Laserfiche WebLink
SIMPSON <br />STRAP PER <br />SCHEDULE <br />BEAM PER PLAN <br />POST PER PLAN <br />STRAP SCHEDULE <br />STRAP <br />A ST12 <br />B ST18 <br />C ST6215 <br />- <br />2900# <br />5600# <br />CAPACITYMARK <br />EA. SIDE <br />END VIEWISOMETRIC VIEW <br />EQ <br />. <br />EQ <br />. <br />EQ <br />. <br />NOTES: <br />1.ADD SHIMS EA. SIDE WHERE BEAM & POST <br />WIDTH ARE DIFFERENT (MIN. 10D PENETRATION <br />INTO MAIN MEMBER IS REQ'D, WHERE "D" IS <br />THE SHANK DIAMETER OF NAIL) <br />2.PROVIDE FULL NAILING PER MANUF. <br />REQUIREMENTS. <br />3.INCREASE STRAP LENGTH ON POST SIDE <br />WHERE THERE IS DBL. TOP PLATE BETWEEN <br />POST AND BEAM. <br />SIMPSON <br />STRAP PER <br />SCHEDULE <br />EQ <br />. <br />BEAM/POST CONNECTION <br />STRAP SCHEDULE <br />END LENGTH <br />A CS16 18" <br />B (2) CS16 18" <br />1700# <br />3400# <br />CAPACITYMARK <br />END LEN <br />G <br />T <br />H <br />END <br />L <br />E <br />N <br />G <br />T <br />H <br />2ND STRAP <br />(WHERE OCCURS) <br />SIMPSON CS16 PER SCHEDULE <br />AT CONDITION B, ADD <br />2x4x48" LONG MEMBER TO <br />RECEIVE 2ND CS16 & NAIL. <br />SISTER w/ 16d @ 4" O.C. <br />STAGG. TO ROOF RAFTER <br />ROOF RAFTER w/ <br />E.N. PER PLAN <br />DBL. TOP PLATE <br />TYP. R/R <br />STUD/POST <br />SIMPSON <br />STRAP <br />FULL DEPTH BLK'G <br />NOTES: <br />1.PROVIDE FULL NAILING PER MANUFACTURER TO PROVIDE STRAP FULL CAPACITY. <br />2.ROOF SHEATHING NOT SHOWN FOR CLARITY. <br />DBL. <br /> <br />T <br />O <br />P <br /> <br />P <br />L <br />A <br />T <br />E <br />TYP. <br /> <br />R <br />/ <br />R <br />BLK'G <br />DRAG AT REENTRANT CORNER <br />NOTE: APPLICATION OF STRAP OVER PLYWOOD SHEATHING IS ACCEPTABLE. E.N. NOT <br />REQUIRED OVER THE STRAP LENGTH WHERE STRAP APPLIED OVER PLYWOOD. <br />DBL. ROOF RAFTERS <br />OR BM. W/ EDGE <br />NAILING TO ROOF <br />SHEATHING <br />RIDGE <br />PER PLAN HANGER <br />PER PLAN <br />DBL. ROOF RAFTERS <br />W/ EDGE NAILING TO <br />ROOF SHEATHING. <br />SIMPSON <br />CS14x30"LONG <br />STRAP FULLY <br />NAILED PER MANUF. <br />ROOF SHEATHING w/ <br />EDGE NAILING TO <br />DBL. ROOF RAFTERS <br />DRAG DETAIL AT FLUSH RIDGE CONNECTION <br />E.Q.E.Q. <br />STRAP SCHEDULE <br />SIMPSON STRAP MIN BEAM/JOIST WIDTH END LENGTH <br />A (1) CS16 2x 18" <br />(2) CS16 2-2x OR 3x 18" <br />C 24" <br />CMST14 4x 36" <br />1700# <br />3400# <br />4585# <br />6490# <br />CAPACITY <br />TO RECEIVE STRAP <br />MARK <br />D <br />B <br />FLUSH BEAM CONDITION <br />FLUSH BEAM/JOIST(S) <br />W/ LINE OF E.N. PER PLAN <br />POST OR MULTISTUD <br />PER PLAN <br />DBL. TOP PL. <br />CONT. BEAM/BLK'G <br />PER FRAMING PLAN <br />EQ.EQ. <br />STUD <br />SIMPSON STRAP <br />PER SCHEDULE <br />NOTE: PROVIDE FULL NAILING PER MANUF. TO DEVELOP FULL CAPACITY OF THE STRAP. <br />DRAG STRAP AT WALL END <br />DROP BEAM CONDITION <br />DROP BEAM PER PLAN <br />POST OR MULTISTUDS <br />PER PLAN <br />SIMPSON STRAP <br />PER SCHEDULE <br />EQ.EQ. <br />DBL. TOP PL. <br />STUD <br />ALT. STRAP <br />LOCATION <br />2-2x OR 3x(2) CS14 <br />POST/STUD PER PLAN <br />DBL. TOP PLATES <br />HIP OR VALLEY BEAM <br />(2) SIMP. LTS20 EACH SIDE <br />OF BEAM TO POST TYP. OF (4) <br />HIP OR VALLEY BEAM <br />POST CONDITION WALL CONDITION <br />NOTES: <br />1.PROVIDE EQUAL NUMBER OF NAILS TO BM. FOR NAIL SIZE AND SPACING OUTSIDE <br />THE LAP LENGTH AND STUDS. PROVIDE TOTAL NUMBER OF NAILS PER MANUF. <br />2.NAILING OF STRAP TO DBL. TOP PLATE IS NOT REQ'D AND SHALL NOT BE <br />COUNTED TOWARDS TOTAL NUMBER OF NAILS REQ'D BY MANUF. <br />HIP/VALLEY BEAMS UPLIFT TIE <br />B.N.ROOF <br />SHEATHING <br />2x R.R. OR <br />L.V.L. RIM <br />PER PLAN <br />SIMPSON CLIP PER <br />SHEAR WALL <br />SCHEDULE (@48" <br />O.C. MAX.) <br />E.N. <br />SHEAR PANEL <br />PER PLAN <br />ALT. LOCATION OF <br />SIMPSON A35/LTP4 <br />ROOF <br />SHEATHING <br />2x R.R. OR <br />L.V.L. RIM <br />PER PLAN <br />2x STUD WALL2x STUD WALL <br />ALIGNED CONDITION OFFSET CONDITION <br />INTERIOR SHEAR TRANSFER AT ROOF RAFTER <br />BM. PER PLAN <br />ST18 AT POST TO BEAM <br />BELOW, TYP OF (2) <br />16d NAILS @ 4" O.C. <br />STAGGERED EACH SIDE <br />KING POST <br />BM. PER PLAN <br />2x KING STUD AT <br /> EITHER SIDE OF POST <br />SIMPSON ST18 EACH <br />SIDE OF KING POST TO <br />BEAM. <br />ALT1: w/ KING STUD ALT 2: w/ STRAPS <br />KING POST <br />KING POST CONNECTION <br />NOTES: <br />- ROOF FRAMING NOT SHOWN FOR CLARITY <br />- PROVIDE FULL HEIGHT POST PER PLAN WHERE NO BEAM BELOW OCCURS <br />STRAP KING STUDS ABOVE & BELOW WITH (1)CS16 (MIN. 18" END LENGTH) EA. STUD <br />- AT LOCATIONS WHERE KING POST IS BEARING ON SOLE PLATE; PROVIDE SIMPSON A35 EACH SIDE OF POST <br />PANEL EDGE <br />STRAP SCHEDULE <br />STRAP BLOCKING <br />A CS16 2x <br />B (2)CS16 2-2x <br />C (2)CS14 2-2x <br />1700# <br />3400# <br />4980# <br />CAPACITYMARK <br />NAIL SPACING SCHEDULE <br />NAIL SPACING <br />2 @ 12" O.C. <br />3 @ 9" O.C. <br />4 @ 6" O.C. <br />PANEL <br />5 @ 5" O.C. <br />DBL SIDED 3 @ 4" O.C. <br />@ 3" O.C.DBL SIDED 4 <br />DBL SIDED 5 @ 2-1/2" O.C. <br />TYPES <br />CONT. STUDS/ <br />POST w/ B.N. & <br />HOLDOWN PER <br />PLAN <br />(2) ROWS 16d <br />SINKER NAIL <br />STAGG. PER TABLE <br />NAILING/SCREWS <br />/BOLT PER SHEAR <br />WALL SCHEDULE <br />WINDOWS SILL <br />WHERE OCCURS <br />CONT. STRAP OVER <br />BLK'G (FULLY NAILED <br />PER MANUF.) TYP. EA. <br />CORNER OF OPENING, <br />PER STRAP <br />SCHEDULE. <br />HEADER PER PLAN <br />(2) ROWS 16d SINKER NAIL <br />STAGG. PER SCHEDULE, TYP.2x STUD <br />PER PLAN <br />SHEAR PANEL TYPE <br />PER PLAN E.N. AT <br />BLK'G & EDGES OF <br />SHEAR WALL <br />HEADER <br />PER PLAN <br />WINDOWS SILL <br />WHERE OCCURS <br />(2)2x TOP PL. <br />CONT. STUDS/POST <br />W/ E.N. & HOLDOWN <br />PER PLAN <br />CONT. STRAP OVER BLK'G <br />(FULLY NAILED PER MANUF.) <br />TYP. EA. CORNER <br />OF OPENING, PER <br />STRAP SCHEDULE. <br />(2) ROWS 16d <br />SINKER NAIL STAGG. <br />PER SCHEDULE, TYP. <br />1/8" <br />STRAP <br />E.N. <br />NOTES: <br />1.INSTALL HOLDOWN ON RETURN WALL AT <br />CORNERS WHEN APPLICABLE. <br />2.USE FULL WIDTH BLK'G. & WINDOW SILL <br />FOR STRAP(S) ON BOTH SIDES OF (2) <br />SIDED SHEAR PANELS. <br />3.NAIL ADJACENT PLWD. PANELS ON SAME <br />MEMBER, WHERE POSSIBLE. <br />4.SEE PLAN FOR NUMBER OF OPENINGS <br />SHAPED FOR FORCE TRANSFER AROUND <br />OPENING. <br />MULTI-OPENINGS AT SHEAR WALL <br />ROOF RAFTER TO HIP/ VALLEY BEAM <br />A <br />A <br />HIP BEAM <br />PER PLAN USE SIMP. HANGER <br />WHERE RAFTER <br />SPAN EXCEED 8'-0" <br />ROOF SHEATHING <br />B.N.B.N. <br />A-A @ HIP BEAM <br />VALLEY BEAM <br />PER PLAN <br />ROOF SHEATHING <br />B.N. <br />A-A @ VALLEY BEAM <br />B.N. <br />USE SIMP. HANGER <br />WHERE RAFTER <br />SPAN EXCEED 8'-0" <br />(5) -16d TOE NAIL <br />E.A. END TO BEAM <br />HIP/ VALLEY BEAM <br />PER PLAN <br />(5) -16d TOE NAIL <br />E.A. END TO BEAM <br />TYP. 2x ROOF <br />RAFTER WHERE <br />OCCUR <br />TYP. 2x ROOF <br />RAFTER WHERE <br />OCCUR <br />(5) -16d TOE NAIL <br />E.A. END TO BEAM <br />RIDGE BEAM <br />PER PLAN <br />TYPICAL ROOF <br />RAFTER PER PLAN <br />PLYWOOD <br />SHEATHING <br />USE SIMPSON LRUZ HANGERS <br />WHEN SPAN OF RAFTERS EXCEED <br />10'-0" OTHERWISE USE MIN. (5) 16d <br />TOE NAILS @ EACH RAFTER TO RIDGE <br />ST22 @ 48" O.C. <br />B.N. <br />ROOF RAFTER TO FLUSH RIDGE CONNECTION <br />SHEAR PANEL <br />PER PLAN <br />FULL HEIGHT BLK'G. <br />ROOF SHEATHING <br />SIMPSON A35 <br />PER SHEAR WALL <br />SCHEDULE <br />MAX.48" O.C. <br />SIMPSON H2.5A <br />@ 48" O.C. U.N.O. <br />DBL. TOP PLATE <br />OR BM. PER PLAN <br />ROOF RAFTERS <br />PER PLAN <br />POST/STUD <br />VAULTED CEILING CONDITION <br />B.N. <br />E.N. <br />2x CONT. FASCIA <br />w/ 2-16d FACE <br />NAILS TO EACH <br />RAFTER <br />SHEAR TRANSFER AT R/R PER. TO EXTERIOR WALL <br />SIMPSON H2.5A <br />@ 48" O.C. U.N.O. <br />DBL. TOP PLATE <br />OR BM. PER PLAN <br />ROOF RAFTERS <br />PER PLAN <br />POST/STUD <br />SIMPSON A35 <br />PER SHEAR WALL <br />SCHEDULE <br />MAX. 48" O.C. <br />CJ w/ 8-16d <br />FACE NAILS TO R/R <br />PER PLAN. <br />SHEAR PANEL <br />PER PLAN <br />w/ CEILING JOISTS CONDITION <br />FULL HEIGHT BLK'G. <br />ROOF SHEATHING <br />B.N. <br />E.N. <br />2x CONT. FASCIA <br />w/ 2-16d FACE <br />NAILS TO EACH <br />RAFTER <br />18" MAX.24" MIN. <br />B.N. <br />(2) 16d's TO <br />EA. OUTRIGGER <br />SHEAR WALL <br />PER PLAN <br />BALLOON FRAMED <br />STUDS <br />TYPICAL ROOF <br />RAFTER PER PLAN <br />(2) 16d's PER <br />CONNECTION <br />2x4 FLAT OUTRIGGER <br />@ 24" O.C. <br />ROOF SHEATHING2x FLAT BLOCKS W/ <br />16d's @ 4" O.C. TO <br />PLATE BELOW. <br />2x FASCIA BOARD <br />CONDITION I - TRANSFER THROUGH BLOCKING <br />E.N. <br />SHEAR TRANSFER R/R PARALLEL TO EXTERIOR WALL <br />TYPICAL ROOF <br />RAFTER PER PLAN <br />(2) 16d's PER <br />CONNECTION <br />2x4 FLAT OUTRIGGER <br />@ 24" O.C. <br />ROOF SHEATHING <br />18" MAX.24" MIN. <br />B.N. <br />(2) 16d's PER <br />CONNECTION. <br />SHEAR WALL <br />PER PLAN <br />BALLOON FRAMED STUDS <br />2x FLAT <br />BLK'G <br />2x FASCIA BOARD <br />CONDITION II - TRANSFER THROUGH R.R. <br />16d's @ 4" O.C. <br />2x R.R. ADJACENT TO WALL <br />NOTCHED AT OUTRIGGERS <br />(DO NOT OVER-CUT) <br />E.N. <br />B.N. <br />ALT 1: STRAP SPLICE <br />SIMPSON STRAP <br />PER SCHEDULE EQ.EQ. <br />ALT 2: LAP SPLICE <br />LAP SPLICE LENGTH <br />PER SCHEDULE <br />2x STUDS <br />(PLACE AT JOINT TYP.) <br />16d <br />SEE SCHEDULE FOR <br />REQ'D # <br />2x STUDS <br />(PLACE AT JOINT TYP.) <br />2 1/2" (MIN.) <br />16d <br />NAIL PATTERN <br />TOP PLATE <br />(PLAN VIEW @ LAP ZONE) <br />NOTES: <br />1.NAILING SHOULD BE PER MANUFACTURER TO DEVELOP 100% CAPACITY OF <br />THE STRAP. <br />2.FOR NAIL SIZE AND SPACING OUTSIDE THE LAP LENGTH REFER TO NAILING <br />SCHEDULE OF GENERAL NOTES. <br />3.STAGGER NAILS AND SPACE EVENLY TO AVOID SPLITTING. <br />TOTAL STRAP LENGTH <br />TOP PLATE SPLICE <br />2x STUDS (PLACE <br />AT JOINT TYP.)2x STUD (PLACE <br />AT JOINT TYP.) <br />SIMPSON STRAP <br />PER SCHEDULE <br />EQ.EQ. <br />EQ.EQ. <br />HIP CONDITION VALLEY CONDITION <br />SIMPSON STRAP <br />PER SCHEDULE <br />NO. OF 16d LAP SPLICE LENGTH SIMPSON STRAP <br />A 18 4'-0"ST22 <br />B 28 4'-0"ST6224 <br />C 40 6'-0" <br />42 <br />ST6236 <br />MARK <br />E 8'-0"MSTC52 <br />D <br />62 <br />8'-0"MSTC37 <br />(NOTE 1) <br />SPLICE SCHEDULE <br />@ EACH LAP (NOTE 2) <br />LAP SPLICE STRAP SPLICE <br />1 <br />2 <br />3 <br />7 <br />4 <br />5 <br />6 <br />11 <br />8 <br />9 <br />10 COLLAR TIE CONNECTION DETAIL <br />EQ EQ <br />H <br />E.N.E.N. <br />SIMPSON ST22 STRAP <br />@ EACH R.R. <br />7-16d FACE NAILS RAFTER TIES/ CEILING JOIST @ 16" O.C. (*) <br />2x6 COLLAR TIE <br />@ 16" O.C.8-16d FACE NAILS <br />AT EA. ENDS <br /> H <br />/ <br />3 <br />L=21'-3" MAX. <br />E.N.E.N. <br />ROOF SHEATHING <br />NOTE: (*) RAFTER TIES SHALL BE INSTALLED AT LOWER THIRD <br />OF THE ROOF SYSTEM AND CAN BE USED AS CEILING <br />JOISTS AS SHOWN. NOTIFY E.O.R. WHERE CEILING JOISTS <br />ARE CONFLICTED WITH RAFTER TIES <br />2X RIDGE BOARD PER PLAN <br />2X R.R. PER PLAN <br />REFER TO DETAIL <br />4/S-D2.0REFER TO DETAIL <br />4/S-D2.0 <br />CONNECTION DETAIL <br />(E) CEILING JOIST PER PLAN (E) CEILING JOIST PER PLAN <br />(N) BEAM PER PLAN <br />APPROVED <br />HANGER <br />APPROVED <br />HANGER <br />ST6224 @ 48" O.C. <br />FLUSH BEAM <br />SIMPSON A34 (TYP.) <br />MULTIPLE STUDS (SISTER <br />w/FACE NAILS PER NAILING <br />SCHEDULE) OR POST, PER <br />PLAN <br />DBL. TOP PLATES <br />SILL/SOLE PLATE <br />FRONT VIEW SIDE VIEW <br />CONT. FLUSH <br />BEAM WHERE <br />OCCURS <br />FLUSH BEAM TO DBL TOP PLATES CONNECTION12 <br />13 <br />14 <br />15 <br />16 <br />CONNECTION DETAIL <br />BEAM PER PLAN <br />MULTISTUDS OR <br />POST PER PLAN <br />SIMPSON LCE4 <br />17 <br />1 <br />54312 <br />R <br />E <br /> <br />V <br /> <br />I <br /> <br />S <br /> <br />I <br /> <br />O <br /> <br />N <br />DA <br />T <br />E <br /> <br /> <br /> <br />SHEET NO.: <br />PROJECT MANAGER: <br />P.P. <br />DATE: <br />JOB NO.: 231223 <br />02/19/2025 <br />Pr <br />o <br />j <br />e <br />c <br />t <br /> <br />A <br />d <br />r <br />e <br />s <br />s <br />: <br />NE <br />W <br /> <br />D <br />E <br />T <br />A <br />C <br />H <br />E <br />D <br /> <br />A <br />D <br />U <br />31 <br />5 <br /> <br />N <br /> <br />M <br />A <br />X <br />I <br />N <br />E <br /> <br />S <br />T <br />. <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />Pr <br />o <br />j <br />e <br />c <br />t <br /> <br />N <br />a <br />m <br />e <br />: <br />DE <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br />6 <br />02/19/2025 <br />02 <br />/ <br />1 <br />3 <br />/ <br />2 <br />0 <br />2 <br />5 <br />1S <br />T <br /> <br />P <br />L <br />A <br />N <br /> <br />C <br />H <br />E <br />C <br />K <br />SD2.0 <br />ST <br />R <br />U <br />C <br />T <br />U <br />R <br />A <br />L <br />DE <br />T <br />A <br />I <br />L <br />S