Laserfiche WebLink
ROOF FRAMING PLAN <br />SCALE: 1/4" = 1' <br />FOUNDATION PLAN <br />SCALE: 1/4" = 1' <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />   <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br />L=8'-0" <br />1 <br />L=8'-0" <br />1 <br />L=7'-6" <br />1 <br />L=4'-0" <br />1 <br />L=4'-0" <br />1 <br />L= <br />1 <br />2 <br />' <br />- <br />0 <br />" <br />1 <br />L= <br />8 <br />' <br />- <br />0 <br />" <br /> <br /> <br /> <br /> <br />SD1 <br />1 <br />SD1 <br />1 <br />SD1 <br />8 <br />SD1 <br />2 <br />SD1 <br />2 <br /> <br />SD1 <br />3 <br />SD1 <br />7 <br />SD1 <br />6 <br />4x4 <br />P <br />O <br />S <br />T <br />4x4 <br />P <br />O <br />S <br />T <br />SD1 <br />5 <br />SD1 <br />5 <br />1 <br />L=8'-0" <br />1 <br />L=8'-0" <br />1 <br />L=7'-6" <br />1 <br />L=4'-0" <br />1 <br />L=4'-0" <br />1 <br />L= <br />1 <br />2 <br />' <br />- <br />0 <br />" <br />1 <br />L= <br />8 <br />' <br />- <br />0 <br />" <br />SD1 <br />11 <br />SD1 <br />11 <br />SD1 <br />12 <br />SD1 <br />11 <br />SD1 <br />11 <br />4x4 <br />P <br />O <br />S <br />T <br />4x4 <br />P <br />O <br />S <br />T <br />SD1 <br />15 <br />SD1 <br />15 <br />SD1 <br />10TYP. <br />SD1 <br />20TYP. <br />HDU <br />2 <br />HDU <br />2 <br />HDU <br />2HDU <br />2 <br />HDU <br />2 <br />HDU <br />2 <br />HDU <br />2 <br />HDU <br />2 <br />HDU <br />2 <br />HDU <br />2 <br />HDU <br />2 <br />HDU <br />2 <br />HDU <br />2 <br />HDU <br />2 <br />F1 F1 <br />SD1 <br />16TYP. <br />SD1 <br />16TYP. <br />SD1 <br />16TYP. <br />SYMBOL FOOTING DESCRIPTION <br />PAD FOOTING SCHEDULE <br />SD1 <br />16TYP. <br /> <br />1 <br />L=8'-0" <br />A <br />2 <br />1 <br />C B <br />2 <br />L= <br />8 <br />' <br />- <br />0 <br />" <br />SD1 <br />9 <br />SD2 <br />4 <br />1 <br />L=8'-0" <br />HDU <br />2 <br />HDU <br />2 <br />2 <br />L= <br />8 <br />' <br />- <br />0 <br />" <br />HDU <br />5 <br />HDU <br />5 <br />SD1 <br />11 <br />SD1 <br />13 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />4x4 <br />K <br />. <br />P <br />. <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />A <br />D <br />D <br />R <br />E <br />S <br />S <br />: <br />sheet no: <br />sheet title: <br />revisions: <br />- <br />- <br />- <br />- <br />drawn by: <br />job number: <br />AM <br />- <br />N <br />e <br />w <br /> <br />A <br />D <br />U <br />- <br />5 <br />4 <br />1 <br />2 <br /> <br />W <br /> <br />K <br />e <br />d <br />g <br />e <br /> <br />A <br />v <br />e <br /> <br /># <br />2 <br />, <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />AR25-039 <br />DATE: 06/27/2025 <br />THESE DRAWINGS AND <br />SPECIFICATIONS, IDEAS, DESIGNS AND <br />ARRANGEMENTS ARE, AND SHALL <br />REMAIN, THE PROPERTY OF REFUGIO <br />DOMINGUEZ ENGINEERING <br />CONSULTANTS. NO PART SHALL BE <br />COPIED, REPRODUCED OR OTHERWISE <br />USED, DIRECTLY OR INDIRECTLY, IN <br />WHOLE OR IN PART, IN CONNECTION <br />WITH ANY OTHER WORK OR PROJECT <br />WITHOUT THE WRITTEN CONSENT OF <br />OONNATI. VISUAL CONTACT WITH <br />THESE DRAWINGS AND/OR <br />SPECIFICATIONS SHALL CONSTITUTE A <br />PRIMA FACIE EVIDENCE OF <br />ACCEPTANCE OF THESE <br />RESTRICTIONS. <br />254 COTTONWOOD ST, <br />ONTARIO, CA 91761 <br />TEL: (909) 907 - 3949 <br />EMAIL: <br />ab33r.engineering@gmail.com <br />REFUGIO <br />DOMINGUEZ <br />ENGINEERING CONSULTANTS <br />S1 <br />FOUNDATION & ROOF <br />FRAMING PLAN <br />ANCHOR BOLT AND HOLDOWNS : <br />1. PROVIDE 3"x3"x0.229" THICK WASHER PLATES AT ALL ANCHOR <br />BOLTS. PLATE WASHER EDGE IS TO BE LOCATED MAX 1/2" FROM <br />THE FACE OF WALL SHEATHING. <br />2. ALL TIE-DOWN HARDWARE (ANCHOR BOLTS, HOLDOWNS, STRAPS, <br />ETC.) SHALL BE TIED-IN-PLACE PRIOR TO FOUNDATION INSPECTION. <br />INSPECTOR SHALL BE NOTIFIED AND MUST INSPECT PLACEMENT <br />PRIOR TO POURING OF FOUNDATION OR SLAB. <br />3. HOLD-DOWNS SHALL BE RE-TIGHTENED JUST PRIOR TO COVERING <br />THE WALL FRAMING. HOLD-DOWN CONNECTORS SHALL BE <br />TIGHTENED TO FINGER TIGHT PLUS ONE HALF (12) WRENCH TURN JUST <br />PRIOR TO COVERING THE WALL FRAMING. <br />4. FASTENERS IN PRESERVATIVE-TREATED WOOD (I.E. ANCHOR BOLTS, <br />PLATE WASHERS, NAILS, SCREWS, ETC.) SHALL BE APPROVED <br />SILICON BRONZE OR COPPER, STAINLESS STEEL, OR HOT-DIPPED <br />ZINC-COATED STEEL. (CBC 2304.9.5.1) <br />ANCHOR BOLTS MAY HAVE A MECHANICALLY DEPOSITED ZINC <br />COATING WITH WEIGHTS PER ASTM B 696, CLASS 55. <br />5. FOUNDATION PLATE BOLTING (MIN.): PROVIDE 5/8" x 12" A307 <br />ANCHOR BOLTS, EMBEDDED 9" MIN. INTO CONCRETE. THERE SHALL <br />BE A MINIMUM OF TWO (2) BOLTS PER PLATE, WITH ONE (1) BOLT <br />LOCATED WITHIN 12" OF END, AND SPACED 6'-0" O.C. UNLESS <br />OTHERWISE NOTED. <br />6. FOR ANCHOR BOLTS SPACING AT SHEAR PANELS, SEE SHEAR WALL <br />SHCEDULE (S.W. SCHD.) PER SHEAR WALL TYPE SPECIFIED ON <br />FOUNDATION PLAN. <br />FOUNDATION MATERIALS <br />7. WHERE FRAMING LUMBER IS IN DIRECT CONTACT WITH, OR LESS <br />THAN 1-12" FROM CONCRETE, USE FOUNDATION GRADE REDWOOD <br />OR PRESSURE TREATED DOUGLAS-FIR LUMBER. <br />8. PROVIDE 116" THICK (MIN.) CORROSIVE-RESISTANT METAL BASE-PLATE <br />FOR UNTREATED WOOD POSTS IN-CONTACT WITH ALL CONCRETE. <br />9. POSTS ON CONCRETE FLOORS EXPOSED TO WEATHER OR, IN <br />BASEMENTS SHALL BE SUPPORTED BY CONCRETE PIERS OR METAL <br />PEDASTALS AT LEAST 6" ABOVE GROUND AND/OR 1" ABOVE FLOOR. <br />10. VAPOR-BARRIER MATERIAL SHALL BE POLYETHYLENE FILM (VISQUEEN <br />OR EQUIVALENT) AND SHALL BE PLACED UNDER ALL HOUSE SLABS <br />AND UNDER GARAGE SLABS, WHERE NOTED ON PLANS, WITH SIX <br />INCH (6") MIN. SEALED LAP SPLICES. <br />11. PROVIDE SUCCO BASE SCREED (SEC.4706E) <br />12. ALL REINFORCEMENT BARS SHALL CONFORM TO ASTM A615, <br />GARDE-60 (fY = 60 KSI). <br />SOIL PARAMETERS & SOIL PREPARATION: <br />13. SOIL BEARING VALUES ARE USED 1500 PSF. ADDITIONAL SOIL <br />PARAMETERS ARE LISTED ON DESIGN CRITERIA ON GENERAL NOTES <br />SHEET. <br />14. PRIOR TO PLACING CONCRETE, SUB-GRADE SOIL BELOW ALL <br />CONCRETE FLOOR SLABS SHALL BE RE-MOISTURIZED TO 90% OF <br />OPTIMUM MOISTURE TO A DEPTH OF 12 INCHES IMMEDIATELY <br />PRIOR TO PLACEMENT OF THE MOISTURE BARRIER OR POURING OF <br />CONCRETE. <br />15. PRIOR TO FOUNDATION INSPECTION, A REGISTERED SOILS ENGINEER <br />SHALL BE REQUIRED TO TEST THE SOIL AT THE BOTTOM OF THE <br />FOUNDATION EXCAVATION AND SUBMIT A CERTIFICATE TO THE <br />BUILDING OFFICIAL JUSTIFYING THE BEARING VALUE AND <br />COMPETENCE OF THE SOIL ACCORDING TO THE DESIGN VALUE USED <br />IN LIEU OF REQUIRING A SOILS REPORT PRIOR TO PALCEMENT OF <br />REINFORCEMENT STEEL. <br />GENERAL NOTES TO CONTRACTOR: <br />16. CONTRACTOR SHALL VERIFY FOUNDATION DIMENSIONS WITH FLOOR <br />PLAN DIMENSIONS AND REPORT ANY DISCREPANCIES TO ARCHITECT <br />PRIOR TO START OF CONSTRUCTION. <br />17. CONTRACTOR SHALL COORDINATE WITH OTHER TRADES ALL <br />REQUIREMENTS FOR THEIR MATERIALS TO BE INSTALLED UNDER/IN <br />SLAB. <br />18. VERIFY LOCATIONS OF ALL HOLDDOWNS WITH FRAMING PLANS & <br />FRAMING CONTRACTOR PRIOR TO INSTALLATION. <br />19. ALL FOUNDATION EXCAVATIONS MUST BE OBSERVED AND <br />APPROVED BY THE PROJECT ENGINEERING GEOLOGIST AND/OR <br />PROJECT GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT OF <br />REINFORCING STEEL. <br />20. PLUMBING AND ELECTRICAL TRENCHES UNDER THE SLAB SHALL BE <br />BACKFILLED WITH SAND AND COMPACTED BY MECHANINICAL <br />TAMPING. <br />21. FOUNDATION CONSTRUCTION MAY BE OF TWO-POUR <br />CONFIGURATION, HOWEVER, IF CONTRACTOR OPTS TO UTILIZE A <br />TWO-POUR CONFIGURATION, FOUNDATION SHALL BE FORMED SO <br />AS TO CREATE A 'CURB' CONDITION @ ALL PERIMETER AND STEP <br />BREAK LOCATIONS THEREBY, ASSURING A MONOLITHIC CONDITION <br />FOR HOLDOWNS, STRAPS AND ANCHOR BOLTS. <br />22. ANY PLUMBING DRAINPIPE OR VENT PIPE CUT THROUGH A STUD <br />WALL SHALL BE 2x6 STUD WALL OR TWO 2x4 WALLS WITH PLYWOOD <br />SHEAR PANEL ON NON-PLUMBING WALL. <br />FOUNDATION NOTES HOLDOWN SCHEDULE <br />LOADSHOLDOWN <br />HOLDOWN SCHEDULE <br />LOADSANCHORHOLDOWN <br />A35 OR LTP4 @ <br />24"o.c. <br />ANCHOR BOLT SCHD.MATERIAL AND NAILING DESCRIPTIONSYMBOL <br />SHEARWALL SCHEDULE - CBC 2022 (1, 2) <br />2x PLATE W/ 16d @ 6"o.c. <br />2x PLATE W/ 16d @ 4"o.c.A35 OR LTP4 @ <br />16"o.c.8d @ 4"o.c. E.N. / 12"o.c. F.N. <br />8d @ 6"o.c. E.N. / 12"o.c. F.N. <br />1/2" OSB W/2x SILL PLATE W/ <br />12" DIA A.B. @ 36"o.c. <br />3x SILL PLATE W/ 58" DIA <br />A.B. @ 24"o.c. <br />1/2" OSB W/ <br />SHEAR TRANSFER <br />RIM JOIST/BLOCKING <br />*(SEE NOTE 15) <br />BOTTOM PLATESIZE & NAILING <br />(SEE NOTE 16) <br />(SEE NOTE 16) <br />& SILL PLATE SIZE <br />*(SEE NOTE 9, 10, 11) <br />1 <br />2 <br />(SEE NOTE 13)ON 3x FRAMING <br />MAX DESIGN SHEAR CAP. (PLF) <br />EQ WIND <br />532 <br />364 <br />1.ROOF SHEATHING SHALL BE: <br />12" APA PLYWOOD OR ORIENTED STRAND BOARDS WITH 24"/16" SPAN <br />RATING. <br />UNBLOCKED = 8d COMMON NAILS @ 6" o.c. AT ALL EDGES,/12" OC FIELD <br />MINIMUM PENETRATION IS 158" INTO FRAMING. B.N. APPLIES TO ALL <br />SUPPORTED PLYWOOD EDGES AT: <br />PLYWOOD EDGES, PERIMETER WALLS, & SHEARWALLS. <br />** INSTALLATION OF ROOFING SHALL BE IN ACCORDANCE WITH <br />MANUFACTURER'S SPECIFICATIONS. <br />2. TJI JOISTS (ESR-1153), TIMBERSTRANDS, AND PARALLAMS (ESR-1387) <br />MANUFACTURER SHALL BE 'TRUSS JOIST MACMILLAN' OR EQUIVALENT. <br />3. DO NOT CUT, NOTCH, DRILL, BORE, SHAVE, TAPER OR FOR ANY REASONS <br />MODIFY PRE-ENGINEERED / MANUFACTURED STRUCTURAL ELEMENTS SUCH <br />AS GLUED-LAMINATED MEMBERS, PARALLAMS, MICROLLAMS, I-JOISTS, <br />LIGHT GAUGE METAL MEMBERS AND OTHER SIMILAR TIMBER OR STEEL <br />PRODUCTS UNLESS SUCH MODIFICATIONS ARE WITHIN THE WRITTEN <br />PARAMETERS SET FORTH BY THE MANU- FACTURER OF THAT PRODUCT OR <br />A LETTER OF CERTIFICATION FROM THE MANUFACTURER'S ENGINEER WITH <br />DETAIL SIGNED AND STAMPED IS ISSUED AND AUTHORIZED BY THE <br />PROJECT ENGINEER OF RECORD AND APPROVED BY THE CITY OF <br />GOVERNING BUILDING OFFICIAL. <br />4. USE SIMPSON "LU" HANGERS TYPICALLY FOR ALL DECK JOIST & OTHER <br />DIMENSIONAL LUMBER, U.N.O. <br />5. USE SIMPSON 'IUS' HANGERS WHERE TJI FLOOR JOIST ARE UTILZED, U.N.O. <br />6. BEAMS BEARING ON TOP PLATES SHALL HAVE A SIMPSON 'A34' EACH SIDE <br />(U.N.O.). ALIGN DBL 2x STUDS (U.N.O.) BELOW. NAIL TOGETHER WITH 16d <br />@ 16"o.c. <br />7. ALL POSTS TO TOP PLATE AND SILL PLATE CONNECTIONS SHALL BE <br />SIMPSON 'A34' U.N.O. <br />8. PROVIDE 'MSTC28' STRAP ACROSS ALL DISCONTINUOUS DBL. TOP PLATES. <br />9. PROVIDE DOUBLE JOISTS @ SIDES & ENDS OF ALL OPENINGS. (U.N.O.) NAIL <br />TOGETHER WITH 16d @ 12"o.c. (TYP.) <br />10. PROVIDE DBL. JOISTS BELOW ALL INTERIOR WALLS 8'-0" OR GREATER IN <br />LENGTH. PROVIDE BLOCKING @ 1/3 SPANS. <br />11. ALL SHEAR PANEL SHALL BE APPLIED DIRECTLY TO STUDS PRIOR TO <br />INSTALLATION OF DECORATIVE POP-OUTS AND TRIM. <br />12. FRAMING MEMBERS OR BLOCKING SHALL BE PROVIDED AT THE EDGES OF <br />ALL SHEETS IN PLYWOOD SHEARWALLS. <br />13. ALL PLYWOOD EDGES OF FLOOR/DECK DIAPHRAGMS SHALL BE SUPPORTED <br />BY 2x OR WIDER FRAMING ELEMENTS. <br />14. PROVIDE MULTIPLE STUDS UNDER BEAMS OR TRUSSES TO MATCH WIDTH <br />OF SUPPORTED MEMBER, TYP. STUDS SHALL BE CONTINUED IN LOWER <br />FLOORS AND/OR CRAWL SPACE TO FOOTING, TYP. <br />15. PROVIDE SOLID BLOCKING UNDER POSTS AND MULTIPLE STUDS TO <br />TRANSFER LOADS TO POSTS/STUDS BELOW. <br />16. ANY PLUMBING DRAINPIPE OR VENT PIPE CUT THROUGH A STUD WALL <br />SHALL BE 2x6 STUD WALL OR TWO 2x4 WALLS WITH PLYWOOD SHEAR <br />PANEL ON NON-PLUMBING WALL. <br />17. PROVIDE DOUBLE-FLOOR JOIST BELOW BATH-TUBS. <br />FRAMING NOTES <br />* SEE SHEAR WALL NOTES ON SHEET-SN <br />380 <br />260 <br />3-31-233-31-253/31/273/31/27