My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995 S Standard Ave- Bays - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Standard Ave
>
1995 S Standard Ave
>
1995 S Standard Ave- Bays - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:00:32 AM
Creation date
2/24/2026 5:00:08 AM
Metadata
Fields
Template:
Plan
Permit Number
101121135
Full Address
1995 S Standard Ave
Street Number
1995
Street Direction
S
Street Name
Standard
Street Suffix
Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OVERTURNING ANALYSIS Configuration1 Bay 1 - 120" (Option 1) <br />Per RMI Sec 2.6.9 and ASCE7-16. Sec 15.5.3.6. Weight of rack with all levels loaded to 67% capacity, & with only top level loaded <br />FULLY LOADED <br />Wpl = 30,000 lbs Wdl = 600 lbs <br />Wpl <br /> . 67% = 30,000 . 0.67 = 20,100 lbs <br />VTrans = (1 . 0.255 . 1 . ((0.67 . 20,100) + 600)) = 3,587 lbs <br />Movt = VTrans <br /> . Ht = 3,587 . 248 = 889,576 in-lbs <br />Mst = ((Wpl <br /> . 0.67) + Wdl) . d . Factor <br />= ((30,000 . 0.67) + 600) . 38 . 0.5 = 393,300 in-lbs <br />Puplift = 1 . (Movt - Mst)/d = (889,576 - 393,300) / 38 = 13,059 lbs <br />PMaxDown = 1 . (Movt + Mst) / d = (889,576 + 393,300) / 38 = 33,759 lbs <br />TOP SHELF LOADED <br />Shear = 1,428 lbs <br />Movt = VTop <br /> . Ht = 1,428 . (312 + ((60 - 10) / 2)) = 481,236 in-lbs <br />Mst = (l + Wdl) . d = (5,000 + 600) . (38 . 0.5) = 106,400 in-lbs <br />Puplift = 1 . (Movt - Mst)/d = (481,236 - 106,400) / 38 = 9,864 lbs <br />ANCHORS <br />No. of Anchors (#Anchors): 6 <br />Pull Out Capacity per Anchor (TAnchor): 2,891 lbs <br />Shear Capacity per Anchor: 3,351 lbs <br />SIDE LOADS ON TOP SHELF <br />Top loaded shelf level (H) = 312 in. <br />Movt = 1.6 . 350 . H = 1.6 . 350 . 312 = 174kip <br />Puplift = Movt/d = 174 / 38 = 4,597 lbs <br />PResist = 0.95 . TAnchor <br /> . #Anchors . Row Spacer Stress = 0.95 . 2,891 . 6 . 0.918 = 15,127 lbs <br />COMBINED STRESS <br />Fully Loaded = ((13,059 / 6) / 2,891) + ((3,587 / 12) / 3,351)= 0.842 <br />Top Shelf Loaded = ((9,864 / 6) / 2,891) + ((1,428 / 12) / 3,351)= 0.604 <br />Seismic UpLift <br />Critical (LC#7B)= (15,127 / 6) / 2,891 = 0.872 <br />Side Load Top Shelf = ((4,597 / 2) / 6) / 2,891 = 0.133 <br />PROJECT: <br />FOR: <br />ADDRESS: <br />SHEET#: <br />CALCULATED BY: <br />DATE: <br />Behr Process Corp <br />Interlake-Mecalux_Gabr <br />1995 S Standard Av <br />Santa Ana, CA <br />22 <br />kelvira <br />4/11/2024 <br /> TEL:(909)869-0989 <br /> 1130 E. CYPRESS ST, COVINA, CA 91724 <br />PN:20240411_15
The URL can be used to link to this page
Your browser does not support the video tag.