Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br /> PROJECT TITLE <br /> <br />24 <br />PART 4 - EXISTING IMPROVEMENTS <br />SECTION 402 - UTILITIES <br />402-1 LOCATION <br />402-1.1 General <br />Add the following to this subsection: <br />The contractor is responsible to determine the exact location and depth of utilities and its service <br />connections during construction. The contractor shall notify the City of the exact location of any <br />utility or service connection which is not shown or is incorrectly shown on the plans. <br />In addition to calling Dig Alert, the contractor shall be expected to maintain liaison with the <br />affected utility company representatives, and shall notify them prior to beginning of the job and <br />each time the particular utility is or could possibly be affected at least 24 hours in advance. <br />All existing utility access frames and covers, both private and public, shall be located and <br />marked with paint on the pavement surface by the Contractor. <br />Upon completion of the project, the Contractor shall remove all painted utility markings done by <br />him/her or the respective utility owners from the surfaces of sidewalks, driveway approaches, <br />curbs and gutters using the removal method acceptable to the Engineer. Any damage to <br />sidewalks, driveway approaches, curbs and gutters due to the Contractor's removal operation <br />shall be repaired at the Contractor's expense and to the satisfaction of the Engineer. Payment for <br />removing utility markings shall be included in the other items of work, and no additional <br />compensation shall be allowed therefore. <br />If utility construction work within the area is required during the con struction of this project, the <br />Contractor is directed to cooperate with the utility company(s) and their workers to assure proper <br />installation of the utilities with a minimum of conflict. <br />PART 6 - TEMPORARY TRAFFIC CONTROL <br />SECTION 600 - ACCESS <br />600-1 GENERAL <br />Add the following to this subsection: <br />Intersections shall be kept open until work takes place within the intersection. Local vehicular <br />and pedestrian access, including access to driveways and businesses, shall be maintained at all <br />times. Pedestrian access across both streets in an intersection must be maintained at all times <br />with a minimum 4-foot width. <br />Notifications: <br />Prior to the start of construction operations, the Contractor shall notify the Police and Fire <br />Departments of the AGENCY, giving the approximate starting date, completion date, and the <br />505 E Central Ave <br />#B11/6/2024