My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />78 <br />Materials lists, manufacturer's data, equipment brochures and operations manuals, <br />technical data, controller cabinet wiring diagram, and all other related equipment <br />information, shall be labeled and identified, and shall be submitted in bound booklet <br />form. <br />4.06 MAINTAINING EXISTING AND TEMPORARY ELECTRICAL SYSTEMS <br />The contractor shall keep the traffic signal system in operations at all times during <br />construction except for the two switchover shutdowns described below. <br />The traffic signal system consists of but not limited to the traffic signal and safety lights, <br />vehicle and pedestrian detection, twisted pair interconnect cables, fiber optic cables, <br />Emergency Vehicle and Railroad Pre-emption Systems, CCTV and/or Video Imaging <br />Detection Systems, Wireless Communication System. The contractor is required to <br />maintain these systems in working condition during construction by providing temporary <br />wiring, splicing, relocating or any other necessary action. If necessary, the Contractor <br />shall be responsible for providing temporary traffic signal modification plans prepared by <br />a registered Traffic/Civil Engineer specializing in Traffic Signal Modifications. <br />1. Traffic Signal and Safety lights: Contractor shall provide temporary overhead <br />wiring to maintain all vehicle and pedestrian signal indications and pedestrian <br />push buttons and safety lights in operation. Maintain operation of undamaged <br />loops where feasible. Contractor shall provide temporary traffic signal equipment <br />(including detection devices) to maintain operations of signalized intersection. <br />2. Traffic Signal Fiber Optic and Interconnect Cable: Contractor shall provide <br />temporary cable and/or splicing necessary to maintain continuous communication <br />from the TMC to the traffic signal under construction and other traffic signals on <br />the same fiber optic and interconnect cable. <br />3. Emergency Vehicle and Railroad Pre-emption: Contractor shall provide <br />temporary wiring to maintain all pre-emption systems in working order. <br />4. CCTV System: Contractor shall provide temporary cable and/or splicing <br />necessary to maintain the CCTV system in working order. <br />5. Temporary Video Detection: Where temporary detection is required due to road <br />construction activity or extended overhead wiring, video detection shall be <br />installed before construction commences to ensure continuous operation of the <br />presence detection. <br />Traffic signal system shutdowns for switchover of equipment, if applicable, shall be <br />limited to two times per traffic signal. Each shutdown period shall be limited to the hours <br />between 9:00 AM and 3:00 PM. First shutdown is allowed for switching from the <br />existing wiring to the temporary wiring and second shutdown is allowed for switching <br />from the temporary wiring to the new permanent wiring. If deemed necessary by the <br />Engineer, the contractor shall provide traffic control personnel to direct traffic <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.