Laserfiche WebLink
Be am ID: 2 <br />Section type:Douglas Fir-Larch No.2 <br />Section name:4x10 <br />Fb(+)/Fb(-) (psi): 900/900 Fv (psi): 180 <br />E (psi): 1600000 Lu (ft): 0 <br />Ignore shear within (d): True Repetitive member : False <br />Applie d Loads: <br />Load_Roof 510PLF =25.5 x (20+20)/2 @ 0' to 6.76' <br />Load_Ceiling 70PLF =8.75 x (6+10)/2 @ 0' to 6.76' <br />SELF WEIGHT 7.59PLF From 0' to 6.76' <br />Factors: <br />Ct = 1 Cm = 1 CL = 1.00 CF = 1.2 Cfu = 1 Ci = 1 Cr = 1 <br />Re actions: <br />Support D L Lr S WSN WWE ESN EWE M ax. LC (Down/Up) <br />1 976 0 1010 0 0 0 0 0 1986/0 <br />2 976 0 1010 0 0 0 0 0 1986/0 <br />Code che ck: <br />Actual Loc.(ft)Allowe d Ratio (%)CD <br />Moment (lbs-ft)3356 3.38 5615 60 1.25 <br />Shear (lbs)1503 6.76 4856 31 1.25 <br />Live Deflection 0.038 3.38 0.225 17 - <br />Total Deflection 0.075 3.38 0.338 22 - <br />Passe d <br />Max Moment: D + Lr <br />Max Shear: D + Lr <br />Max Deflection: D + Lr <br />Be am ID: 3 <br />Section type:Douglas Fir-Larch No.2 <br />Section name:4x10 <br />Fb(+)/Fb(-) (psi): 900/900 Fv (psi): 180 <br />E (psi): 1600000 Lu (ft): 0 <br />Ignore shear within (d): True Repetitive member : False <br />Applie d Loads: <br />Load_Ceiling 180PLF =22.5 x (6+10)/2 @ 0' to 13.27' <br />SELF WEIGHT 7.59PLF From 0' to 13.27' <br />Factors: <br />Ct = 1 Cm = 1 CL = 1.00 CF = 1.2 Cfu = 1 Ci = 1 Cr = 1 <br />Re actions: <br />Support D L Lr S WSN WWE ESN EWE M ax. LC (Down/Up) <br />1 498 0 746 0 0 0 0 0 1245/0 <br />2 498 0 746 0 0 0 0 0 1245/0 <br />Code che ck: <br />Actual Loc.(ft)Allowe d Ratio (%)CD <br />Moment (lbs-ft)4129 6.63 5615 74 1.25 <br />Shear (lbs)1095 13.27 4856 23 1.25 <br />Live Deflection 0.213 6.63 0.442 48 - <br />Total Deflection 0.354 6.63 0.664 53 - <br />Passe d <br />Max Moment: D + Lr <br />Max Shear: D + Lr <br />Max Deflection: D + Lr <br />vG23.06.30 <br />: <br />: <br />: <br />: <br />Com pany <br />Project 231223 - 317 N Maxine St SA ADU <br />Job No.231223 <br />Plan N/A <br />: <br />: <br />: <br />: <br />Designed T.D. <br />Checked P.P. <br />Date 12/28/2023 <br />Client N/A <br />TIC Structure Design 2023 <br />Page 17 of 24