Laserfiche WebLink
CITY OF SANTA ANA <br />TABLE OF CONTENTS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />v <br />SECTION / ITEM PAGE <br />6.09 Vitrified Clay Pipe (VCP) Sewer Main ...........................................................................148 <br />6.10 Polyvinyl Chloride (PVC) Sewer Pipe ............................................................................150 <br />6.11 New Manhole Structures..................................................................................................154 <br />6.12 Remove Existing Manhole Structures .............................................................................155 <br />6.13 Abandon Existing Sewer Main ........................................................................................155 <br />6.14 Abandon Existing Manhole Structures ............................................................................156 <br />6.15 Construct 4” or 6” High Density Polyethylene (HDPE) Sewer Laterals and <br />Cleanouts (Pipe Burst) .....................................................................................................156 <br />6.16 Construct 4” or 6” Polyvinyl Chloride (PVC) Sewer Laterals and Cleanouts <br />(Open Trench) ..................................................................................................................159 <br />6.17 Connect Sewer Laterals ...................................................................................................161 <br />6.18 Closed Circuit Television (CCTV) Inspection of Sewer Main and Laterals ...................161 <br />6.19 Sewer Flow Level Monitoring & Alarming Device ........................................................163 <br />6.20 Repair Couplings .............................................................................................................163 <br />6.21 Sewer Flow Bypassing .....................................................................................................163 <br />6.22 Submittals ........................................................................................................................166 <br />7.00 Special Provisions - Water Main Improvements <br />7.01 General .............................................................................................................................168 <br />7.02 Open Trench Operations, Excavation, Bedding, and Backfill .........................................168 <br />7.03 Existing Utilities and Adjustments in Grade ...................................................................169 <br />7.04 Landscaping and Irrigation Repair...................................................................................170 <br />7.05 Portland Cement Concrete (PCC) Cross Gutter...............................................................170 <br />7.06 Temporary Paving ............................................................................................................170 <br />7.07 Permanent Asphalt Concrete Trench Pavement Replacement.........................................171 <br />7.08 Permanent Portland Cement Concrete (PCC) Trench Pavement Replacement <br />and Bus Pad Replacement ................................................................................................172 <br />7.09 Ductile Iron Water Main Pipe and Appurtenances ..........................................................174 <br />7.10 Polyvinyl Chloride (PVC) Water Main Pipe and Appurtenances ...................................176 <br />7.11 Bore and Jack, Install Steel Casing and Carrier Pipe .......................................................179 <br />7.12 Trace Wire .......................................................................................................................184 <br />7.13 Resilient Wedge Gate Valves ..........................................................................................186 <br />7.14 Butterfly Valves ...............................................................................................................187 <br />7.15 Water Service ...................................................................................................................189 <br />7.16 Fire Line Services ............................................................................................................190 <br />7.17 Fire Hydrant Assembly ....................................................................................................191 <br />7.18 Hot Tap Connection .........................................................................................................192 <br />7.19 Combination Air Valves (as needed) ...............................................................................193 <br />7.20 Vertical Offset (as needed) ..............................................................................................193 <br />7.21 Disinfection and Flushing Plan ........................................................................................193 <br />7.22 Water Main Tie-Ins, Shutdown, and Abandonment ........................................................194 <br />7.23 Asbestos Cement Pipe (ACP) ..........................................................................................195 <br />7.24 Submittals ........................................................................................................................196 <br />8.00 Special Provisions - Storm Drain Construction <br />505 E Central Ave <br />#B11/6/2024