My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />46 <br />provided by these special provisions, based on the opinion of the Contractor. Any <br />changes made by the Contractor shall be documented in conformance with these <br />special provisions. <br />The Contractor shall perform process and quality control sampling and testing, and <br />exercise management control to ensure that cold recycling and placement conforms to <br />these specifications. The Contractor shall provide a testing laboratory and personnel <br />to perform process and quality control sampling and testing during the cold recycling, <br />spreading, compaction, and finishing. The proficiency of testing laboratories and <br />sampling and testing personnel shall be reviewed and approved by the Engineer prior <br />to providing services to the project. <br />Sampling and testing shall be performed at a rate sufficient to ensure that cold <br />recycling, placement, compaction, and finishing conforms to these specifications. The <br />Engineer shall have unrestricted access to the laboratory, sampling, testing sites, and <br />all information resulting from mix design and quality control activities. All quality <br />control testing results shall be submitted to the Engineer on a daily basis. <br />The project shall be divided into lots of not greater than 1500 square yards. The <br />Contractor shall control the cold recycling operation as follows: <br />1. The Contractor shall measure and record the actual recycle depth at each end of <br />the milling drum at least once every 350 feet along the cut length. <br />2. The amount of emulsified recycling agent shall be within 0.5 percent of the job <br />mix formula established in the mix design for the cold recycled asphalt concrete <br />mixture. Emulsion usage shall be recorded for each lot. The percent of <br />emulsified recycling agent shall be determined based on the ratio of emulsion <br />used to the theoretical dry weight of the millings processed. <br />3. The Contractor shall measure and report in-place density, and relative compaction <br />for the lot, and shall rework or reprocess any lot not meeting the requirements of <br />these specifications. <br />4. Sample the recycled material behind the recycling equipment or the sized <br />reclaimed asphalt pavement prior to the addition of the emulsified recycling agent <br />for each lot. If the reclaimed asphalt pavement does not meet the allowable <br />maximum particle size, the test results shall be reported immediately to the <br />Engineer. The Contractor shall reprocess the material or take other corrective <br />actions to attain conformance. <br />5. On every third sample taken, the Contractor shall perform a wet field gradation <br />for material passing the 1-inch to No. 4 sieves. The Contractor shall compare the <br />sieved sample to the gradation band determined from the mix design and adjust <br />the emulsified recycling agent as needed. <br />Some sections of the pavement being recycled may require field adjustment for <br />optimum results. For any changes made by the Contractor from one lot to the next, <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.