Laserfiche WebLink
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ACCURATELY SIZING, LOCATING, AND CUTTING <br /> ALL OPENINGS REQUIRED FOR FIRE PROTECTION SYSTEMS. REFERENCE I SERIES DRAWINGS <br /> FOR PENETRATION DETAILS. COORDINATE WITH CONTRACTOR INSTALLING / RESPONSIBLE FOR <br /> INSTALLING THE WALL, FLOOR, PANEL, CEILING, FOUNDATION OR ROOF. <br />PENETRATION DETAILS <br />PIPE MATERIAL / VALVE SCHEDULE <br />SYSTEM DESCRIPTION LOCATION SIZES MATERIAL <br />PIPING <br />STANDARDS METHOD <br />CONNECTIONS / FITTINGS <br />STANDARDS TYPE <br />VALVES <br />METHOD NOTES <br />FIRE PROTECTION ABOVE GROUND ASTM A 135 / A 135 M <br />ASTM A 795 / A 795 M <br />ASTM B16.3 <br />ASTM A 536 <br />ISOLATION VALVES <br />CLASS RATED <br />150 PSI SWP, 600 PSI NON-SHOCK CWP <br />125 PSI SWP, 200 PSI NON-SHOCK CWPN/A <br />FIRE PROTECTION ABOVE GROUND 2" & SMALLER ASTM A135 / A 135 M <br />ASTM A795 / A 795 M <br />ASME B36.10M2-1/2" & LARGER <br />FIRE PROTECTION ABOVE GROUND 2" & SMALLER ASTM A53 / A 53 M <br />2-1/2" & LARGER <br />GROOVED-END <br />ASTM A 47/A 47M <br />ASTM B16.3 <br />ASTM A 536 <br />ANGLE VALVES <br />BUTTERFLY VALVES <br />175 PSI SWP, 400 PSI NON-SHOCK CWP <br />GATE VALVES <br />GLOBE VALVES <br />ISOLATION VALVES <br />BUTTERFLY VALVES <br />GATE VALVES <br />ISOLATION VALVES <br />BUTTERFLY VALVES <br />GATE VALVES <br />ASTM A 47/A 47M <br />ASTM B16.3 <br />ASTM A 536 <br />150 PSI SWP, 600 PSI NON-SHOCK CWPN/A <br />150 PSI SWP, 600 PSI NON-SHOCK CWPN/A <br />125 PSI SWP, 200 PSI NON-SHOCK CWP <br />125 PSI SWP, 200 PSI NON-SHOCK CWP <br />100 PSI SWP, 150 PSI NON-SHOCK CWP <br />100 PSI SWP, 150 PSI NON-SHOCK CWP <br />GROOVED-END <br />FLANGED <br />CONDENSATE DRAIN ABOVE GROUND 2" & SMALLER COPPER TUBE, TYPE L, HARD DRAWN ASTM B88 LEAD FREE 95-5, <br />TIN/ANTIMONY SOLDER <br />ASTM B16.18, <br />ASTM B16.22 <br />ISOLATION VALVES <br />GLOBE VALVES <br />THREADED 95/5 LEAD FREE SOLDER <br />CHECK VALVES <br />150 PSI SWP, 600 PSI NON-SHOCK CWP <br />125 PSI SWP, 200 PSI NON-SHOCK CWP125 <br />GATE VALVES <br />N/A <br />GALVANIZED STEEL, SCHEDULE 30 <br />GALVANIZED STEEL, SCHEDULE 40 <br />BLACK STEEL, SCHEDULE 40, GRADE B <br />BLACK STEEL, SCHEDULE 30 THREADED <br />GROOVED-END <br />GALVANIZED STEEL, SCHEDULE 10 <br />BLACK STEEL, SCHEDULE 10 <br />THREADED <br />2-1/2" & LARGER <br />THREADED <br />GROOVED-END <br />GROOVED-END <br />FLANGED <br />THREADED <br />GROOVED-END <br />COMPRESSED AIR ABOVE GROUND 2" & SMALLER <br />2-1/2" & LARGER <br />BLACK STEEL, SCHEDULE 40, <br />TYPE E or S, GRADE B <br />ASTM A 53/A 53M <br />GROOVED-END <br />ASME B16.3, CLASS 150 or 300 <br />BUTTERFLY VALVES <br />THREADED <br />ASTM A 47/A 47M FLANGED <br />CHECK VALVES <br />200 PSI NON-SHOCK CWP <br />125 PSI SWP, 200 PSI NON-SHOCK CWP2" & SMALLER <br />2-1/2" & LARGER 125 PSI SWP, 200 PSI NON-SHOCK CWP <br />125 <br />THREADED <br />GROOVED-END <br />ASME B16.3, CLASS 150 or 300 <br />ASTM A 47/A 47M <br />THREADED <br />FLANGED <br />ISOLATION VALVES THREADEDTHREADED 150 PSI SWP, 600 PSI NON-SHOCK CWPN/A <br />DISCLAIMER: <br />FIRE PROTECTION DRAWINGS BEING SUBMITTED ARE INTENDED TO BE <br />PERFORMANCE-LEVEL DOCUMENTS TO REFLECT SPACE / HAZARD <br />CLASSIFICATIONS AND PRELIMINARY DESIGN COORDINATION DETAIL, <br />ONLY. FINAL FIRE PROTECTION DESIGN SUBMISSION FOR PERMITTING <br />WILL BE THE RESPONSIBILITY OF THE FIRE PROTECTION CONTRACTOR. <br />1. THE FIRE PROTECTION PACKAGE IS A PERFORMANCE LEVEL <br />PACKAGE INTENDED TO DEFINE THE SCOPE AND NATURE OF THE <br />DELEGATED WORK. THE FIRE PROTECTION CONTRACTOR SHALL <br />PROVIDE THE FINAL DESIGN IN ACCORDANCE WITH THIS DESIGN <br />PACKAGE AND SHALL COMPLY WITH APPLICABLE OWNERS' <br />INSURANCE COMPANY AND FM GLOBAL DESIGN CRITERIA. <br />2.THE FIRE PROTECTION CONTRACTOR OR THEIR ASSOCIATED <br />DESIGN CONSULTANT SHALL BE LICENSED OR OTHERWISE <br />AUTHORIZED IN THE STATE OF CALIFORNIA TO PERFORM THE DESIGN <br />WORK INVOLVED AND SHALL SIGN AND CERTIFY IF REQUIRED BY <br />THE AHJ. <br />3. SITE VISITATION: VISIT THE SITE OF THE PROPOSED <br /> CONSTRUCTION TO BECOME THOROUGHLY FAMILIAR WITH ALL <br /> DETAILS OF THE WORK AND WORKING CONDITIONS. VERIFY ALL <br /> DIMENSIONS IN THE FIELD, AND ADVISE OWNER ON SITE <br /> SUPERVISION OF ANY DISCREPANCY BEFORE PERFORMING ANY <br /> WORK. <br />4. HYDROSTATICALLY TEST ENTIRE SYSTEM IN ACCORDANCE WITH <br /> FM GLOBAL. SYSTEM SHOULD BE TESTED TO 200 PSI OR 50 PSI <br /> ABOVE THE MAXIMUM SYSTEM OPERATING PRESSURE <br /> (WHICHEVER IS GREATER) FOR A MINIMUM OF 2 HOURS. <br />5. INSTALL PIPING IN ACCORDANCE WITH FM GLOBAL FOR <br /> SPRINKLER SYSTEMS, STANDPIPE AND HOSE <br /> SYSTEMS (AS APPLICABLE). <br />6. DO NOT ROUTE SPRINKLER PIPING DIRECTLY ABOVE ELECTRICAL <br /> PANELS PER NATIONAL ELECTRICAL CODE AND THE <br /> AUTHORITY HAVING JURISDICTION. <br />7. FIRE PROTECTION PIPING SHOULD NOT BE ROUTED OR TERMINATE IN <br /> FRONT OF WINDOWS. <br />8. PROVIDE SPRINKLER COVERAGE BELOW ANY DUCTWORK, <br /> CATWALKS, PLATFORMS AND/OR ANY OTHER OBSTRUCTION <br /> GREATER THAN 4'-0" WIDE AS REQUIRED TO MAINTAIN CEILING <br /> DENSITY REQUIREMENTS. <br />9. SPRINKLER TEMPERATURE RATINGS IDENTIFIED IN THE ROOM SCHEDULE <br /> DEPICT GENERAL ROOM REQUIREMENTS.SOME SPRINKLERS <br /> MAY REQUIRE HIGHER TEMPERATURE RATINGS DEPENDING ON THE <br /> LOCATION OF SPRINKLERS RELATIVE TO HEAT PRODUCING EQUIPMENT, <br /> PIPING, ETC.THE FIRE PROTECTION CONTRACTOR SHALL REVIEW <br /> PROJECT DRAWINGS TO IDENTIFY ANY AREAS WHERE HIGHER SPRINKLER <br /> TEMPERATURE RATINGS ARE REQUIRED PER FM GLOBAL. <br />GENERAL NOTES: <br />Fire Protection Zones <br />1 <br />NOT REQUIRED <br />DOCK ADDITION <br />131 <br />TEMPORARY <br />TENT <br />133 <br />1 <br />2 <br />3 <br />MAX. CEILING TEMP. (°F) <br />100 <br />TEMP. RATING (°F) <br />135-170 <br />TEMP. CLASSIFICATION (°F) <br />ORDINARY <br />COLOR CODE <br />BLACK OR NONE <br />GLASS BULB COLOR <br />RED OR ORANGE <br />150 175-225 INTERMEDIATE WHITE YELLOW OR GREEN <br />225 250-300 HIGH BLUE BLUE <br />300 325-375 EXTRA HIGH RED PURPLE <br />375 400-475 VERY EXTRA HIGH GREEN BLACK <br />475 500-575 ULTRA HIGH ORANGE BLACK <br />625 650 ULTRA HIGH PINK BLACK <br />SPRINKLER HEAD TEMPERATURE RATINGS AND COLOR CODINGS <br />DRAWN BY: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />CHECKED BY: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />SHEET ISSUE DATE: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />SHEET NUMBER <br />THE INFORMATION CONTAINED ON THIS AND ANY <br />RELATED DOCUMENT SHALL NOT BE USED FOR <br />ANY PURPOSE OTHER THAN THE CONVEYANCE <br />OF INFORMATION FOR THE STATED CLIENT AND <br />PROJECT WITHOUT THE EXPRESS WRITTEN <br />CONSENT OF THE ENGINEER. <br />ANY INFORMATION TRANSFERRED OR UTILIZED <br />IN AUTOCAD .DWG FORMAT SHALL BE USED FOR <br />REFERENCE ONLY <br />WEBBER/SMITH Associates, Inc. <br />20 Wright Avenue <br />Lititz, Pennsylvania 17543 <br />Phone: 717.625.4140 <br />Email:info@webbersmith.com <br />SHEET TITLE: <br />FOR <br />DRAWING STATUS <br />FINAL <br />PROJECT NUMBER <br />www.webbersmith.com <br />SEAL <br />F-001-1 <br />KCH <br />JSD <br />04/02/2024 <br />OVERALL FIRE <br />PROTECTION PLAN <br />2350 Pullman WSS OCTA Aspire <br />Bakeries <br />2350 Pullman Street <br />Santa Ana, CA 92705 <br />CA <br />5387 <br />© 2024 WEBBER/SMITH Associates, Inc., All Rights Reserved <br />2350 <br />Pullman,LLC <br />AREA OF PRODUCTION APPLICABLE FM DATA SHEET <br />PRODUCTION, UTILITY, OFFICE / <br />EMPLOYEE SPACES 3.26 <br />SHEET INDEX - FIRE PROTECTION - <br />SHEET <br />NUMBER SHEET NAME <br />F-001-1 OVERALL FIRE PROTECTION PLAN <br />1/16" = 1'-0"F-001-1 <br />5 DESIGN CRITERIA - FIRE PROTECTION ZONES Fire Protection Room Schedule Phase 1 <br />Number Name Area (SF) Room Temperature (°F) FP Occupancy FP Zone FP System Type FP SPRINKLER TYPE <br />FP STAINLESS STEEL <br />REQUIREMENT FP NOTES <br />131 DOCK ADDITION 1714 72-75 HC-1 1 WET UPRIGHT - <br />1 AREA TO BE SERVICED OFF OF THE <br />EXISTING RISER SERVING THE REST OF THE <br />BUILDING. EXTEND SPRINKLER PIPING AND <br />PROVIDE NEW SPRINKLER HEADS. <br />SHEET KEYED NOTES 1X <br />2 NEW SPRINKLER PIPING SHALL BE <br />CONFIGURED TO ACCOMMODATE <br />APPROXIMATELY 630 SF ADDITION <br />ASSOCIATED WITH PHASE 2. <br />3 FOR THIS PROJECT, PROVIDE THE SAME <br />TYPE OF SPRINKLER HEADS USED IN THE <br />EXISTING FACILITY. <br />1. DELEGATED DESIGN: ENGAGE A QUALIFIED PROFESSIONAL ENGINEER TO <br />DESIGN SEISMIC CONTROLS FOR FIRE SUPPRESSION PIPING. <br />2.SEISMIC DESIGN CALCULATIONS: PERFORM CALCULATIONS TO OBTAIN <br />FORCE INFORMATION NECESSARY TO PROPERLY SELECT RESTRAINT <br />DEVICES, FASTENERS, AND ANCHORAGE. <br />VIBRATION AND SEISMIC CONTROLS FOR FIRE SUPPRESSION PIPING <br />NO. DATE DESCRIPTION <br />A 04/02/2024 ISSUED FOR PERMIT AND <br />CONSTRUCTION <br />REGISTERED PROFESSIONAL ENGINEER33478 <br />JAMES S DEPEW <br />STATE OF CALIFORNIAMECHANICAL <br />4/2/24 <br />2350 S Pullman St - <br />Phase I3/4/2025