Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />30 <br />The application of slurry shall be scheduled to commence after 8:00 a.m., and no <br />slurry operations shall be done after 2:00 p.m. unless otherwise approved by the <br />Engineer. Slurry shall be sufficiently cured for vehicle traffic without tracking or <br />damage to the surface by 3:00 p.m. on the same day. In case of damage done by <br />vehicles and/or pedestrians upon slurry that has not been sufficiently, the <br />Contractor shall replace all of the damaged work at the Contractor’s expense and <br />no additional compensation shall be made by the AGENCY. Final striping shall <br />be installed per Section 2.02, Striping (Traffic Stripes and Pavement Markings), <br />of these Special Provisions. <br />Section 302-4.9 entitled “Field Sampling and Testing” of the Standard Specifications <br />shall be modified to add the following: <br />Upon the Engineer’s direction, the Contractor shall slurry seal test sections within <br />the construction limits for each batch of slurry mix. No slurry shall be applied <br />until the test slurry sections have been approved by the Engineer. The costs of <br />these slurry tests shall be included in the unit price for slurry seal surfacing and no <br />additional compensation will be allowed therefore. <br />Section 302-4.10 entitled “Measurement” of the Standard Specifications shall be <br />modified to add the following: <br />Licensed weighmaster’s certificates showing gross, tare, and net weight of each <br />truck load of slurry mix shall be submitted to the Engineer by the Contractor for <br />each working day of slurry operation. <br />1.08 ASPHALT CONCRETE <br />Asphalt concrete construction shall conform to Section 200, 203, 302 and 400 of the <br />Standard Specifications, Section 92 of the Caltrans Standard Specifications and these <br />Special Provisions. <br />Coarse aggregate shall consist of material which at least 75% by weight shall be crushed <br />particles in lieu of the requirements of Section 400-4.2.3. <br />Tack coat is required and the cost thereof shall be included in the price paid per ton for <br />asphalt concrete. <br />The required asphalt concrete mix designs shall be as follows: <br /> Base Course III-B3-AR-4000 or PG 64-10 <br /> Leveling Course/Surface Course III-C3-AR-4000 or PG 64-10 <br /> Crack Filler III-F-AR-4000 or PG 64-10 <br />The top layer of asphalt concrete pavement shall be a leveling course that shall not <br />exceed 0.10' in compacted thickness. The leveling course shall be applied over both cold <br />mill and reconstruction areas concurrently. <br />505 E Central Ave <br />#B11/6/2024