Laserfiche WebLink
PREPARED BY:DATE: <br />PROJECT NUMBER: <br />SHEET NAME: <br />SHEET NUMBER: <br />PROPOSED EQUIPMENT:SCOPE OF WORK:HOMEOWNER:CONTRACTOR: <br />G.02 <br />GENERAL NOTES1/21/2026 <br />TG-388 <br />ABRAHAM BRITO <br />1407 N. KING ST. (ADU) <br />SANTA ANA | CA | 92706 <br />APN #: 004-030-10ALEX J. CLUCK <br />Alex J. Cluckx <br />GENERAL NOTES <br />•ALL MATERIAL(S), EQUIPMENT, INSTALLATION & WORK SHALL <br />COMPLY W/ THE FOLLOWING APPLICABLE CODE(S): <br />••2025 CBC | 2023 IBC <br />••2025 CRC | 2023 IRC <br />••2025 CEC | 2023 NEC <br />••2025 CMC | 2023 UMC <br />••2025 CPC | 2023 UPC <br />••2025 CFC | 2023 IFC <br />••2025 BUILDING ENERGY CODE <br />••2025 CALGREEN <br />•EXISTING PLUMBING VENT(S), SKYLIGHT(S), EXHAUST OUTLET(S) & <br />VENTILATION INTAKE AIR OPENING(S) SHALL NOT BE COVERED BY <br />THE SOLAR PHOTOVOLTAIC SYSTEM <br />•ALL EQUIPMENT SHALL BE LISTED & LABELED BY A RECOGNIZED <br />ELECTRICAL TESTING LABORATORY AND INSTALLED PER LISTING <br />REQUIREMENTS & THE MANUFACTURER'S INSTRUCTION(S) <br />[NEC 690.4(D)] <br />•ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED, <br />INCLUDING ALL ROOF MOUNTED TRANSITION BOXES & SWITCHES <br />•ALL EQUIPMENT SHALL BE PROPERLY GROUNDED & BONDED IN <br />ACCORDANCE W/ NEC ARTICLE 250 <br />•ALL CIRCUITS CONNECTED TO MORE THAN ONE SOURCE SHALL <br />HAVE OVER CURRENT DEVICES LOCATED SO AS TO PROVIDE OVER <br />CURRENT PROTECTION FROM ALL SOURCES [NEC 690.9(A)] <br />•ADDITIONAL EQUIPMENT OF THE PV SYSTEM SHALL BE LOCATEDOUTSIDE OF THE BUILDING NEAR THE MAIN ELECTRICAL SERVICES <br />[NEC 690.12(C)] <br />•THE UTILITY INTERACTIVE INVERTER(S) SHALL AUTOMATICALLY <br />DE-ENERGIZE ITS OUTPUT TO THE CONNECTED ELECTRICAL <br />PRODUCTION & DISTRIBUTION NETWORK UPON LOSS OF <br />VOLTAGE IN THE SYSTEM & SHALL REMAIN IN THAT STATE UNTIL <br />THE ELECTRICAL PRODUCTION & DISTRIBUTION NETWORK <br />VOLTAGE HAS BEEN RESTORED [NEC 690.61] <br />•DUE TO THE FACT THAT PV MODULES ARE ENERGIZED WHENEVER <br />EXPOSED TO LIGHT, PV CONTRACTOR SHALL DISABLE THE ARRAY <br />DURING INSTALLATION & SERVICE BY SHORT CIRCUITING, OPEN <br />CIRCUITING, OR COVERING THE ARRAY W/ OPAQUE COVERING <br />[NEC 690.18] <br />•ALL CONDUCTOR EXPOSED TO WEATHER SHALL BE LISTED & <br />IDENTIFIED FOR USE IN DIRECT SUNLIGHT <br />[NEC 690.31(B), 310.8(D)] <br />•THE MODULE CONDUCTORS MUST BE TYPE USE-2 OR LISTED <br />PHOTOVOLTAIC (PV) WIRE [NEC 690.31(B)] <br />•ALL CONDUCTORS SHALL BE MARKED ON EACH END FOR UNIQUE <br />IDENTIFICATION [NEC 690.4(B)] <br />•ALL GROUND CONDUCTORS SHALL BE PROPERLY COLOR <br />IDENTIFIED PER [NEC 690.6(B)] <br />•PV SYSTEM CONNECTED ON THE LOAD SIDE OF THE SERVICE <br />DISCONNECTING MEANS IF THE OTHER SOURCE(S) AT ANY <br />DISTRIBUTION EQUIPMENT ON THE PREMISES SHALL MEET THE <br />FOLLOWING [NEC 705.12]: <br />••EACH SOURCE CONNECTION SHALL BE MADE AT THEDEDICATED CIRCUIT BREAKER OR FUSIBLE DISCONNECTING <br />MEANS [NEC 705.12(D)(1)] <br />••THE SUM OF THE AMPERE RATING OF THE OVERCURRENT <br />DEVICES IN CIRCUITS SUPPLYING POWER TO THE BUSBAR OR <br />CONDUCTOR SHALL NOT EXCEED 120% OF THE RATING OF <br />BUSBAR OR CONDUCTOR [NEC 705.12(D)(2)] <br />••THE INTERCONNECTION POINT SHALL BE ON THE LINE SIDE <br />OF ALL GROUND-FAULT PROTECTION EQUIPMENT <br />[NEC 705.12(D)(3)] <br />••EQUIPMENT CONTAINING OVERCURRENT DEVICES IN <br />CIRCUIT SUPPLYING POWER TO A BUSBAR OR CONDUCTOR <br />SHALL BE MARKED TO INDICATE THE PRESENCE OF ALL <br />SOURCES [NEC 705.12(D)(4)] <br />••CIRCUIT BREAKER, IF BACKED, SHALL BE SUITABLE FOR SUCH <br />OPERATION [NEC 705.12(D)(5)] <br />•TO MINIMIZE OVERHEATING OF THE BUSBAR IN PANEL BOARD, <br />THE PANEL BOARD MAIN CIRCUIT BREAKER & THE PV POWER <br />SOURCE CIRCUIT BREAKER SHALL BE PHYSICALLY LOCATED AT THE <br />OPPOSITE END OF THE BUSBAR [NEC 705.12(D)(7)] <br />•ALL THE NEC REQUIRED WARNING SIGNS, MARKING, & LABELS <br />SHALL BE POSTED ON EQUIPMENT & DISCONNECTS PRIOR TO ANY <br />INSPECTIONS TO BE PERFORMED BY THE BUILDING DEPARTMENT <br />INSPECTOR <br />•METALLIC RACEWAYS OR METALLIC ENCLOSURES ARE REQUIREDWIRING METHOD FOR INSIDE A BUILDING FOR PV SYSTEM <br />[NEC 690.31(E)] <br />•FLEXIBLE, FINE-STRANDED CABLES SHALL BE TERMINATED ONLY <br />W/ TERMINALS, LUGS, DEVICES OR CONNECTOR THAT ARE <br />IDENTIFIED & LISTED FOR SUCH USE [NEC 690.31(F) & 110.14(A)] <br />•CONNECTORS SHALL BE OF LATCHING OF LOCKING TYPE. <br />CONNECTORS ARE READILY ACCESSIBLE & OPERATING OVER 30 <br />VOLTS SHALL REQUIRE TOOL TO OPEN & MARK "DO NOT <br />DISCONNECT UNDER LOAD" OR "NOT FOR CURRENT <br />INTERRUPTING" [NEC 690.33(C) & (E)(2)] <br />•EQUIPMENT GROUNDING CONDUCTOR FOR PV MODULES <br />SMALLER THAN 6AWG SHALL BE PROTECTED FROM PHYSICAL <br />DAMAGE BY A RACEWAY OR CABLE ARMOR <br />[NEC 690.46 & 250.120(C)] <br />•FINE-STRANDED CABLES USED FOR BATTERY TERMINALS, DEVICES, <br />& CONNECTIONS REQUIRE LUGS & TERMINALS LISTED & MARKED <br />FOR THE USE [NEC 690.74(A)] <br />HOMEOWNER INFORMATION <br />HOMEOWNER:ABRAHAM BRITOADDRESS:1407 N. KING ST. (ADU) <br />CITY / STATE / ZIP: SANTA ANA | CA | 92706 <br />PHONE NUMBER:-BUILDING TYPE:RESIDENTIAL - SFRNUMBER OF STORIES: 1 <br />CONTRACTOR INFORMATION <br />CONTRACTOR: T&G ROOFING AND SOLARADDRESS: 153 N 10TH ST. <br />CITY / STATE / ZIP: UPLAND | CA | 91786 <br />PHONE NUMBER: (909) 931-3204 <br />CSLB LICENSE: #583458CSLB CLASS:B | C-39 | C-10 | HIC <br />EQUIPMENT INFORMATION <br />PV MODULES:(6) SILFAB: SIL-440 QD <br />INVERTER(S):(6) ENPHASE: IQ8MC-72-M-US <br />BATTERIES:(1) ENPHASE: IQBATTERY-5P-1P-NA <br />MODULE AREA:21.00 FT.2 <br />MODULE LENGTH: 67.80-IN. <br />MODULE WIDTH:44.60-IN. <br />MODULE WEIGHT: 46.30 LBS. <br />TOTAL MODULE AREA: 126.00 FT.2 <br />MOUNTING WEIGHT: 50.40 LBS.TOTAL INSTALL WEIGHT: 328.20 LBS. <br />POINT LOAD PER MOUNT: 23.44 LBS. <br />DISTRIBUTED WEIGHT: 2.60 P.S.F. <br />ROOFING INFORMATION <br />TYPE OF ROOF:COMPOSITION SHINGLES <br />WIND SPEED:130 MPH <br />EXPOSURE CATEGORY: C <br />BUILDING CODE DATA <br />(E) OCCUPANCY GROUP R3 <br />(E) TYPE OF CONSTRUCTION V-B <br />(E) SPRINKLERS NO <br />APPLICABLE CODE <br />•2025 BUILDING STANDARDS ADMINISTRATIVE CODEPART 1, TITLE 24, C.C.R.[2023 IBC W/ AMENDMENTS] <br />•2025 CALIFORNIA BUILDING CODE [CBC]PART 2, TITLE 24, C.C.R.[2023 IBC W/ AMENDMENTS] <br />•2025 CALIFORNIA ELECTRICAL CODE [CEC]PART 3, TITLE 24, C.C.R.[2023 NEC W/ AMENDMENTS] <br />•2025 CALIFORNIA FIRE CODE [CFC]PART 9, TITLE 24 C.C.R. <br />•2023 NATIONAL ELECTRICAL CODE NFPA 70 [NEC] <br />SHEET INDEX <br />G.01 COVER <br />G.02 GENERAL NOTES <br />S.01 SITE PLAN <br />S.02 STRUCTURAL DETAILS <br />S.03 ESS STRUCTURAL <br />A.01 EQUIPMENT ELEVATION <br />E.01 ELECTRICAL DETAILS <br />E.02 ONE-LINE DIAGRAM <br />E.03 ONE-LINE CALCULATIONS <br />S.04 WARNING SIGNAGE <br />*EQUIPMENT DATA-SHEETS ARE ATTACHED TO PACKET <br />T&G ROOFING AND SOLAR COMPANY <br />CSLB #583458 (B|C-39|C-10|HIC) <br />153 N. 10TH ST. UPLAND, CA 91786 <br />(909) 931-3204Roofing & Solar Company <br />ROOFING · GUTTERS <br />GENERATORS · SOLAR <br /> (6) SILFAB: SIL-440 QD (MODS.) <br /> (6) ENPHASE: IQ8MC-72-M-US (MICRO-INVS.) <br /> (1) ENPHASE: IQBATTERY-5P-1P-NA (ESS) <br /> 2.64kW (DC) | 2.41kW (CEC-AC) SOLAR W/ 5kWh BATTERIES <br />INSTALL A NEW ENERGY STORAGE SYSTEM ON NEW ADU . WORK TO BE CONDUCTED <br />UNDER AN ACTIVE CSLB LICENSE SHALL ADHERE TO APPLICABLE CODES. <br />*SEE CODE(S) REFERENCED THROUGHOUT THIS PLAN SET FOR COMPLIANCE <br />www. Loyd W Martin .com <br />Solar Structures Engineering <br />#2026-0037 Structural Only <br />January 26, 2026 <br />Exp. 3-31-19 <br />No. C58724 NITRAMW.DYO <br />REGISTEREDPROFESSIONALENGINEER <br />C <br />V <br />L <br />FOETATS <br />ALIFORNIAICIL <br />­2187