My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />105 <br />shall be replaced at the Contractor's expense. The new link shall then be <br />tested to demonstrate acceptability. Copies of the test results shall be <br />submitted to the Engineer for approval. <br />b. Test Failures <br />If during any of these system verification tests, the results prove to be <br />unsatisfactory, the fiber optic cable and or defective splice enclosures will <br />not be accepted. The unsatisfactory components shall be replaced at the <br />Contractor's expense. The new segment of cable shall undergo the same <br />testing procedure to determine acceptability. Copies of the test results <br />shall be submitted to the Engineer for approval. The removal and <br />replacement of a segment of cable shall be interpreted as the removal and <br />replacement of a single contiguous length of cable connecting two splices, <br />two connectors, or a splice and a connector. The removal of only the <br />small section containing the failure and therefore introducing new <br />unplanned splices will not be allowed. <br />4.33 CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM <br />When CCTV system is required, the Contractor shall furnish and install Axis Q6 155-E <br />PTZ Network Camera as shown on the plan. The CCTV system shall consist of <br />camera/pan-tilt assembly, mounting, cables, conductors and wires, control software and <br />video management system licensing. <br />1. Mounting <br />The Contractor shall mount the integrated camera/position unit on existing traffic <br />signal pole as shown on plans and per manufacturer’s recommendation. The <br />Contractor shall verify the mounting requirements of the integrated camera/position <br />unit, and the suitability of the approach depicted in these plans. The C ontractor may <br />request approval for alternate mounting details by submitting a shop drawing signed <br />by a registered Engineer. <br />2. Video Cable <br />The Contractor shall furnish and install manufacturer recommended Outdoor CAT-6 <br />Ethernet cable with IP66-rated connectors and incidental hardware from the camera <br />to an Ethernet switch in the cabinet to establish circuit continuity. The cable shall be <br />installed without damaging the conductors, dielectric or jacket. The cable ass embly <br />shall not be kinked or bent tighter than the Manufacturer's recommended bending <br />radius. <br />3. Testing <br />The Contractor shall test and document the installation and operation of all material, <br />equipment, cables and connectors for continuity, shorts or grounds. The Contractor <br />shall also carry out system integration testing to ensure that the video interface and <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.