Laserfiche WebLink
CITY OF SANTA ANA <br />Planning and Building Agency I <br />TO <br />V <br />Cqd <br />PRESCRIPTIVE RESIDENTIAL ADDITIONS THAT DO NOT REQUIRE HERS FIELD <br />MA <br />CALIFORNIA ENERGY COMMISSION VERIFICATION <br />CEC- CF111-ADD-02-E <br />L. Water Heating Systems (Section 150.2(a)1D) <br />List water heaters and boilers for both domestic hot water (DHW) heaters and hydronic space heating. <br />Options: <br />1. A single heat pump water heater. The storage tank shall not be located outdoors and shall be <br />placed on an incompressible, rigid insulated surface with a minimum thermal resistance of R-10. <br />The water heater shall be installed with a communication interface that meets either the <br />requirements of Section 110.12(a) or has an ANSI/CTA-2045-B communication port; or <br />2. A single heat pump water heater that meets the requirements of NEEA Advanced Water Heater <br />Specification Tier 3 or higher; or <br />3. A gas or propane instantaneous water heater with an input of 200,000 Btu per hour or less and no <br />storage tank; or <br />4. For addition that are 500 square feet or less, an instantaneous electric water heater with point of <br />use distribution as specified in the Reference Appendices, Residential Appendix, RA4.4.5 <br />Field <br />Field Name <br />Data Entry 1 <br />Data Entry 2 <br />Data Entry 3 <br />01 <br />Water Heating System <br />WH 1 <br />ID or Name <br />02 <br />Water Heating System <br />DOMESTIC <br />Type <br />03 <br />System Option (from <br />§150.2(a)1D) <br />04 <br /># of Water Heaters/ <br />Compressors in System <br />05 <br />Water Heater Type <br />TANKLESS <br />06 <br />Fuel Type <br />NG <br />07 <br />Rated Input <br />08 <br />Tank Location <br />OUTSIDE ADU <br />09 <br />Distribution Type <br />Pipes <br />CA Building Energy Efficiency Standards - 2022 Residential Compliance <br />January 2022 <br />PRESCRIPTIVE RESIDENTIAL ADDITIONS THAT DO NOT REQUIRE HERS FIELD <br />;tin& CALIFORNIA ENERGY COMMISSION VERIFICATION <br />w.a► <br />CEC- CF113-ADD-02-E <br />Documentation Author's Declaration Statement <br />1. 1 certifv that this Certificate of Compliance documentation is accurate and complete. <br />Documentation Author Name: <br />Documentation Auth Signature: <br />Company: <br />Signature Date: <br />RC DESIGN & DRAFTING CO1�t <br />V8/31/24 <br />Address: <br />CEA/ HERS Certi 1c tification (if applicable): <br />PO BOX 146 <br />City/State/Zip: <br />DOWNEY CA., 90241 <br />Phone: <br />562-320-2293 <br />Responsible Person's Declaration Statement <br />I certify the following under penalty of perjury, under the laws of the State of California: <br />i. The information provided on this Certificate of Compliance is true and correct. <br />2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the <br />building design or system design identified on this Certificate of Compliance (responsible designer). <br />3. The energy features and performance specifications, materials, components, and manufactured <br />devices for the building design or system design identified on this Certificate of Compliance conform <br />to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. <br />4. The building design features or system design features identified on this Certificate of Compliance <br />are consistent with the information provided on other applicable compliance documents, <br />worksheets, calculations, plans and specifications submitted to the enforcement agency for approval <br />with this building permit application. <br />5. 1 understand that a registered copy of this Certificate of Compliance shall be made available with the <br />building permit(s) issued for the building, and made available to the enforcement agency for all <br />applicable inspections. <br />I understand that a registered copy of this Certificate of Compliance is required to be included with the <br />documentation the builder provides to the buildine owner at occuoancv. <br />Responsible Designer Name: <br />Responsible Designer ignature: <br />EDGAR RIOS <br />Company: <br />Date Signed: <br />RC DESIGN & DRAFTING CO. <br />8/31/2024 <br />V /2k <br />Address: PO BOX 146 <br />License: 892174 <br />City/State/Zip: <br />Phone: <br />DOWNEY CA., 90241 <br />562-320-2293 <br />For assistance or questions regarding the Energy Standards, contact the Energy Hotline at: 1-800-772-3300 <br />CA Building Energy Efficiency Standards - 2022 Residential Compliance <br />CERTIFICATE OF COMPLIANCE - USER INSTRUCTIONS CF1R-ADD-02-E <br />Prescriptive Residential Additions That Do Not Require HERS Field Verification (Page 2 of 12) <br />9. Climate Zone: From Reference Appendices, Joint Appendix, JA2.1.1. <br />10. Total Conditioned Floor Area: Enter the new conditioned floor area, in square feet (ft2), as measured from the outside of exterior walls of <br />the addition. <br />11. Building Type: Single Family (includes duplex) <br />12. Slab Area: Area of the first floor slab of the addition (if any) in square feet (ft2). <br />13. Project Scope: 300 square feet (ft2) or less, greater than 300 ft2 up to 400 ft2, greater than 400 ft2 up to 700 ft2, or greater than 700 ft2 up to <br />1000 ft2. <br />14. Exceptions to Fenestration U-factor and SHGC: Installing less than or equal to 3 square feet (ft2) glass in door, Installing less than or equal to <br />3 ft2 tubular skylight, Installing less than or equal to 16 ft2 skylight, or NA. <br />B. Opaque Surface Details - Framed <br />Walls: Additions of any size must meet the requirements of Table 150.1-A when using prescriptive compliance. However, extensions of existing <br />walls require only R-15 wall insulation in 2x4 constructions, or R-21 wall insulation in 2x6 or larger constructions. <br />1. Tag/ID: A label (if any) from the plans, such as A1.4 or wall. <br />2. Assembly Type: Roof, Ceiling, Wall, Floor, Attic. <br />3. Frame Type: Wood or Metal. <br />4. Frame Depth: Nominal dimensions (in inches) of framing material such as 2x4, 2x6, 2x8, 2x10. <br />5. Frame Spacing: 16 or 24 (inches on center). <br />6. Proposed Cavity R-value: Insulation installed between framing members. <br />Proposed Continuous Insulation: R-value of rigid or continuous insulation (not interrupted by framing). See applicable table of the <br />Reference Appendices for construction type. <br />7. Proposed U-factor: The U-factor for the proposed assembly must be less than or equal to column 10 or have an attached Area Weighted <br />Average Calculation Worksheet (CF1R-ENV-02-E) to show that a weighted U-factor for multiple assemblies will meet the maximum value in <br />column 10. <br />8. Joint Appendix JA4 Reference Table: Table number used to determine the R-value or U-factor (e.g., an attic assembly is 4.2.1). <br />9. Joint Appendix JA4 Reference Cell: Cell number used to determine the R-value or U-factor (e.g., an R-38 ceiling with 24-inch on center <br />framing and no continuous insulation is A21). <br />10. Required U-factor or R-value: From Table 150.1-A or B. Value required based on climate zone and assembly type. <br />11. Comments: Any notes regarding location, unique conditions, or attachments. <br />CA Building Energy Efficiency Standards - 2022 Residential Compliance <br />January 2022 <br />January 2022 <br />CERTIFICATE OF COMPLIANCE - USER INSTRUCTIONS CF1R-ADD-02-E <br />Prescriptive Residential Additions That Do Not Require HERS Field Verification (Page 1 of 12) <br />CF1R-ADD-02-E User Instructions <br />NOTE: If more space is needed, print a duplicate page and fill in. <br />Minimum requirements for prescriptive addition compliance can be found in Building Energy Efficiency Standards Section 150.2(a), and Table <br />150.1-A or Table 150.1-B. Completing these forms will require that you have the Reference Appendices for the 2022 Building Energy Efficiency <br />Standards, which contain the Joint Appendices used to determine climate zone and to complete the section for opaque surfaces. When the term <br />CF1R is used it means the CF1R-ADD-02. Worksheets are identified by their entire name and subsequently by only the worksheet number, such as <br />ENV-02. <br />Instructions for sections with column numbers and row numbers are given separately. <br />If any part of the addition does not comply, prescriptive compliance fails, in which case the performance (or computer) compliance approach may <br />be used in an attempt to achieve compliance. Only the new construction is required to meet the requirements specified in this documentation. If <br />any alterations to the existing building are occurring, those are documented on one or more of the CF1R-ALT forms. <br />A. General Information <br />1. Project Name: Identifying information, such as owner's name. <br />2. Date Prepared: Date of document preparation. <br />3. Project Location: Legal street address of property or other applicable identifying information. <br />4. Building Front Orientation: Building front orientation expressed in degrees, where North = 0, East = 90, South = 180, and West = 270. The <br />Standards (section 100.1) include the following additional details for determining orientation: <br />• North is oriented to within 45 degrees of true north, including 45 degrees east of north; <br />• East is oriented to within 45 degrees of true east, including 45 degrees south of east; <br />• South is oriented to within 45 degrees of true south, including 45 degrees west of south; <br />• West is oriented to within 45 degrees of true west, including 45 degrees north of west. <br />5. CA City: Legal city/town of property. <br />6. Number of Dwelling Units with Additions: 1 for single-family <br />7. Zip Code: 5-digit zip code for the project location (used to determine climate zone). <br />8. Fuel Type: Natural Gas, Liquefied Propane Gas, or Electricity. <br />NOTE: Prescriptive compliance only allows electricity if natural gas is not connected to the building. <br />CA Building Energy Efficiency Standards - 2022 Residential Compliance <br />CERTIFICATE OF COMPLIANCE - USER INSTRUCTIONS CF1R-ADD-02-E <br />Prescriptive Residential Additions That Do Not Require HERS Field Verification (Page 3 of 12) <br />C. Opaque Surface Details - Non -Framed Walls <br />1. Tag/ID: A label (if any) from the plans, for example, A1.4 or wall. <br />2. Assembly Type: Roof, Wall. <br />3. Assembly Materials: SIP OSB, SIP I -Joist, SIP Single 2x, SIP Double 2x, ICF see JA4 for guidance. <br />4. Thickness: Thickness in inches. <br />5. Proposed Core Insulation R-value: Insulation installed within the materials or on the inside. See Reference Appendices, Joint Appendix, JA4 <br />for guidance. <br />6. Proposed Continuous Insulation R-value: Insulation installed on the exterior. See Reference Appendices, Joint Appendix, JA4 for guidance. <br />7. Proposed U-factor: Proposed U-factor from Reference Appendices, Joint Appendix, JA4 or CF1R-ENV-02-E. Must be less than or equal to <br />column 10. <br />8. Appendix JA4 Reference Table: Table number used to determine the R-value or U-factor (e.g., a SIP wall is 4.3.2). <br />9. Appendix JA4 Reference Cell: Cell number used to determine the R-value or U-factor (e.g., a 4.5-inch thick Oriented Strand Board (OSB) wall <br />with R-18 core insulation and no continuous insulation is A5). <br />10. Required U-factor from Table 150.1-A: Based on assembly type and climate zone. <br />11. Comments: Any notes regarding location, unique conditions, or attachments. <br />D. Opaque Surface Details - Mass Walls <br />1. Tag/ID: A label (if any) from the plans, for example, A1.4 or wall. <br />2. Above Grade/Below Grade: Indicate whether the mass wall is installed above grade o below grade. <br />3. Mass Type: Masonry, Clay Brick, Clay Hollow Unit, Concrete Masonry Unit (CMU) Light Weight, CMU Medium Weight, CMU Normal Weight, <br />Concrete. See Reference Appendices, Joint Appendix, JA4 for guidance. <br />4. Mass Thickness: Thickness (in inches) of mass. <br />5. Joint Appendix JA4 Reference Table: Table number used to determine the R-value or U-factor (e.g., an Insulation Concrete Form (ICF) wall is <br />4.3.13). <br />6. Joint Appendix JA4 Reference Cell: Cell number used to determine the R-value or U-factor (e.g., an 8-inch thick Insulating Concrete Form <br />(ICF) wall with 2 inches of Expanded Polystyrene (EPS) (R-15.4) is Cl). <br />7. Interior Furring Strip Thickness: If furring strips are required to meet the required wall R-value, indicate the thickness of the furring strip (in <br />inches). See Table 4.3.14 of Reference Appendices, Joint Appendix, JA 4. <br />8. Proposed Interior Insulation R-value : Enter the R-value of proposed insulation on the inside surface of the mass wall. See Reference <br />Appendices, Joint Appendix, JA4 for guidance. <br />9. Exterior Furring Strip Thickness: If furring strips are required to meet the required wall R-value, indicate the thickness of the furring strip (in <br />inches). See Table 4.3.14 of Reference Appendices, Joint Appendix, JA 4. <br />CA Building Energy Efficiency Standards - 2022 Residential Compliance January 2022 <br />January 2022 <br />REVI <br />PLANS BY: <br />M s er ID: <br />D t . R.C. <br />DESIGNS <br />P.0 BOX. 146 <br />DOWNEY CA. <br />90241 <br />(561) 320-2293 <br />�731 2024 <br />GAR RIGS <br />PROJECT <br />BUILDING DESIGNER <br />These drawings and designs <br />are the property of <br />RC Designs & Drafting Co. <br />and can not be use by <br />others,copied or make <br />reproduction of it, without <br />the written consent of <br />the authors/designers. <br />Notify the designer for <br />any discrepancy or <br />modification. <br />SHEET TITLE: <br />ENERGY <br />CF1 R ADD <br />PROPOSED: <br />WAVAN <br />HECTOR FLAMENCO <br />(714) 615-7344 <br />PROJECT ADDRESS: <br />1232 S SYCAMORE ST <br />UNIT "2" <br />SANTA ANA CA.92707 <br />DRAWN BY:1 E.RR <br />J/-\I C 0-1) 1 -L`t <br />JOB # RC2024119 <br />S-3/3 T24-3 <br />CE <br />