My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2350 S Pullman St-Phase I-DEF 1-Concrete Foundation Underpinning - Plan
PBA
>
Building
>
ProjectDox
>
P
>
Pullman St
>
2350 S Pullman St
>
2350 S Pullman St-Phase I-DEF 1-Concrete Foundation Underpinning - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:02:31 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20184030
30147790
40139535
101120904
101120905
101120906
Full Address
2350 S Pullman St
Street Number
2350
Street Direction
S
Street Name
Pullman
Street Suffix
St
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FINISH FLOOR0' - 0" <br />12345 <br />CONCRETE WALL W/ STUCCO <br />FINISH - COLOR TBD - SEE <br />CIVIL CONSTRUCTION <br />DOCUMENTS FOR WALL <br />NANAA NB NC ND NE NF <br />PARTIAL EXIST CANOPYTEMPORARY DUMPSTER LOCATION <br />MECHANICAL UNITS - SEE MECHANICAL <br />CONSTRUCTION DOCUMENTS <br />TRUCK BAY SCREEN <br />INSULATED METAL WALL <br />PANEL W/ TEXTURED <br />EXT. FINISH <br />EIFS CORNICE <br />METAL WALL COPINGEXIST TILT-UP CONCRETE WALL <br />CONCRETE FOUNDATION <br />WALL W/ STUCCO FINISH - <br />COLOR TBD <br />PANEL JOINTS W/ URETHANE SEALANT AND BACKER ROD TYP. COUMN LINE 1 THRU 3 <br />CONCRETE COATING B TO TOP OF EXIST. CONC. PANEL <br />FINISH FLOOR0' - 0" <br />1 2 <br />CONCRETE WALL - <br />SEE CIVIL CONTRACT <br />DOCUMENTS <br />NANBNCNDNF <br />TRUCK BAY SCREEN <br />EXIST TILT-UP CONCRETE WALL <br />INSULATED METAL WALL PANEL <br />W/ TEXTURED EXT. FINISH <br />EIFS CORNICE <br />LOADING BAY CANOPY <br />GUTTER AND DOWNSPOUT <br />ABCDEFGHJ <br />CONCRETE WALL W/ STUCCO FINISH - COLOR TBD - SEE CIVIL <br />CONSTRUCTION DOCUMENTS FOR WALL ELECTRICAL EQUIPMENT SCREEN <br />N3 N1N4N5N6N2 <br />MECHANICAL UNIT - SEE MECHANICAL <br />CONSTRUCTION DOCUMENTS <br />PAINT COLOR 1PAINT COLOR 1PAINT COLOR 1 <br />CONCRETE COATING A <br />CO <br />N <br />C <br />R <br />E <br />T <br />E <br /> <br />C <br />O <br />A <br />T <br />I <br />N <br />G <br /> <br />A <br />TEMPORARY TENT <br />INSULATED METAL WALL PANEL W/ <br />TEXTURED EXT. FINISH <br />EIFS CORNICE <br />LOADING BAY CANOPY PAINT COLOR 2 PAINT COLOR 2 <br />CONCRETE FOUNDATION WALL W/ <br />STUCCO FINISH - COLOR TBD PANEL JOINT W/ URETHANE SEALANT AND BACKER <br />ROD, TYP. COLUMN LINES E THRU J. <br />PAINT COLOR 1 <br />FINISH FLOOR0' - 0" <br />1 2 3 <br />DOCK ADDITION <br />131 <br />NA NAANBNCNDNENF <br />REMAINING PORTION OF EXIST CANOPY <br />FINISH FLOOR0' - 0" <br />DOCK ADDITION <br />131 <br />TRUCK BAY SCREENCONCRETE WALL - SEE CIVIL <br />CONTRACT DRAWINGS <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />ELEVATION SHEET GENERAL NOTES <br />CONTROL JOINTS SHALL BE LOCATED IN THE EXTERIOR MATERIALS AS NOTED, <br />OR IF NONE SHOWN, THEN AS REQUIRED BY EXTERIOR MATERIALS <br />MANUFACTURER. REVIEW SPACING AND LOCATIONS OF CONTROL JOINTS WITH <br />ARCHITECT/ENGINEER. <br /> <br />SEALANT COLORS SHALL MATCH THE COLOR OF THE FINISH MATERIALS <br />SURROUNDING IT. REVIEW THE COLOR SELECTION WITH THE <br />ARCHITECT/ENGINEER. <br />UNLESS NOTED OTHERWISE, ACCESS LADDERS AND RAILINGS NOTED TO BE <br />PAINTED SHALL BE PAINTED TO MATCH THE WALL ON WHICH THEY ARE <br />MOUNTED. REVIEW THE COLOR SELECTION WITH THE ARCHITECT/ENGINEER. <br /> <br />UNLESS NOTED OTHERWISE, THE SCUPPERS, GUTTERS AND DOWNSPOUTS <br />SHALL BE FACTORY FINISHED TO MATCH THE SURROUNDING WALL AND THE <br />METAL CAPPING, IF ANY. REVIEW THE COLOR SELECTION WITH THE <br />ARCHITECT/ENGINEER. <br />SEE STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE <br />PROTECTION DRAWINGS FOR OTHER ITEMS MOUNTED ON OR PENETRATING <br />THROUGH THE EXTERIOR WALLS. <br />PROVIDE BLOCKING, STRAPPING, AND SUPPORT WITHIN PARTITIONS, WALLS, <br />OR CEILINGS TO ATTACH SURFACE MOUNTED ITEMS AS NEEDED. <br />METAL SCREEN PANEL <br />VOID (TYP.) <br />DRAWN BY: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />CHECKED BY: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />SHEET ISSUE DATE: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />SHEET NUMBER <br />THE INFORMATION CONTAINED ON THIS AND ANY <br />RELATED DOCUMENT SHALL NOT BE USED FOR <br />ANY PURPOSE OTHER THAN THE CONVEYANCE <br />OF INFORMATION FOR THE STATED CLIENT AND <br />PROJECT WITHOUT THE EXPRESS WRITTEN <br />CONSENT OF THE ENGINEER. <br />ANY INFORMATION TRANSFERRED OR UTILIZED <br />IN AUTOCAD .DWG FORMAT SHALL BE USED FOR <br />REFERENCE ONLY <br />WEBBER/SMITH Associates, Inc. <br />20 Wright Avenue <br />Lititz, Pennsylvania 17543 <br />Phone: 717.625.4140 <br />Email:info@webbersmith.com <br />SHEET TITLE: <br />FOR <br />DRAWING STATUS <br />FINAL <br />PROJECT NUMBER <br />www.webbersmith.com <br />SEAL <br />B-200-1 <br />RBF <br />EJE <br />04/02/2024 <br />BUILDING <br />ELEVATIONS & <br />SECTIONS <br />2350 PULLMAN ASPIRE BAKERY <br />2350 PULLMAN STREET <br />SANTA ANA, CA 92705 <br />CA <br />5387 <br />© 2024 WEBBER/SMITH Associates, Inc., All Rights Reserved <br />2350 <br />PULLMAN,LLC <br /> 1/8" = 1'-0"B-200-1 <br />1 NORTH BUILDING ELEVATION <br /> 1/8" = 1'-0"B-200-1 <br />3 PARTIAL SOUTH BUILDING ELEVATION <br /> 1/8" = 1'-0"B-200-1 <br />2 WEST BUILDING ELEVATION <br /> 1/8" = 1'-0"B-200-1 <br />4 ADDITION/EXIST CANOPY SECTION <br /> 1/8" = 1'-0"B-200-1 <br />5 TRUCK BAY ADDITION/DOCK ADDITION SECTION <br /> 1/4" = 1'-0"B-200-1 <br />8 ELEC EQUIP SCREEN ELEVATION <br /> 1/4" = 1'-0"B-200-1 <br />7 ELEC EQUIP SCREEN ELEVATION <br /> 1/4" = 1'-0"B-200-1 <br />6 TRUCK BAY SCREEN ELEVATION <br /> 1/4" = 1'-0"B-200-1 <br />9 <br />TYPICAL METAL SCREEN PANEL <br />ELEVATION <br />NO.DATE DESCRIPTION <br />A 04/02/2024 ISSUED FOR PERMIT AND <br />CONSTRUCTION <br />B 01/07/2025 BULLETIN #5R1 - PHASE 1 <br />B <br />01- <br />REGISTERED PROFESSIONAL ENGINEER67268RICHARD MAURICE THIBEAULT <br />STATE OF CALIFORNIACIVIL <br />1/7/25 <br />2350 S Pullman St - <br />Phase I3/4/2025
The URL can be used to link to this page
Your browser does not support the video tag.