Laserfiche WebLink
DR <br />I <br />P <br />L <br />I <br />N <br />E <br />DR <br />I <br />P <br />L <br />I <br />N <br />E <br />SECTION <br />SCALE: 3/4"=1'-0" <br />LEGEND <br />IF BUILDING OR STRUCTURE WALL - PROVIDE SURFACE DRAINAGE <br />OF LOW POINTS TO PREVENT STAGNANT SATURATED SOIL. <br />PRUNING MAY BE NECESSARY TO FACILITATE REMOVAL OF DEAD <br />WOOD, CONFLICT WITH STRUCTURE, OR TO REDUCE STRESS. <br />PRUNING SHALL BE SUBJECT TO APPROVAL AND DIRECTION OF <br />OWNER REPRESENTATIVE. <br />FENCE THE PERIMETER OF DRIPLINE WITH CONTINUOUS 5' TALL <br />FLUORESCENT SAFETY MESH FENCING. <br />WHEN TRENCHING AND EXCAVATING WITHIN SITE OF TREE: <br />A. CUT AS FEW ROOTS AS POSSIBLE AND CUT THEM CLEAN. <br />B. PAINT CUT ROOTS WITH APPROVED DRESSING. <br />C. BACKFILL AS SOON AS POSSIBLE TO AVOID ROOTS DYING. <br />D. COVER EXPOSED ROOTS WITH BURLAP AND KEEP ROOTS MOIST. <br />MAINTAIN ORIGINAL GRADE OF SOIL <br />BORE UTILITY LINES WITHIN DRIPLINE OF TREE. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />GENERAL CARE NOTES: <br />1 DO NOT STORE LIQUIDS, CONSTRUCTION MATERIALS, OR VEHICLES <br />AND EQUIPMENT WITHIN FENCED AREA. <br />2 APPLY WATER AS NECESSARY TO MAINTAIN IN HEALTHY GROWING <br />CONDITION. <br />3 DO NOT POUR OR RINSE PAINTS OR TOXIC LIQUIDS WITHIN DRIPLINE <br />OF TREE. <br />2 <br />1 <br />3 <br />4 <br />6 <br />5 <br />TREE ROOTBALL DRAINAGE AND AERATION <br />2" <br />MIN. <br />6" <br /> <br />M <br />I <br />N <br />. <br />2" <br />4" <br />MIN. <br />LEGEND <br />1'-0" DIAMETER AUGER HOLE. <br />FILTER FABRIC AT TOP OF AUGER <br />HOLE. <br />2" LAYER OF MULCH, PULL MULCH <br />AWAY FROM CROWN 4" TO 8" ALL <br />AROUND. <br />4" WATER BASIN. REMOVE 60 DAYS <br />AFTER PLANTING. <br />BACKFILL MIX FIRM BUT NOT <br />COMPACTED. <br />INSTALL ROOT BARRIER AT PAVING <br />WITHIN 5' OF TREE (SEE PLANTING <br />NOTES). PLANT TREE 1" ABOVE <br />FINISH GRADE. <br />CUT CIRCLED AND MATTED ROOTS <br />FROM NURSERY ROOTBALL. <br />3" O.D. PERFORATED SDR-35 PVC <br />PIPE, WRAPPED IN FILTER FABRIC, <br />SLOPE TO SUMP. <br />6" HIGH NATIVE "UNDISTURBED" <br />SOIL SHELF UNDER ROOTBALL. 3" <br />O.D. SDR-35 PVC PIPE TO BE <br />PLACED 6" BELOW ROOTBALL, <br />TYPICAL. <br />NATIVE SOIL. <br />3" O.D. SDR-35 PVC PIPE W/BLACK <br />NDS GRATED DRAIN CAP 1" ABOVE <br />FINISH GRADE, SPREAD MULCH TO <br />HIDE PIPE, REMOVE TAGS. <br />INSTALL HORIZONTAL <br />PERFORATED PIPE 6" BELOW <br />BOTTOM OF THE ROOT BALL, <br />TYPICAL. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />NOTES: <br />1.PLANT PIT TO BE 2" LESS THAN <br />ROOTBALL DEPTH, ROOT CROWN <br />TO SIT AT 2" ABOVE GRADE. <br />2.SCARIFY SIDES OF PLANT PIT. <br />3.FLOOD PLANT PIT TO TEST <br />PERCOLATION/ ABSORPTION OF <br />WATER PRIOR TO INSTALLING THE <br />DRAIN OR TREE. NOTIFY THE <br />LAND. ARCH IF STANDING WATER <br />IS PRESENT AFTER 12 HRS. <br />4.ALL PLANT MATERIAL SHALL HAVE <br />2" TO 4" LAYER OF NITROLIZED <br />WOOD CHIP MULCH, TYP. PLACED <br />IN WATER RETENTION BASIN. <br />5.LIBERALLY DUST SIDES AND <br />BOTTOM OF PITS W/ FINELY <br />GROUND AGRICULTURAL GYPSUM. <br />SECTION 'A' <br />N.T.S. <br />2 <br />1 <br />5 <br />9 <br />8 <br />5 <br />7 <br />9 <br />8 <br />N.T.S. <br />PLAN <br />PVC DRAIN SECTION 'B' <br />N.T.S. <br />6' <br />- <br />0 <br />" <br />3' <br />- <br />6 <br />" <br />2' <br />- <br />0 <br />" <br />MI <br />N <br />. <br />2x DIA. OF <br />ROOTBALL <br />3" <br />2% <br />MIN. <br />2% <br />MIN. <br />5' <br />- <br />0 <br />" <br />6" <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />1 <br />2 <br />11 <br />1'-0" <br />DIA. <br />2" <br /> <br />L <br />A <br />R <br />G <br />E <br />R <br />TH <br />A <br />N <br />RO <br />O <br />T <br />B <br />A <br />L <br />L <br />TREE PLANTING W/ LINEAR ROOT BARRIER <br />N.T.S. <br />SECTION A-A <br />NOTES: <br />1 POSITION BARRIER AS CLOSE TO <br />CURB OR SIDEWALK AS POSSIBLE. <br />RAISED ROOT PROTECTORS <br />SHALL BE FACING TOWARDS THE <br />TREE. <br />3 TOP OF BARRIER SHALL BE 1" <br />ABOVE FINISHED GRADE. <br />4 LENGTH OF ROOT BARRIER SHALL <br />BE EQUAL TO THE DRIPLINE OF <br />THE PARTICULAR TREE TO BE <br />PLANTED AS DEFINED BY THE <br />MINIMUM SPACING DISTANCE IN <br />THE TREE PLANTING GUIDELINE. <br />5 APPLY A MASTIC SEALER TO JOINT <br />BETWEEN CONCRETE SURFACES <br />AND ROOT CONTROL BARRIER. <br />LEGEND <br />TREE ROOTBALL: 5 & 15 GAL. 1" <br />ABOVE GRADE, 24" BOX & LARGER <br />3" ABOVE GRADE, TAPER <br />ROOTBALL TO GRADE <br />NOT USED <br />PREPARED BACKFILL PER <br />PLANTING NOTES. <br />APPROVED ROOT CONTROL <br />BARRIER AND INSTALLATION THIS <br />DETAIL; <br />USE ROOT BARRIERS WHERE- <br />EVER TREES ARE PLANTED WITHIN <br />5' OF ANY , STRUCTURE, <br />CONCRETE FLATWORK, CURB AND <br />GUTTER, UTILITIES, ETC. <br />FINISHED GRADE <br />SEE TREE ROOTBALL DRAINAGE <br />AND AERATION DETAIL FOR 24" <br />BOX OR LARGER UNLESS NOTED <br />OTHERWISE. <br />NOT USED <br />CONCRETE CURB. <br />DRIP LINE OF TREE (DEFINED BY <br />THE MINIMUM SPACING DISTANCE <br />IN THE TREE PLANTING <br />GUIDELINES). <br />CONCRETE FLATWORK. <br />3/4" TO 1/2" GRAVEL OR CRUSHED <br />ROCK <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />1 <br />3 <br />12 <br />4 <br />11 <br />6 <br />7 <br />SECTION <br />N.T.S. <br />2X ROOTBALL <br />DIAMTER <br />6" MIN. <br />DE <br />P <br />T <br />H <br />RO <br />O <br />T <br />B <br />A <br />L <br />L <br />6" <br />4" <br /> <br />M <br />I <br />N <br />. <br />9 <br />6 <br />11 <br />4 <br />12 <br />N.T.S. <br />PLAN <br />11 <br />4 <br />12 <br />9 <br />10 <br />A <br />A <br />48" BOX AND SMALLERN.T.S. <br />SECTION <br />PREVAILING <br />WIND <br />STANDARD TREE STAKING <br />LEGEND <br />TREE TRUNK <br />2" DIA. x 12' LONG MIN. LODGE POLE PINE STAKES: ONE STAKE <br />FOR 5 GAL.,TWO STAKES FOR 15 GAL. AND LARGER TREES. (2) <br />TWO - 3" DIA. STAKES FOR 36" BOX AND LARGER. <br />EZ CINCH TREE TIE. LOOP CINCH TIE AROUND TREE BRANCH, <br />TWIST TIE, THEN LOOP AROUND STAKE & DRIVE NAIL <br />THROUGH THE TIE AT THE BACK OF STAKE. PROVIDE TWO <br />TIES FOR 5 GAL. & 3 TIES FOR 15 GAL. & LARGER TREES PER <br />MANUFACTURERS DIRECTION. <br />5 GAL. & 15 GAL., 1" ABOVE GRADE. 24" BOX & LARGER, 3" <br />ABOVE GRADE. TAPER ROOTBALL TO GRADE. <br />4" HIGH WATER RETENSION BASIN. FORM FROM PLANT PIT <br />EXCAVATION. MAY BE RAKED OUT PRIOR TO OTHER WORK AS <br />DIRECTED BY LANDSCAPE ARCHITECT. <br />FINISHED GRADE <br />FERTILIZER TABLETS PER PLANTING NOTES. <br />PREPARED BACKFILL PER PLANTING NOTES. <br />6" ZONE OF OVER EXACAVATED & RECOMPACTED NATIVE <br />SOIL. <br />SEE TREE ROOTBALL DRAINAGE AND AERATION DETAIL FOR <br />24" BOX OR LARGER UNLESS NOTED OTHERWISE. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />2X <br />ROOTBALL <br />DIAMETER <br />DE <br />P <br />T <br />H <br />RO <br />O <br />T <br />B <br />A <br />L <br />L <br />6" <br />NOTES: <br />1.PLANT PIT TO BE 2" LESS THAN <br />ROOTBALL DEPTH, ROOT CROWN <br />TO SIT AT 2" ABOVE GRADE. <br />2.SCARIFY SIDES OF PLANT PIT. <br />3.FLOOD PLANT PIT TO TEST <br />PERCOLATION/ ABSORPTION OF <br />WATER PRIOR TO INSTALLING THE <br />DRAIN OR TREE. NOTIFY THE <br />LAND. ARCH IF STANDING WATER <br />IS PRESENT AFTER 12 HRS. <br />4.ALL PLANT MATERIAL SHALL HAVE <br />2" TO 4" LAYER OF NITROLIZED <br />WOOD CHIP MULCH, TYP. PLACED <br />IN WATER RETENTION BASIN. <br />5.LIBERALLY DUST SIDES AND <br />BOTTOM OF PITS W/ FINELY <br />GROUND AGRICULTURAL GYPSUM. <br />SHRUB AND VINE PLANTING <br />LEGEND <br />ROOTBALL CROWN SHALL BE 1" <br />ABOVE FINISH GRADE AVOID <br />PLANTING SHRUBS DIRECTLY IN <br />FRONT OF IRRIGATION SPRAY <br />HEADS PROVIDE CLEARANCE <br />WHEN POSSIBLE, <br />3" HIGH WATER RETENSION BASIN. <br />FORM FROM PLANT PIT <br />EXCAVATION. MAY BE RAKED OUT <br />PRIOR TO OTHER WORK AS <br />DIRECTED BY LANDSCAPE <br />ARCHITECT. <br />FINISH GRADE. <br />FERTILIZER TABLETS PER <br />PLANTING NOTES. <br />PREPARED BACKFILL PER <br />PLANTING NOTES. <br />1 <br />2 <br />3 <br />4 <br />5 <br />1 <br />2 <br />3 <br />4 <br />5 <br />2X ROOTBALL <br />DIAMETER <br />DE <br />P <br />T <br />H <br />RO <br />O <br />T <br />B <br />A <br />L <br />L <br />6" <br />SECTION <br />N.T.S. <br />NOTES: <br />1.PLANT PIT TO BE 2" LESS THAN <br />ROOTBALL DEPTH, ROOT CROWN <br />TO SIT AT 2" ABOVE GRADE. <br />2.SCARIFY SIDES OF PLANT PIT. <br />3.FLOOD PLANT PIT TO TEST <br />PERCOLATION/ ABSORPTION OF <br />WATER PRIOR TO INSTALLING THE <br />DRAIN OR TREE. NOTIFY THE <br />LAND. ARCH IF STANDING WATER <br />IS PRESENT AFTER 12 HRS. <br />4.ALL PLANT MATERIAL SHALL HAVE <br />2" TO 4" LAYER OF NITROLIZED <br />WOOD CHIP MULCH, TYP. PLACED <br />IN WATER RETENTION BASIN. <br />5.LIBERALLY DUST SIDES AND <br />BOTTOM OF PITS W/ FINELY <br />GROUND AGRICULTURAL GYPSUM. <br />SCALE: <br />REVISIONS: <br />OW <br />N <br />E <br />R <br />: <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />N <br />A <br />M <br />E <br />: <br />CL <br />I <br />E <br />N <br />T <br /> <br />A <br />D <br />D <br />R <br />E <br />S <br />S <br />: <br />DATE ISSUED: <br />PROJECT NO: <br />10/23/2023 <br />CI <br />T <br />Y <br /> <br />O <br />F <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />DE <br />L <br />H <br />I <br /> <br />C <br />O <br />M <br />M <br />U <br />N <br />I <br />T <br />Y <br /> <br />C <br />E <br />N <br />T <br />E <br />R <br />RE <br />N <br />O <br />V <br />A <br />T <br />I <br />O <br />N <br />50 <br />5 <br /> <br />E <br />A <br />S <br />T <br /> <br />C <br />E <br />N <br />T <br />R <br />A <br />L <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />DESCRIPTION DATE <br />2022-40198 <br />THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO SVA ARCHITECTS <br />INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF <br />EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY <br />NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR <br />DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF SVA <br />ARCHITECTS INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. <br />6 HUTTON CENTRE DR, SUITE 1150 SANTA ANA, CA 92707 <br />T 949.809.3380 WWW.SVA-ARCHITECTS.COM <br />As Noted <br />SHEET <br />NUMBER:L6.401 <br />LANDSCAPE <br />PLANTING <br />DETAILS <br />E <br />H <br />RP <br />F <br />A <br />S <br />K M N-- <br />---- <br />-- <br />J <br />L O - <br />Q T - <br />CB <br />1 <br />2 <br />FINISHED GRADE AT SOD AREAS <br />1 1 <br />2" <br />3 <br />4" <br />FINISHED GRADE AT MULCHED AREAS <br />3" DEPTH <br />TAPER VARIES 2'-5' <br />NOTES <br />1.TAPER MULCH DOWN TO 2" AT EDGES OF PLANTING <br />AREA (ADJACENT TO PAVING OR CURB) FOR A FLUSH <br />TRANSITION TO PAVING. REFER TO SHRUB PLANTING <br />DETAIL FOR MULCH APPLICATION. <br />2.DEPTH OF SOD SOIL VARIES, SOD SOIL ROOT ZONE <br />LAYER ASSUMED AT 3 <br />4". <br />SCALE: 3 <br />4" = 1'-0" <br />2" DEPTH <br />LEGEND <br />SOD SOIL LAYER. <br />FINISH GRADE (FG) 2 1 <br />4" BELOW FS PRIOR <br />TO PALCEMENT OF SOD TURF <br />FINISHED SURFACE <br />3" MULCH LAYER <br />FINISHED GRADE (FG) 2" BELOW FINISH <br />SURFACE <br />1 <br />2 <br />3 <br />4 <br />5 <br />3 <br />4 <br />5 3 <br />FINISHED GRADE AT MULCH AND SOD AREAS <br />TREE PROTECTION - <br />505 E Central Ave <br />#B11/6/2024