My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD ZONE - 4610 W Melric Dr & 406 S Andres Pl - Plan
PBA
>
Building
>
ProjectDox
>
A
>
Andres Pl
>
406 S Andres Pl
>
FLOOD ZONE - 4610 W Melric Dr & 406 S Andres Pl - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:00:54 AM
Creation date
2/24/2026 5:00:16 AM
Metadata
Fields
Template:
Plan
Permit Number
101124032
Full Address
406 S Andres Pl
Street Number
406
Street Direction
S
Street Name
Andres
Street Suffix
Pl
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />Planning and Building Agency <br />The following recommendations are considered minimum and may be <br />more restrictive requirements of the architect, civil/structural engineer, bu <br />governing agencies. <br />Geotechnical Impact on Neighboring Properties <br />Approved <br />R PERMIT ISSUANCE <br />iferseded by <br />o$s�ode, or <br />er <br />Date: <br />Adverse geotechnical impact of the proposed development on the neighboring properties <br />is not anticipated, provided the recommendations outlined in this report are properly <br />implemented. <br />Site Preparation/Grading <br />To create a relatively uniform new engineered compacted fill layer for a proposed new <br />structural slab -on -grade area, over -excavation and recompaction of about 3 ft. deep <br />(measured from the existing ground surface) of the existing on -site soils should be <br />performed. The lateral limits of the over -excavation should be minimum equal to depth of <br />removal (3 ft. in this case) beyond the outside perimeter of the proposed new structure. <br />For the proposed new exterior concrete slabs including new driveway, if any, the <br />overexcavation and recompaction should be minimum 1 ft deep and 1 ft. outside of the <br />new slab areas. <br />Deeper remedial removal is not anticipated; however, this will be determined in the field <br />by the project geotechnical engineer, based on the actual conditions to be exposed at the <br />time of the site grading/preparation. <br />The fill/backfill materials, if any, should be free of organic matter and oversized <br />materials, 4 inches or greater in diameter, placed in near -horizontal loose lifts not to <br />exceed eight inches in thickness, and moisture conditioned to slightly over optimum <br />moisture content prior to compaction. <br />Imported soils, if any, should have a very low expansion potential and should be <br />geotechnically observed/tested and accepted by the geotechnical consultant prior to using <br />at the site. <br />In general, grading at the site, if any, should be performed in accordance with the <br />requirements of the City and under the geotechnical observation and testing of the project <br />geotechnical consultant. The compaction criterion for fill and backfill materials is a <br />minimum of 90% of the maximum density determined in accordance with ASTM Test <br />Method D1557. <br />Temporary Excavations <br />In general, temporary excavations should be performed in accordance with OSHA <br />requirements. In general, care should be taken during excavation near an existing <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.