTRAL STERILE SUPPLY,
<br />AIRBORNE INFECTION ISOLATION ROOMS, PROTECTIVE ENVIRONMENT ROOMS,
<br />ONCOLOGY UNITS, OPERAT ING ROOMS, AND CESAREAN DELIVERY ROOMS.) MONITOR
<br />BARRIERS AND ENSURE INTEGRITY OF THE CONSTRUCTION BARRIERS; REPAIR GAPS OR
<br />BREAKS IN BARRIER JOINTS
<br />3. DISASTER PLANS FOR WATER SUPPLY AND VENTILATION EMERGENCIES
<br />• THE OWNER SHOULD PROVIDE A WRITTEN PLAN FOR WHAT WILL HAPPEN IN THE EVENT
<br />OF A WATER OUTAGE. THIS SHOULD INCLUDE WHERE SUPPLIES ARE, WHO IS
<br />RESPONSIBLE FOR WHAT, AND WHO IS TO BE NOTIFIED.
<br />• THE OWNER SHOULD PROVIDE A WRITTEN PLAN FOR WHAT WILL HAPPEN IN THE EVENT
<br />OF AN AIR SHUTDOWN. THIS SHOULD INCLUDE WHO IS RESPONSIBLE FOR WHAT AND
<br />WHO IS TO BE NOTIF IED.
<br />• THE OWNER SHOULD PROVIDE A WRITTEN PLAN FOR WHAT WILL HAPPEN IN THE EVENT
<br />OF A WATER LEAK. T HIS SHOULD INCLUDE WHO IS TO BE NOTIFIED.
<br />4. CONSTRUCTION WORK ZONE PROTECTION
<br />• CONSTRUCTION MATERIALS SHOULD BE KEPT CLEAN AND DRY, AS APPROPRIATE.
<br />• DUCTWORK SHOULD BE KEPT CAPPED/CLEAN DURING DEMOLITION AND DUST-
<br />GENERATING CONSTRUCTION.
<br />• DRYWALL INSTALLATION SHOULD NOT PROCEED UNTIL EXTERIOR PROTECTION AGAINST
<br />RAIN DAMAGE HAS BEEN INSTALLED.
<br />• CONSTRUCT BARRIERS TO PREVENT DUST FROM CONSTRUCTION AREAS FROM
<br />ENTERING PATIENT-CARE AREAS; ENSURE THAT BARRIERS ARE IMPERMEABLE TO
<br />FUNGAL SPORES AND IN COMPLIANCE WITH LOCAL FIRE CODES
<br />• SEAL OFF AND BLOCK RETURN AIR VENTS IF RIGID BARRIERS ARE USED FOR
<br />CONTAINMENT
<br />• IMPLEMENT DUST-CONTROL MEASURES ON SURFACES AND DIVERT PEDESTRIAN
<br />TRAFFIC AWAY FROM WORK ZONES.
<br />• CLEAN WORK ZONES AND THEIR ENTRANCES DAILY BY
<br />1) WET-WIPING TOOLS AND TOOL CARTS BEFORE THEIR REMOVAL FROM THE WORK
<br />ZONE
<br />2) PLACING MATS WITH TACKY SURFACES INSIDE THE ENTRANCE
<br />3) COVERING DEBRIS AND SECURING THIS COVERING BEFORE REMOVING DEBRIS FROM
<br />THE WORK ZONE
<br />• IN PATIENT -CARE AREAS, FOR MAJOR REPAIRS THAT INCLUDE REMOVAL OF CEILING
<br />TILES AND DISRUPTION OF THE SPACE ABOVE THE FALSE CEILING, USE PLASTIC SHEETS
<br />OR PREFABRICATED PLASTIC UNITS TO CONTAIN DUST; USE A NEGATIVE PRESSURE
<br />SYSTEM WITHIN THIS ENCLOSURE TO REMOVE DUST; AND EITHER PASS AIR THROUGH
<br />AN INDUSTRIAL-GRADE, PORTABLE HEPA FILTER CAPABLE OF F ILTRATION RATES OF
<br />300 -800 FT3/MIN., OR EXHAUST AIR DIRECTLY TO T HE OUTSIDE
<br />• UPON COMPLETION OF THE PROJECT, CLEAN THE WORK ZONE ACCORDING TO FACILITY
<br />PROCEDURES, AND INSTALL BARRIER CURTAINS TO CONTAIN DUST AND DEBRIS BEFORE
<br />REMOVING RIGID BARRIERS. FLUSH THE WATER SYSTEM TO CLEAR SEDIMENT FROM
<br />PIPES TO MINIMIZE WATERBORNE MICROORGANISM PROLIFERATION. RESTORE
<br />APPROPRIATE ACH, HUMIDITY, AND PRESSURE DIFFERENTIAL; CLEAN OR REPLACE AIR
<br />FILTERS; DISPOSE OF SPENT FILTERS
<br />5. PROVIDE CONSTRUCTION CREWS WITH
<br />• DESIGNATED ENTRANCES, CORRIDORS, AND ELEVATORS WHEREVER PRACTICAL
<br />• ESSENTIAL SERVICES (E.G., TOILET FACILIT IES) AND CONVENIENCE SERVICES (E.G.,
<br />VENDING MACHINES)
<br />• PROTECTIVE CLOTHING (E.G., COVERALLS, FOOTGEAR, AND HEADGEAR) F OR TRAVEL TO
<br />PATIENT -CARE AREAS
<br />• A SPACE OR ANTEROOM F OR CHANGING CLOTHING AND STORING EQUIPMENT
<br />CONTRACTOR SHALL PREPARE SUBMITTAL DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS AND
<br />SUBMIT TO THE ARCHITECT OR ENGINEER FOR REVIEW PRIOR T O SUBMITTAL TO THE AGENCY
<br />HAVING JURISDICTION (AHJ) FOR APPROVAL.
<br />INSTALLATION OF DEFERRED APPROVAL SHALL NOT BE STARTED UNTIL DOCUMENTS HAVE BEEN
<br />REVIEWED BY THE ARCHIT ECT OR ENGINEER AND APPROVED BY AHJ.
<br />DEF ERRED IT EMS ARE TO BE COMPLETELY INSTALLED PRIOR TO OCCUPANCY OF BUILDING(S)
<br />AND/OR AREAS AFFECTED BY THE DEFERRED WORK.
<br />DEF ERRED APPROVALS:
<br />1. FIRE ALARM DESIGN -REWORK EXISTING SYSTEM TO CONFORM TO NEW SPACE
<br />CONFIGURATION. ADD DEVICES AS NECESSARY FOR NEW ROOMS. MATCH DEVICES TO
<br />MANUFACTURER OF CURRENT SYSTEM.
<br />2. FIRE SPRINKLER DESIGN -REWORK EXISTING SYSTEM TO CONFORM TO NEW SPACE
<br />CONFIGURATION. RELOCATE HEADS TO COVER THE AREAS AS NEEDED. BRANCH
<br />MODIFICATIONS ONLY, ALL MAIN LINES ARE EXISTING TO REMAIN. MATCH TYPE, STYLE,
<br />AND FINISH OF EXISTING SPRINKLER HEADS.
<br />3. NURSE CALL DESIGN
<br />R
<br />No.No.No.No.
<br />FFFF
<br />LLLLIIIICCCCEEEENNNNSSSSEEEE
<br />SSSSTTTTAAAATTTTEEEE
<br />DDDD
<br />OOOO
<br />AAAA RRRRCCCCHHHHIIIITTTTEEEECCCCTTTT
<br />CCCC AAAALLLL IIIIFFFFOOOORRRRNNNNIIIIAAAA
<br />SSSSTTTTEEEEPPPPHHHHEEEE WWWWHHHHIIIITTTTEEEE
<br />R ENEWAL R ENEWAL R ENEWAL R ENEWAL
<br />D AT EDATEDATEDATE
<br />CCCC----34829348293482934829
<br />NNNN
<br />08/31 /2708/31 /2708/31 /2708/31 /27
<br />SHEET T ITLE
<br />PROJECT
<br />FACILITY
<br />FAC NO:BLDG NO:FLOOR LEV:SECTION:
<br />KP PROJ. NO.
<br />PERMIT NO.
<br />555 W. Fifth Street Suite 2950 | Los Angeles, CA 90013 USA
<br />ARCHITECT
<br />CONSULTANT
<br />ARCHITECT SEAL CONSULTANT SEAL
<br />KAISER FOUNDATION HOSPITALS
<br />NATIONAL FACILITIES SERVICES
<br />180 0 HARRISON STREET OAKLAND,
<br />CALIFORNIA 94612
<br />NO.ISSUED DATE
<br />0
<br />5'
<br />50'
<br />GRAPHIC SCALES:
<br />1/16" = 1'-0"
<br />0
<br />25'
<br />1/8" = 1'-0"
<br />5'
<br />0
<br />12'
<br />1/4" = 1'-0"
<br />1'
<br />0
<br />6'
<br />1/2" = 1'-0"
<br />1'
<br />0
<br />2'
<br />1-1/2" = 1'-0"
<br />0
<br />1'
<br />3" = 1'-0"
<br />IF
<br /> THIS SHEET IS NOT
<br />30"x42", IT IS A REDUCED
<br />PRINT -
<br />SCALE
<br />ACCORDINGLY
<br />AGENCY APPLICATION NUMBER
<br />AGENCY APPROVAL STAMP
<br />THIS DOCUMENT IS THE PROPERTY OF THE OWNER AND IS
<br />NOT TO BE USED WITHOUT OWNER'S WRITTEN PERMISSION.
<br />HZ PROJ. NO.
<br />HISTORY LOG
<br />www.huitt-zollars.com
<br />Phone 310.820.4600 | Fax 310.207.4215
<br />C:\Users\lrobinson\OneDrive - Huitt-Zollars, Inc\Documents\R314412.35 KP HBM KPOJ_A24_lrobinsonL2MDX.rvt
<br />1/6/2026 2:42:31 PM
<br />SOCC 2022 R HBM 1st Fl KPOJ
<br />REMODEL
<br />G0-00
<br />TITLE SHEET, GENERAL NOTES,
<br />PROJECT DATA, SITE PLAN
<br />CA394-1 -1 -
<br />CAP027721R314412.35
<br />HARBOR/MacARTHUR MEDICAL OFF
<br />3401 S. HARBOR BLVD.
<br />SANTA ANA, CALIFORNIA 92704
<br />101125520, 20187249, 40140902
<br />3401 S. HARBOR BLVD.
<br />SANTA ANA, CALIFORNIA 92704
<br />KP NO.CAP027721
<br />SOCC 2022 R HBM 1st Fl KPOJ
<br />REMODEL
<br />N/ASYMBOLS LEGEND 12
<br />NTSVICINITY MAP 14
<br />N/ADRAWING SET ORGANIZATION 21 N/APROJECT TEAM 11 01N/ASHEET INDEX
<br />N/AGENERAL NOTES 22
<br />N/APROJECT SUMMARY 09
<br />N/AAPPLICABLE CODES 08
<br />N/AINFECTION CONTROL NOTES 16
<br />GENERAL
<br />G0-00 TITLE SHEET, GENERAL NOTES, PROJECT DATA, SITE PLAN
<br />G0-01 SPECIFICATIONS
<br />G0-02 SPECIFICATIONS
<br />G0-03 SPECIFICATIONS
<br />G0-04 SPECIFICATIONS
<br />G0-05 SPECIFICATIONS
<br />G1-00 PLAN - SITE ACCESSIBLITY
<br />G1-10 PLAN - LIFE SAFETY - 1ST FLR
<br />G1-11 PLAN - BUILDING ACCESSIBILTY - 1ST FLR
<br />STRUCTURAL
<br />S0-01 GENERAL NOTES
<br />S1-11 PLAN - REMODEL OVERALL - 1ST FLR
<br />S1-13 PLAN - REMODEL ENLARGED - 1ST FLR - CLINICAL AREA
<br />S5-01 DETAILS
<br />ARCHITECTURAL
<br />A0-11 PLAN - DEMO OVERALL - 1ST FLR
<br />A0-12 PLAN - DEMO OVERALL RCP - 1ST FLR
<br />A0-13 PLAN - DEMO ENLARGED - 1ST FLR - CLINICAL AREA
<br />A0-14 PLAN - DEMO ENLARGED - 1ST FLR - PROVIDE ENCLAVE
<br />A0-15 PLAN - DEMO ENLARGED RCP - 1ST FLR - CLINICAL AREA
<br />A0-16 PLAN - DEMO ENLARGED RCP - 1ST FLR - PROVIDER ENCLAVE
<br />A1-11 PLAN - REMODEL OVERALL - 1ST FLR
<br />A1-12 PLAN - REMODEL OVERALL RCP - 1ST FLR
<br />A1-13 PLAN - REMODEL ENLARGED - 1ST FLR - CLINICAL AREA
<br />A1-14 PLAN - REMODEL ENLARGED - 1ST FLR - PROVIDER ENCLAVE
<br />A1-15 PLAN - REMODEL ENLARGED RCP - 1ST FLR - CLINICAL AREA
<br />A1-16 PLAN - REMODEL ENLARGED RCP - 1ST FLR - PROVIDER ENCLAVE
<br />A1-17 PLAN - DIMENSIONS & PARTITION TYPE - 1ST FLR - CLINICAL AREA
<br />A1-18 PLAN - DIMENSIONS & PARTITION TYPE - 1ST FLR - PROVIDER ENCLAVE
<br />A1-41 PLAN - REMODEL - ROOF
<br />A2-01 ELEVATIONS - INTERIOR - CLINICAL AREA
<br />A2-02 ELEVATIONS - INTERIOR - CLINICAL AREA
<br />A2-03 ELEVATIONS - INTERIOR - CLINICAL AREA
<br />A2-04 ELEVATIONS - INTERIOR - CLINICAL AREA
<br />A2-05 ELEVATIONS - INTERIOR - PROVIDER ENCLAVE
<br />A2-06 ELEVATIONS - INTERIOR - PROVIDER ENCLAVE
<br />A4-01 ACCESSIBLE TOILET ROOM - PLAN & ELEVATIONS
<br />A5-01 DETAILS - PARTITION TYPES
<br />A5-02 DETAILS - TYPICAL FRAMING
<br />A5-03 DETAILS - TYPICAL CEILING - ACT
<br />A5-04 DETAILS - TYPICAL ROOF & MISC.
<br />A5-05 DETAILS - CASEWORK
<br />A5-06 DETAILS - (E) REGULATORY SIGNAGE
<br />A6-01 SCHEDULE - DOOR & WINDOW
<br />INTERIORS
<br />I1-11 PLAN - FINISH - CLINICAL AREA
<br />I1-12 PLAN - FINISH - PROVIDER ENCLAVE
<br />EQUIPMENT & FURNITURE
<br />Q1-11 PLAN - EQUIPMENT & FURNITURE - 1ST FLR - CLINICAL AREA
<br />Q1-12 PLAN - EQUIPMENT & FURNITURE - 1ST FLR - PROVIDER ENCLAVE
<br />Q6-01 PLAN - EQUIPMENT & FURNITURE SCHEDULE
<br />PLUMBING
<br />P0-01 GENERAL NOTES, LEGEND & SYMBOLS
<br />P0-02 SPECIFICATION - PLUMBING
<br />P0-11 PLAN - DEMO OVERALL - 1ST FLR
<br />P0-12 PLAN - DEMO 1ST FLR - CLINICAL AREA
<br />P0-13 PLAN - DEMO 1ST FLR - PROVIDER ENCLAVE
<br />P1-11 PLAN - REMODEL OVERALL - 1ST FLR
<br />P1-12 PLAN - REMODEL 1ST FLR - CLINICAL AREA
<br />P5-01 DETAILS - PLUMBING
<br />P6-01 SCHEDULES - PLUMBING
<br />MECHANICAL
<br />M0-01 GENERAL NOTES, LEGEND & SYMBOLS
<br />M0-02 SPECIFICATION - MECHANICAL
<br />M0-03 T-24 FORMS
<br />M0-04 T-24 FORMS
<br />M0-11 PLAN - DEMO OVERALL - 1ST FLR
<br />M0-12 PLAN - DEMO 1ST FLR - CLINICAL AREA
<br />M0-13 PLAN - DEMO 1ST FLR - PROVIDER ENCLAVE
<br />M0-31 PLAN - OVERALL ROOF PLAN DEMOLITION
<br />M0-32 PLAN - PARTIAL ROOF PLAN DEMOLITION
<br />M1-11 PLAN - REMODEL OVERALL - 1ST FLR
<br />M1-12 PLAN - REMODEL 1ST FLR - CLINICAL AREA
<br />M1-13 PLAN - REMODEL 1ST FLR - PROVIDER ENCLAVE
<br />M1-31 PLAN - OVERALL ROOF PLAN NEW WORK
<br />M1-32 PLAN - PARTIAL ROOF PLAN NEW WORK
<br />M5-01 DETAILS - MECHANICAL
<br />M6-01 SCHEDULES - MECHANICAL
<br />ELECTRICAL
<br />E0-01 ELECTRICAL COVERSHEET
<br />E0-02 ELECTRICAL SPECIFICATION
<br />E0-03 ELECTRICAL SPECIFICATION
<br />E0-04 ELECTRICAL SPECIFICATION
<br />E0-05 ELECTRICAL SPECIFICATION
<br />E0-06 ELECTRICAL SPECIFICATION
<br />E0-10 PLAN- DEMO 1ST FLR - ELECTRICAL - OVERALL
<br />E0-11 PLAN- DEMO 1ST FLR - POWER - CLINICAL AREA
<br />E0-12 PLAN- DEMO 1ST FLR - POWER - PROVIDER ENCLAVE
<br />E0-13 PLAN- DEMO 1ST FLR - LIGHTING - CLINICAL AREA
<br />E0-14 PLAN- DEMO 1ST FLR - LIGHTING - PROVIDER ENCLAVE
<br />E0-15 PLAN- DEMO 1ST FLR - SIGNAL - CLINICAL AREA
<br />E0-16 PLAN- DEMO 1ST FLR - SIGNAL - PROVIDER ENCLAVE
<br />E0-17 PLAN- DEMO 1ST FLR - FIRE ALARM - CLINICAL AREA
<br />E0-18 PLAN- DEMO 1ST FLR -FIRE ALARM - PROVIDER ENCLAVE
<br />E1-10 PLAN - REMODEL 1ST FLR - POWER - ELECTRICAL - OVERALL
<br />E1-11 PLAN - REMODEL 1ST FLR - POWER - CLINICAL AREA
<br />E1-12 PLAN - REMODEL 1ST FLR - POWER - PROVIDER ENCLAVE
<br />E1-13 PLAN - REMODEL 1ST FLR - LIGHTING - CLINICAL AREA
<br />E1-14 PLAN - REMODEL 1ST FLR - LIGHTING - PROVIDER ENCLAVE
<br />E1-15 PLAN - REMODEL 1ST FLR - SIGNAL - CLINICAL AREA
<br />E1-16 PLAN - REMODEL 1ST FLR - SIGNAL - PROVIDER ENCLAVE
<br />E1-17 PLAN - REMODEL 1ST FLR - FIRE ALARM - CLINICAL AREA
<br />E1-18 PLAN - REMODEL 1ST FLR - FIRE ALARM - PROVIDER ENCLAVE
<br />E1-20 PLAN - REMODEL 2ND FLR - ELECTRICAL - OVERALL
<br />E1-31 PLAN - PARTIAL ROOF PLAN - ELECTRICAL REMODEL
<br />E5-00 PANEL SCHEDULES
<br />E5-01 SINGLE LINE DIAGRAM
<br />E6-00 ELECTRICAL DETAILS
<br />E7-00 TITLE 24
<br />SECURITY
<br />T1-11 PLAN - REMODEL 1ST FLR - SECURITY
<br />T5-01 DETAILS - SECURITY
<br />T6-01 SINGLE LINE DIAGRAM - SECURITY
<br />SIGNAGE
<br />SG1-11 PLAN - REMODEL ENLARGED 1ST FLR - SIGNAGE
<br />SG5-01 DETAILS - SIGNAGE
<br />N/ADEFERRED APPROVALS 06
<br />CITY SUBMITTAL / BID SET 11/03/2025
<br />1 CITY BACKCHECK #1 01/06/2026
|