My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6 E Hutton Center Dr #A-REV 1 - Plan
PBA
>
Building
>
ProjectDox
>
H
>
Hutton Center Dr
>
6 E Hutton Center Dr Unit# A
>
6 E Hutton Center Dr #A-REV 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:22 AM
Creation date
2/24/2026 5:00:36 AM
Metadata
Fields
Template:
Plan
Permit Number
20184271
101121211
Full Address
6 E Hutton Center Dr Unit# A
Street Number
6
Street Direction
E
Street Name
Hutton Center
Street Suffix
Dr
Unit Number
A
Document Relationships
101121211 - Permit
(Permit - Plan)
Path:
\Building\Permits\H\Hutton Center Dr\6 E Hutton Center Dr Unit# A
20184271 - Permit
(Permit - Plan)
Path:
\Building\Permits\H\Hutton Center Dr\6 E Hutton Center Dr Unit# A
Text box
ID:
1
Creator:
Import Agent
Created:
2/24/2026 5:00 AM
Modified:
2/23/2026 11:48 AM
Text:
VAHE GULAGIAN 11/13/2024
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONTRACTOR <br />SHEET DESCRIPTION: <br />COVER PAGE <br />DRAWN DATE 21.05.2024 <br />DRAWN BY CAMERON <br />REVIEWED BY SHELDON <br />REVISIONS <br />REV DESCRIPTION DATE <br />SHEET INDEX <br />UTILITY : SANTA ANA <br />PROJECT INFORMATION <br />AHJ : LOS ANGELES <br />ADDRESS : 6 HUTTON CENTRE <br />DRIVE, UNIT A, SANTA ANA, CA <br />92707 <br />NAME : WESTSIDE CONTRACTORS <br />APN : ---- <br />SYSTEM INFORMATION: <br />(8)EVO CHARGE <br />CHARGING STATIONS <br />SIGNATURE WITH SEAL <br />WESTSIDE CONTRACTORS - NEW EV CHARGING SYSTEM <br />6 HUTTON CENTRE DRIVE, UNIT A, SANTA ANA, CA 92707 <br />Know what's below. <br />CALL before you dig. <br />CALL AT LEAST TWO WORKING <br />DAYS BEFORE YOU DIG <br />USA <br />Nor t h <br />DIG ALERT <br />CONTRACTOR SHALL VERIFY ALL PLANS & EXISTING LOCATIONS, <br />CONDITIONS ON THE JOB SITE & SHALL IMMEDIATELY NOTIFY THE <br />ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE <br />PROCEEDING WITH THE WORK OR BE RESPONSIBLE FOR WORK. <br />SATELLITE VIEW: <br />VICINITY VIEW: <br />SYSTEM INFORMATION <br />MANUFACTURER EVO CHARGE <br />PRODUCT EVSE, iEVSE, iEVS PLUS <br />CONNECTOR SAE J1772 <br />LEVEL AC LEVEL 2 <br />MOUNTING WALL OR PEDESTAL <br />MAX OUTPUT 32A;7.68KW MAX OUTPUT <br />SCOPE OF WORK: <br />INSTALL AND ELECTRICALLY CONNECT EVSE <br />INFRASTRUCTURE AS SHOWN. CONTRACTOR <br />TO PROVIDE AND INSTALL THE WIRING <br />DEVICES INCLUDING ALL REQUIRED <br />ASSOCIATED ITEMS FOR A COMPLETE AND <br />OPERATIONAL SYSTEM INCLUDING THE <br />REQUIRED TESTING SPEED IN THE <br />ELECTRICAL SPEC PACKAGE. CONTRACTOR <br />SHALL ALSO PROVIDE THE REQUIRED SAW <br />CUTTING, TRENCHING, BACKFILLING AND <br />FINISHING OF THE AFFECTED LOT SURFACE <br />AND RESTORE TO ORIGINAL CONDITION. <br />PROVIDE AND INSTALL ALL ITEMS SHOWN ON <br />THE DRAWINGS AND AS SPECIFIED UNLESS <br />OTHERWISE NOTED AS NOT IN CONTRACT OR <br />EXISTING TO REMAIN. <br />TOTAL NUMBER OF EV CHARGERS: 8 <br />UTILITY: <br />MS-EV RATING: <br />MS EXISTING OR NEW: <br />SANTA ANA <br />225A <br />EXISTING <br />METER NO: <br />BUILDING TYPE: MULTIFAMILY APT COMPLEX <br />CHARGING KW CAPACITY: 6.656KW <br />SYSTEM VOLTAGE: 208 <br />SINGLE OR THREE PHASE: THREE PHASE <br />EVSE LOCATION: PARKING GARAGE <br />PROJECT INFORMATION: <br />APPLICABLE CODES: <br />2020 NATIONAL ELECTRICAL CODE <br />2022 BUILDING ENERGY EFFICIENCY STANDARDS <br />2022 CALIFORNIA BUILDING CODE (11B-228.3.1) <br />2022 CALIFORNIA ELECTRICAL CODE <br />THIS PROJECT IS EXEMPT FROM ACCESSIBLE <br />EV STALLS BECAUSE ALL EV STALLS WILL BE <br />ASSIGNED TO INDIVIDUAL TENANT <br />GENERAL CONSTRUCTION NOTES: <br />a. THE JOB SHALL BE MAINTAINED IN A CLEAN, ORDERLY CONDITION FREE OF DEBRIS <br />AND LITTER SHALL NOT BE UNREASONABLY ENCUMBERED WITH ANY MATERIALS OR <br />EQUIPMENT AND SHALL BE CLEANED AT THE END OF EACH WORKING DAY. <br />b. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. THE <br />OWNER'S REPRESENTATIVE SHALL BE NOTIFIED OF ANY DISCREPANCIES OF <br />INCONSISTENCIES. <br />c. IT SHALL BE CONTRACTORS RESPONSIBILITY TO DESIGN AND PROVIDE ACCURATE <br />SHORING AND BACKING REQUIRED FOR THE PROTECTION OF LIFE AND PROPERTY <br />DURING INSTALLATION. <br />d. ELECTRICAL EQUIPMENT AND APPARATUS INCLUDING BUT NOT LIMITED TO, <br />SWITCHBOARDS, MOTORS AND CONTROL CENTERS, PANEL BOARDS AND <br />TRANSFORMERS MUST BE SEISMIC-CERTIFIED AND ANCHORED ACCORDING TO <br />EQUIPMENT MANUFACTURER'S INSTALLATION INSTRUCTIONS (CEC 110.3 (B), CBC <br />1613.1, AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) 7-10, CHAPTER 13 SEISMIC <br />DESIGN REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS. <br />e. DUST SHALL BE CONTROLLED AT ALL THE TIMES. WASTE WATER GENERATED DURING <br />CONSTRUCTION SHALL NOT BE DISCHARGED INTO THE STORM DRAIN SYSTEM. THIS <br />INCLUDES WASTE FROM PAINTING, SAW CUTTING, CONCRETE WORK, ETC. THE <br />CONTRACTOR SHALL MAKE ARRANGEMENTS TO ELIMINATE DISCHARGES INTO THE <br />STORM DRAIN SYSTEM AND, IF NECESSARY, PROVIDE AN AREA FOR ON-SITE WASHING <br />ACTIVITIES DURING CONSTRUCTION. MATERIALS THAT COULD CONTAMINATE STORM <br />RUNOFF SHALL BE STORED IN AREAS THAT ARE DESIGNED TO PREVENT EXPOSURE TO <br />RAINFALL AND NOT ALLOW STORM WATER TO RUN ON TO THE AREA <br />f. CONSTRUCTION MATERIAL SHALL BE SPECIFIED AND REQUIRED BY THE LATEST <br />EDITION OF THE BUILDING CODE CURRENTLY ADOPTED BY THE AHJ INCLUDING <br />ANY/ALL LOCALLY ENFORCED CODES AND AUTHORITIES.ALL MATERIALS AND <br />EQUIPMENT SHALL BE INSTALLED, APPLIED AND CONNECTED AS DIRECTED BY THE <br />MANUFACTURERS LATEST WRITTEN SPECIFICATIONS EXPECT WHERE OTHERWISE <br />NOTED. MATERIALS NOTED ON THE DRAWINGS SHALL TAKE PRECEDENCE OVER THESE <br />SPECIFICATIONS. <br />SITE <br />SITE <br />CHARGIE LLC <br />3947 Landmark St, <br />Culver City, CA 90232 <br />(310) 307-5166 <br />JOHNNY HUSTON <br />LIC: #1086808 <br />EV-01 <br />THE PROJECT IS NOT IN THE FEMA DESIGNATED FLOOD ZONE (ZONE A OR E) <br />Bldg# 101121211 <br />Elec# 20184271 <br /> <br />APPROVALS: <br />PLNG - CSantana <br />BLDG - CSG Consultants <br />ELEC - CSG Consultants <br />6 E Hutton Center Dr <br />#A12/9/2024
The URL can be used to link to this page
Your browser does not support the video tag.