My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />75 <br />3.04 TRAFFIC CONTROL PLAN PREPARATION AND SUBMITTAL <br />Prior to start of project, the contractor shall submit traffic control plan for approval on all <br />construction phases and/or stages. The traffic control plan shall be prepared by registered <br />Traffic/Civil Engineer specializing in Traffic Control. Unless directed otherwise, the <br />traffic control plan shall conform to the format and requirements identified in the City of <br />Santa Ana Standard Plan No. 1125F. <br />The submittal and review process is as follows: <br /> Within 1 week of receiving Award of Contract, contractor shall meet with the <br />City to discuss the proposed traffic control plan and construction phasing <br /> Traffic control plans must be submitted within 4 weeks of receiving Award of <br />Contract. <br /> The City will review all 1st submittal in 2 weeks. <br /> The City will review subsequence re-submittal with check print in 1 week. <br /> Contractor may submit traffic control plan for each Phase separately. <br /> Approval of the traffic control plan may take more than 2 submittals depending <br />on the completeness and thoroughness of the plan. <br /> Incomplete traffic control plan will be rejected without reviewing. The City will <br />not be responsible for any delay of the project due the incomplete submittal of the <br />traffic control plan. <br />3.05 PAYMENT <br />Payment for all traffic control, including but not limited to providing the CMS, preparing <br />traffic control plan, sandblasting, barricades, temporary striping, move-ins, and the above <br />warning signs shall be included in the other items of work involved and no additional <br />compensation will be allowed therefore. <br /> <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.