My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />103 <br />installation, (3) after installation but prior to connection to any other portion <br />of the system, and (4) during final system testing. All active components shall <br />be tested after installation. The Contractor shall provide all personnel, <br />equipment, instrumentation and materials necessary to perform all testing. <br />The Engineer shall be notified in writing a minimum of two working days <br />prior to all field tests. The notification shall include the exact location or <br />portion of the system to be tested. <br />Documentation of all test results shall be provided to the Engineer for <br />approval within two working days after the test involved. The Contractors <br />attention is directed to "As-Builts" elsewhere in these special provisions, <br />regarding the requirements for recording test results. <br />Attenuation tests shall be performed with an OTDR capable of recording and <br />displaying anomalies of 0.2 dB as a minimum. Single mode fibers (SM) shall <br />be tested at 1310 nm and 1550 nm. <br />The OTDR shall have a printer capable of producing a verifying test trace <br />with fiber identification as shown in the sample "Link Loss Budget Work <br />Sheet", numerical loss values, the date and the operator's name. It shall also <br />have a DOS based 3.5 inch-disk recording capability that has associated <br />software to do comparisons and reproductions on 8.5 inch x 11 inch paper, via <br />a personal computer. <br />Prior to arrival of the cable, the Contractor shall provide detailed test procedures <br />for all field testing to the Engineer. The procedures shall include the tests <br />involved and how the tests are to be conducted. These test plans shall be subject <br />to the approval of the Engineer. The procedures shall include the tests involved <br />and how the tests are to be conducted. Included in the test procedures shall be <br />the model, manufacturer, configuration, calibration and alignment procedures for <br />all proposed test equipment. <br />b. Factory Testing <br />Verification of the fiber specifications as listed in the Fiber Characteristics <br />Table shall be supplied by the Manufacturer with the appropriate <br />documentation. After cabling, before shipment but while on the shipping reel, <br />100 percent of all fibers shall be tested for attenuation. Copies of the res ults <br />shall be (1) maintained on file at the Contractor's, Manufacturer's and Owner's <br />place of business with a file identification number for a minimum of 10 years, <br />(2) attached to the cable reel in a waterproof pouch, and (3) submitted to the <br />Contractor and to the Engineer prior to the delivery of the cable to the job site. <br />c. Arrival On Site <br />The cable and reel shall be physically inspected by the Contractor on delivery <br />and 100 percent of the fibers shall be tested with the OTDR for attenuation to <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.