My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />73 <br />3.02 PROJECT PHASING AND LANE REQUIREMENTS <br />The contractor shall construct the project in the following phases: <br />A. Outside – Inside: <br /> Phase I: All work on the outside lane including curb, gutter, sidewalk, and bus <br />pads. Maintain left turn lane and two through lane in each direction at all times. <br /> Phase II: All work in the middle portion of the street. Maintain two through lane <br />in each direction at all times. Keep left turn lane open at intersection until <br />construction is at the left turn lane or at the intersection. <br />B. One side – Other side: <br /> Phase I: All work on one side of the street including curb, gutter, sidewalk, and <br />bus pads. Maintain left turn lane and two through lane in each direction at all <br />times. The side of the roadway that requires widening will usually be Phase I. <br /> Phase II: All work on the other side of the street including curb, gutter, sidewalk, <br />and bus pads. Maintain two through lane in each direction at all times. Keep left <br />turn lane open at intersection until construction is at the left turn lane or at the <br />intersection. <br />C. One side – Other side – Middle: <br /> Phase I: All work on one side of the street including curb, gutter, sidewalk, and <br />bus pads. Maintain left turn lane and two through lane in each direction at all <br />times. The side of the roadway that requires widening will usually be Phase I. <br /> Phase II: All work on the other side of the street including curb, gutter, sidewalk, <br />and bus pads. Maintain two through lane in each direction at all times. Keep left <br />turn lane open at intersection until construction is at the left turn lane or at the <br />intersection. <br /> Phase III: All work in the median area that was not able to be done using the <br />previously mentioned methods. Maintain two through lane in each direction at all <br />times. Keep left turn lane open at intersection until construction is at the left turn <br />lane or at the intersection. <br />A traffic control meeting is required prior to starting work to discuss the required traffic <br />control plan. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.